Sie sind auf Seite 1von 11

SLBR @ KM 7.

550 KM ON TUNNEL CROSSING ACRESS BHIMA CANAL


SL.NO.

DISCRIPTION OF ITEM

Levelling coarse (PCC M10)


Abutments
Returns

Foundation (PCC M10)


Abutments
Returns

Sub-Structure (PCC M15)


Abutments
Returns

Super-Structure
Bed blocks (RCC M30)

Deck slab (RCC M30)


Approach Slab (RCC M30)
Kerbs (RCC M30)
Parapet walls (RCC M30)
Wearing coat (PCC M35)

REINFORSEMENT DETAILS
BED BLOCKS
10mm dia main bar
Stirrups 10mm dia @ 200mmc/c
12mm dia main bar in Dirt wall
Dirtwall stirrups 10mm dia
DECK SLAB
Main bars 16mm dia @ 100mm c/c
Dist.bars 12mm dia @ 300mm c/c
Main bars 10mm dia @ 300mm c/c
Dist. bars 10mm dia @ 300mm c/c
Kerb main bars 20mm dia
Kerb stirrups 10mm dia @ 600mm c/c
chairs 16mm dia
APPROACH SLAB
12mm dia @ 150mm c/c both ways
Chairs 12mm dia
PARAPET main bars 12mm dia
Parapet Stirrups 10mm dia @ 600mm

NOS

QTY

1
2

x
x

2
2

5.60
3.20

4.25
2.75

0.10
0.10

2.76
3.52
8.28

1
2

x
x

2
2

5.40
3.10

4.05
2.55

0.15
0.15

6.56
4.74
11.30

1
1
2

x
x
x

2
2
2

5.10 3.95+0.8/2
5.10
0.80
3.10 2.25+0.5/2

2.1
1.50
4.32

50.87
12.24
73.66
136.77

1
1

x
x

2
2

5.10
5.10

0.80
0.40

0.30
0.42

1
1
1
1
1
1

x
x
x
x
x
x

1
2
2
2
1
2

9.70 4.7+5.1/2
3.50
5.10
9.70
0.43
9.70
0.20
9.70
4.25
3.50
5.10

0.57
0.15
0.3
0.7
0.075
0.075

2.45
1.71
4.16
27.09
5.36
2.47
2.72
3.09
2.68
5.77

TOTAL
LENGTH

TOTAL
WT.IN
UNIT WT KGS

5.00
1.90
5.00
1.35

120.00
98.80
50.00
70.20

0.62
0.62
0.89
0.62

74.07
60.99
44.44
43.52

41
81
16
33
5
17
20

10.40
5.40
10.40
5.40
9.60
2.12
2.50

426.40
437.40
166.40
178.20
96.00
72.08
50.00

3.86
0.89
0.62
0.62
2.47
0.62
2.47

1645.06
389.29
103.17
110.48
237.04
44.69
123.50

24
34
12
10
17

5.10
3.50
2.00
9.60
2.10

489.60
476.00
48.00
192.00
71.40

0.89
0.89
0.89
0.89
0.62

435.74
423.64
42.72
170.88
44.27

2
2
2
2

x 12
x 26
x 5
x 26

1
1
1
1
2
2
1

x
x
x
x
x
x
x

4
4
2
2
2

x
x
x
x
x

3993.51
399.35
4392.86

SLBR @ KM 11.250 KM ON TUNNEL CROSSING ACRESS BHIMA CANAL


SL.NO.

