PROJECT NAME :

Page: 1 of 1
Date:

HSE RISK ASSESSMENT FOR HOUSE AND BUILDING


RISK MATRIX
S = Severity

L = Likelihood

Likelihood

Severity

Very Likely

Fatality, Extensive damage

10

15

20

25

Likely

Major injury/damage, Long term health hazard

12

16

20

Probable

Significant injury/damage, Medium term health hazard

12

15

Possible

Minor injury/damage, 1st aid

10

Unlikely

Insignificant injury/damage

No

HAZARD / RISK DESCRIPTION

A - Acceptable

R - Reduce if possible or tolerate

Initial Risk
L

U - Unacceptable

CONTROL MEASURES

Residual Risk
L

Unloading Bricks/Blocks/Sand/Etc

Improve safe work system and provide correct P.P.E

Using the cement

Use proper P.P.E. (Specially, gloves, shoes and goggles)

Fall from height (working on scaffolding/working at heights)

Inspection all platforms, scaffolding before starting work. Edge protection


and use safety harness. Training in the understanding of falling from heights
and the hazards involved.

Using hand tools or power tools

Safety department certify all tools and equipments. Using corrective P.P.E

Slips, trips and fall

Proper housekeeping (Conducting daily tool box meeting)

Roof Carpentry Works

Concreting

Undertaken with the supervision of a competent person. Improve safe work


system and provide correct P.P.E
Wear appropriate PPE and monitor compliance.

Prepared by,

Approved by,

Safety Manager................................

Project Manager.........................................