(tiie) wags Sigua 21,50 as 2 i
mu
Kharafi National Ksc (closed) SEMIS
cron Date _:24 August 2011
Kuwait ue Ret: 16S1/AL965 11
Attention + Gary Miller Ure 436
Resident Engineer
Subject + Contract No. SE/144,
Rehabilitation of Mushrif Pumping St
Cost Proposal No. 36
Supply, Fabrication, Painting & Installation 24” Piping Spools.
Dear Sir,
Further to your comments on Surveillance Report ref. 165149R/020 dated 16 August 2011,
please find enclosed Cost proposal for the Supply, Fabrication, Painting and Installation of 24”
Piping Spools. The first stag inorder to arrest the leak chemical adhesive (Belzona 1221) shall
'be applied and in the second stage the damaged piping will be eplaced as per the proposed cost
proposal
‘The following items form part ofthis est proposal:
+ Cost Proposal No.36 fixed lump sum prices)
~ Mis ABI Engineering offer ref. 9125/A6/282-11 dated 22 August 2011
+ Surveillance eport No. 1651/SR/020 dated 16 August 2011
~ Chemica adhesive and treatments as atached (Belzons 1221) (temporty),
= 24" piping spools are specified inthe offer (permanent)
~ Time duration to complete the work is I stage Iwoek snd 2"
date of issumee ofthe approved VO.
ge 10 weeks from the
‘We trust the akove propostl is inline with your requirements, please issue the necessary site
‘work instruction and the approved variation order at the earliest. This for your information and
necessary action.
‘Yours faithfully,
Fadi Al Farra
Project Manager
EPCM - MEP Services
Brel. As stated above Das
sulositet4sem
CC: Eng. Ali Abu Al Banat
Eng. Adnan Al Qattan
EGA) reese | Lace Seccnent | CoeurProject, ‘Mish Pumping Station
Cost Proposal
Contract No. - SE144
Contract Description Rehabilitation of Mishrif Pumping Station
No. - 36
_ Supply, Fabricate, Painting, and deliver to
DeserPten) site 24" Piping Spools
Date = 08/23/2011
Additional Works KWO 11,533.33
Omission Works KWo) :
Net Cost Proposal Amount KWo 11,533,333,
Page tof 1reining Sae0
om
cua,
‘tied
| ] ]
oy | nt | tain | aieicon | Am
eee a
7 ae i ere |g | om | sane soa
Psat sant “ “
|
| | | —
Lf
|
| _ .
|
|
|
| lr]
| | | —
| |
— |
| 7
sun TorAL | xo, v0.00
|
[sin ve ro RD HAH [wo aman
Tora avorion re)
Patt‘ABJ Engineering & Contracting Company K.S.C (Closed)
INTER OFFICE MEMO
cestcne
EFERINCEs91aSACDEDN wees
SUBIECY = Quataten
as
4" Ping Spas for Mise amp Staion
Invtpnseto your FW 6-211 al 2 Ag 201 wet pn 9 cu
nctosipy rete pining ans cents nec without.
Cur Lumps pce for omit sae of wat al be KD. B40 (Kea Doan
gh Toatnd Sn Hadid Fy On
Maui
ste ied Pp Mail hb S16 0:7 Tl ge
‘To Puig Syst sal be Tre Cou pny be interna 000 Mee and extra
Joon
{10 es om een of eneEo PROJECT: REHABILITATION OF MUSHAIF PUMPING STATION P
F "SURVEILLANCE REPORT
lev conan aserne oipa resi Jane tesr/anran Yan baw tora
= | O [nec o0he
fenton] [sonata
ee. [O Sy
a EA
iatscrecat Onsran_C) omens
teh charge ns ate vata Wark OarProduct Data
Fast Curing Repair
Composite
Bon? 1221 Sipe EN) a tocarparent
‘eragarey pat corpse end on 8 cami.
‘erizeos poyrer omen. Tie My maine, Sane
ts baal he pane be.
Belzona® 1221
‘Super E-Metal
‘Betzonat 1221 (Super E-Motal) will
+ Simplify meintenance procedures
+ Reduce the need for spare parts
+ Cut downtime
+ Improve safety by reducing hot
work
Sizowt 1221 Gap EM ca be ein wiht
‘ead weit al Ibo oat
‘ytd ates ad can beached ag crore
took Mie mapupos eee opr ra ot
‘nadie eto swe tect Sora
em Sipe Trad
Applications for
Belzona’ 1221 (Super E-Metal)
Include:
+ Leaking pines
™ + Scored hydraulic rams
+ Leaking tanks
+ Stripped threads
+ Fractured ang holed castings
+ Groring seats
Seal enna Hones + Duets
‘and maintenance needsBelzona’ 1221
(Super E-Metal)
Simple
Safe
Versatile
+ Bonds strong te amor alli sustratie
Effective
+ Does rot coroge
Belzona® 1221
Super E-Metal
neler Seng
‘tg Sn pt ae mae ag sae iy
rman ct1000 Belzona® 1221
series __(Super eta) _
connTechnical Data sates
SS Oea yao
ing Properties eat Resistance
NGucefsobdena:t Soca Haat Distortion Temp:
a mice