DISCRIPTION OF ITEM

Levelling coarse (PCC M10)


Abutments
Returns

Foundation (PCC M10)


Abutments
Returns

Sub-Structure (PCC M15)


Abutments
Returns

Super-Structure
Bed blocks (RCC M30)

Deck slab (RCC M30)


Approach Slab (RCC M30)
Kerbs (RCC M30)
Parapet walls (RCC M30)
Wearing coat (PCC M35)

REINFORSEMENT DETAILS
BED BLOCKS
10mm dia main bar
Stirrups 10mm dia @ 200mmc/c
12mm dia main bar in Dirt wall
Dirtwall stirrups 10mm dia
DECK SLAB
Main bars 16mm dia @ 100mm c/c
Dist.bars 12mm dia @ 300mm c/c
Main bars 10mm dia @ 300mm c/c
Dist. bars 10mm dia @ 300mm c/c
Kerb main bars 20mm dia
Kerb stirrups 10mm dia @ 600mm c/c
chairs 16mm dia
APPROACH SLAB
12mm dia @ 150mm c/c both ways
Chairs 12mm dia
PARAPET main bars 12mm dia
Parapet Stirrups 10mm dia @ 600mm

NOS

QTY

1
2

x
x

2
2

5.60
3.20

2.60
1.30

0.10
0.10

2.91
1.66
4.58

1
2

x
x

2
2

5.40
3.10

2.39
1.10

0.15
0.15

3.87
2.05
5.92

1
1
2

x
x
x

2
2
2

5.10 2.09+0.8/2
5.10
0.80
3.10 0.8/0.5/2

0.86
0.15
1.39

12.68
1.22
11.20
25.10

1
1

x
x

2
2

5.10
5.10

0.80
0.40

0.30
0.42

1
1
1
1
1
1

x
x
x
x
x
x

1
2
2
2
1
2

3.48 4.7+5.1/2
3.50
5.10
3.48
0.43
3.48
0.20
3.48
4.25
3.50
5.10

0.23
0.15
0.3
0.7
0.075
0.075

2.45
1.71
4.16
3.92
5.36
0.89
0.97
1.11
2.68

TOTAL
LENGTH

TOTAL
WT.IN
UNIT WT KGS

2
2
2
2

x 12
x 26
x 5
x 26

5.00
1.90
5.00
1.35

120.00
98.80
50.00
70.20

0.62
0.62
0.89
0.62

74.07
60.99
44.44
43.52

1
1
1
1
2
2
1

x
x
x
x
x
x
x

47
12
18
12
5
12
8

3.70
4.80
3.70
4.80
3.38
1.66
2.50

173.90
57.60
66.60
33.80
39.84
20.00
20.00

1.58
0.89
0.62
0.62
2.47
0.62
1.58

274.80
51.26
41.29
35.71
83.46
24.70
31.60

4
4
2
2
2

x
x
x
x
x

24
34
12
10
12

5.10
3.50
2.00
3.38
2.10

489.60
476.00
48.00
67.60
50.40

0.89
0.89
0.89
0.89
0.62

435.74
423.64
42.72
60.16
31.25

1759.38
175.94
1935.31

Name of the project: KOILSAGAR LIFT IRRIGATION SCHEME


Name of the Structure: LRB a Km.12.900
DETAILED MEASUREMENTS
S.No.
1

DESCRIPTION

2
1 Base concrete M-10
Pier type-1
Pier type-2
Abutment

Unit

No.

3
Cum
Cum
Cum
Cum

Level
Bottom
Top
in mts
in mts
5
6

Length

Width

Depth/Height

Quantity

in mts
7

in mts
8

in mts
9

in mts
10

2
2
2

350.39
355.39
361.30

350.29
355.29
361.20

3.20
3.20
10.00

4.20
4.20
16.60

0.10
0.10
0.10

2.69
2.69
33.20
38.58

Cum
Cum
Cum
Cum

2
2
2
2
2

350.993
357.393
362.854
363.554
363.254

350.393
350.993
350.993
363.254
362.854

3.0

4.0
1.131
1.6
1.2
3.85

0.6
6.4
11.861
0.3
0.4

14.40
14.48
45.55
3.53
3.7

Cum
Cum
Cum
Cum

355.993
357.393
362.854
363.554
363.254

355.393
355.993
355.993
363.254
362.854

Cum
Cum

2
2
2
2
2
2
2

1.2
4.9
3.9
4.25
4.25

4
1.131
1.6
1.2
3.85
1
0.5

0.6
1.4
6.861
0.3
0.4
0.3
0.5

14.40
3.17
26.35
3.53
3.70
2.55
2.13
137.46

RCC M-30:
3 superstructure
Slab
Kerb
Apoproach slab

Cum
Cum
Cum

1
1
2

42.5
42.5
3.5

4.25
0.225
4.25

0.5
0.2
0.3

90.31
1.91
8.93
101.15

PCC M-15
4 substructure
Abutment footing
Abutment
return wall footing
return wall

Cum
Cum
Cum
Cum

2
2
4
4
4

5.7
5.1
3.7
3.5
3.5

4.85
1.5
1.9
0.9
0.5

0.450
1.500
0.450
2.372
1.000

24.9
23.0
12.7
29.9
7.0
97.37

Cum

42.5

4.25

0.075

13.6

Cum

3.5

4.25

0.075

2.23
15.78

RCC M-30
2 sub-structure
Pier type-1
pier footing
peir
pier cap
pier type-1
pier footing
peir
pier cap
Abutment bed block

CC M-35
5 superstructure
Waring coat
wearing coat
(approach slab)

361.754
363.254
361.754
364.126
365.129

361.304
361.754
361.304
361.754
364.129

1.2
4.9
1.2
3
-

S.No.

1
2
3
4
5
6
7
8
9
10
11
12

Description of work
Earth work excavation for foundation
in all soils
Earth work excavation for foundation
in hard rock
Laying levelling course (PCC M-10)
using 40mm metal
Filling foundation in M15 grade
Cement using 40 MSA metal
R.C.C. M-30 per peir foundation
Construction of Sub-structure walls in
M-15 grade concrete using 40 MSA
R.C.C. M-30 grade concrete for deck
slab kerb and approach slab
R.C.C. M-15 grade concrete for
wearing coat
Fabrication of steel
Exppansion joint
Weep holes
Rough tone pitching

SLRB @ Km.7.55on
Tunnel Crossing across
Bhima canal

SLRB @ Km.11.25 on
Tunnel Crossing across
Bhima canal

SLRB @ Km.11.60 on
Tunnel Crossing across
Bhima canal

SLRB @ Km.12.90
on
Tunnel Crossing
across Bhima canal

100.00

80.00

90.00

200.00

470.00

150.00

160.00

180.00

400.00

890.00

8.30

4.60

5.10

38.60

56.60

or

57.00

11.30

6.00

6.60

23.90

or

24.00

137.50

or

138.00

136.80

25.10

44.40

97.40

137.50
303.7 +
23.90
-327.600

or

328.00

41.80

15.30

17.20

101.20

175.50

or

176.00

5.80

3.80

4.00

15.80

29.40

or

30.00

4393.00
10.00
20.00
200.00

Kg
RM

1936.00
10.00 RM
20.00
200.00

2078.00
10.00 RM
20.00
200.00

51659.00 Kg = 60066.00 Kg
60.00 RM =
90.00 RM
20.00
=
80.00 Nos.
200.00
=
800.00 Sqmt

ABSTRACT
S.No.

Qty.

470

Cum EWE in all soils (IRR-CCDW-1-1)

179.6 /Cum

84412

890

Cum EWE in hard rock (IRR-CCDW-1-5)

275.6 /Cum

245284

3
4

57
328

4471.31 /Cum
4723.26 /Cum

254865
1549230

176

Cum PCC M-10 for levelling course (IRR-CCDW-2-5)


Cum VCC M-15 for foundation filling (IRR-DAW-2-5)
RCC M-30 Approach slab for kerbs & Deck slabs
Cum
(IRR-CCDW-2-24)

8116.05 /Cum

1428425

138

Cum RCC M-30 for Colums & Beams (IRR-CCDW-2-25)

7136.15 /Cum

984789

30

Cum M-25 Wearing coat (IRR-DAW-2-13)

5307.63 /Cum

159229

Reinforcement for RCC walls (IRR-CCDW-2-1)


12mm thick expansion joint (IRR-CAW-7-33)
PVC Pipes for weep holes (IRR-CAW-7-23)

60.9 /Kg
169.5 /Rmt
196.1 /No.

3658020
15255
15688

Dry rubble stone pitching (IRR-CAW-8-4)

216.3 /Sqm

173040

8
9
10
11

Description

60066 Kg
90
Rmt
80
800

Rate

Amount

8568237
Add VAT @ 5%

428411.85

Add Cess @ 1%

85682.37
9082331.22

DATA (2012-13)
1)
2)
3)
4)

5)

6)

EWE in all Soils


IRR-CCDW-1-1
=
EWE in soft rock ordinary
IRR-CCDW-1-4
=
EWEin Hard rock
IRR-CCDW-1-5
=
PCC M-10 foundation filling 40m
down size
IRR-CCDW-2-5
1 Difference of rate in cement = 220 Kg x {(now) 5000-5100(As per SSR)}/1000 =
(-)
Add contractor profit @ 14 x
=
(-)
Add 58 Km. lead for sand 0.40 x 615
=
Add 38 Km. lead for metal 0.90 x 429
=

M-15 for Sub-structure and


Super structure 40mm down size IRR-CCDW-2-5
1 Difference of rate in cement = 260 x {5000-5100)/1000 =
Add contractor profit @ 14 x
2 Add 58 Km. lead for sand 0.40 x 615
3 Add 38 Km. lead for metal 0.90 x 429
Reinforcement RCC work
IRR-CCDW-2-1
1 Difference in rateof steel = {45-48}

=
=

22.00
3.09
246
386.10
4471.31

4120.80
26.00
3.64
246
386.10
4723.26 Kg
Kg
3.00 Kg
60.90 Kg

(-)
(-)

179
108.8

(-)

7)

Expansion joint

IRR-CAW-7-33

8)

PVC pipes for weep holes

IRB-CAW-7-23

30.00 RMT
169.50
196.10 Nos.

9)

Dry rubble stone pitching

IRR-CAW-8-4

216.30 Sqm

10)

11)

12)

M-30 for kerbs and deck slabs


IRR-CCDW-2-24
1 Difference in cement Qty. = {400-330 Kg} =

7541.70

Difference in cement rate = 400 Kg x {(now) 5000-5100(As per SSR)}/1000 =


(-)
Add contractor profit @ 14 x
=
(-)
2 Add lead for sand for 58 Km.615 x 0.45
=
3 Add lead for metal for 38 429 x 0.80
=

40.00
5.60
276.75
343.20
8116.05

M-30 for colums of beams


IRR-CCDW-2.25
Differnce in cement Qty. = (400-330 Kg)
= 70 Kg.
1 Difference of rate in cement = 400 x (5000-5100)/1000
Add contract profit @ 14%
2 Add 58 Km. lead for sand - 0.45 x 615
3 Add 38 Km. lead for metal - 0.80 x 429

6561.80

M-25 wearing coat


IRR-DAW-2-3
1 Difference in cement rate = 380 x (5000-5100)/1000
Add contract profit @ 14%
2 Add 58 Km. lead for sand - 0.45 x 615
3 Add 38 Km. lead for metal - 0.80 x 429

=
='
='
=
=

='
='
=
=

(-)
(-)

(-)
(-)

40.00
5.60
276.75
343.20
7136.15
4731.00
38.00
5.32
276.75
343.20
5307.63

SLBR @ KM 11.600 KM ON TUNNEL CROSSING ACRESS BHIMA CANAL


SL.NO.

DISCRIPTION OF ITEM

Levelling coarse (PCC M10)


Abutments
Returns

foundation (PCC M10)


Abutments
Returns

NOS

QTY

1
2

x
x

2
2

5.60
3.20

2.70
1.60

0.10
0.10

3.02
2.05
5.07

1
2

x
x

2
2

5.40
3.10

2.47
1.40

0.15
0.15

3.99
2.60
6.60

Returns

1
1
2

x
x
x

2
2
2

5.10 2.165+0.8/
5.10
0.80
5.10 1.1+0.5/2

0.91
0.97
2.30

13.76
7.87
22.77
44.40

Super-Structure
Bed blocks (RCC M30)

1
1

x
x

2
2

5.10
5.10

0.80
0.40

0.30
0.42

Deck slab (RCC M30)


Approach Slab (RCC M30)
Kerbs (RCC M30)
Parapet walls (RCC M30)
Wearing coat (PCC M35)

1
1
1
1
1
1

x
x
x
x
x
x

1
2
2
2
1
2

4.13 4.7+5.1/2
3.50
5.1
4.13
0.43
4.13
0.2
4.13
4.25
3.50
5.1

0.27
0.15
0.3
0.7
0.075
0.075

2.45
1.71
4.16
5.46
5.36
1.05
1.16
1.32
2.68
3.99

Sub-Structure (PCC M15)


Abutments

REINFORSEMENT DETAILS
BED BLOCKS
10mm dia main bar
Stirrups 10mm dia @ 200mmc/c
12mm dia main bar in Dirt wall
Dirtwall stirrups 10mm dia
DECK SLAB
Main bars 16mm dia @ 100mm c/c
Dist.bars 12mm dia @ 290mm c/c
Main bars 10mm dia @ 300mm c/c
Dist. bars 10mm dia @ 300mm c/c
Kerb main bars 20mm dia
Kerb stirrups 10mm dia @ 600mm c/c
chairs 16mm dia
APPROACH SLAB
12mm dia @ 150mm c/c both ways
Chairs 12mm dia
PARAPET main bars 12mm dia
Parapet Stirrups 10mm dia @ 600mm

TOTAL
LENGTH

TOTAL
WT.IN
UNIT WT KGS

2
2
2
2

x 12
x 26
x 5
x 26

5.00
1.90
5.00
1.35

120
98.8
50
70.2

0.62
0.62
0.89
0.62

74.07
60.99
44.44
43.52

1
1
1
1
2
2
1

x
x
x
x
x
x
x

51
15
16
15
5
18
8

4.23
4.80
4.23
4.80
4.03
1.70
2.50

215.73
72
67
72
40.3
61.2
20

1.58
0.89
0.62
0.62
2.47
0.62
1.58

340.91
64.08
41.96
44.64
99.51
37.94
31.60

4
4
2
2
2

x
x
x
x
x

24
34
12
10
12

5.10
3.50
2.00
4.03
2.10

489.6
476
48
80.6
50.4

0.89
0.89
0.89
0.89
0.62

435.74
423.64
42.72
71.73
31.25
1888.75

188.88
2077.63

Name of the Structure : SLRB at Km.12.900


DETAILED MEASUREMENTS
S.No.

DESCRIPTION

Unit

No.

Level
Bottom
Top
in mts in mts
5
6

Length

Width

Depth/Height

Quantity

in mts
7

in mts
8

in mts
9

in mts
10

SLRB
Earth work
R/s Abutments
R/S return

1
2

5.7
2.7

2.6
1.9

2.93
2.93

43.35
30.31

L/S Abutments
L/S Return

1
2

5.7
2.7

2.6
1.9

2.93
2.93

43.35
30.31

L/S 1st Pier

8.83

105.96

L/S 2nd Pier

13.84

166.03

R/S 1st Pier

13.84

166.03

R/S 1st Pier

8.84

106.03
690.77

Das könnte Ihnen auch gefallen