Project
Shell Project No: HP-3000-QAT
Project Document Number: T.4.234.571
2MH127
Tag/Item Number(s):
N/A
Unit(s):
ASU
PCWBS:
LINDE ENGINEERING
Page 2 of 8
5887
11.01.09
SB
EO
AG
CCI
05.01.09
SB
EO
AG
CCI
04.01.09
SB
EO
AG
CCI
31.12.08
SB
EO
AG
ICC
18.12.08
SB
EO
AG
IFR
25.11.08
SB
EO
AG
IIR
Date
Description
GAMA
Rev.
No.
Project
Rev
No.
Status
Document Title:
LINDEGINEERING AG
Contractor
LOC470
GAM
ITP
QAC
GTL
045
Org.
Code
Doc.
Type
Disc.
Code
Geogr.
Area
Seq.
No
Rev.
No
Vendor Code
Rev No: O
X. CONTRACTOR QC
C. COMPANY
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
1.0
1.1
Activity
Test Frequency
METHOD STATEMENTS/PROCEDURES
Method Statements /
Prior to start of
Procedures
activity
Preparation
2.0
MATERIALS CERTIFICATES
2.1
Verification of
construction materials.
2.2
3.0
3.1
3.2
T.4.234.571 Rev. O
100%
100%
100%
100%
Reference Document
Acceptance Criteria
Responsible Party
Verifying Documents
Subcontractor Method
Statements / Procedure
T.4.234.088 &
Project
Requirements
QA/QC
T.4.234.088 &
T.4.132.873
R R
QC Civil
Inspector
Manufactures
Technical Data
Sheets & Certificates
R R
Site Engineer
Visual confirmation
S S
GAM-QCR-QACGTL- 168
S S
GAM-QCR-QACGTL- 160
S S
T.4.234.088 , DEP
34.17.00.32-Gen & DEP
34.17.10.30-Gen
T.4.234.088 , DEP
34.17.00.32-Gen & DEP
34.17.10.30-Gen
T.4.234.088 ,
T.4.132.873 ,
DEP 34.17.00.32-Gen &
DEP 34.17.10.30-Gen
T.4.234.088 &
T.4.132.873
Manufacturers
Technical datas
Manufacturers
recommendation.
Page 4
X. CONTRACTOR QC
C. COMPANY
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
3.3
Activity
In process Inspection
for masonry work ( for
level, staggered joints ,
reinforcement , mixing
mortar etc )
a) Up to sill level
Test Frequency
100%
Reference Document
Acceptance Criteria
Responsible Party
Verifying Documents
T.4.234.088 &
T.4.132.873 & RFC
drawings
T.4.234.555 ,
DEP 34.17.00.32Gen & DEP
34.17.10.30-Gen
GAM-QCR-QACGTL-160
T.4.234.088 &
T.4.132.873 & RFC
drawings
T.4.234.555 ,
DEP 34.17.00.32Gen & DEP
34.17.10.30-Gen
T.4.234.088 &
T.4.132.873 & RFC
drawings
T.4.234.555 ,
DEP 34.17.00.32Gen & DEP
34.17.10.30-Gen
T.4.234.088 &
T.4.132.873
T.4.234.555 ,
DEP 34.17.00.32Gen & DEP
34.17.10.30-Gen
W S
GAM-QCR-QACGTL-160
Electrical
Engineer & QC
Civil Inspector
GAM-QCR-QACGTL-160
QC Civil
Inspector
GAM-QCR-QACGTL-160
H S
b) Up to lintel level
c) Up to roof level
3.4
100%
3.5
Inspection for
embedded items
100%
3.6
T.4.234.571 Rev. O
100%
Page 5
X. CONTRACTOR QC
C. COMPANY
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
3.7
3.8
3.9
3.10
Activity
Test Frequency
In process Inspection
for plastering or
rendering work
( for level, undulations ,
etc )
100%
Final checking
inspection.
Curing period finished
& released for next
activity ( Plastering to
Painting)
Disposal of wastes
T.4.234.571 Rev. O
Acceptance Criteria
Responsible Party
T.4.234.088 &
T.4.132.873
Visual confirmation
GAM-QCR-QACGTL-160
100%
Mechanical Completion
Documentation
Visual confirmation
100%
----
Visual confirmation
-----
T.13.377.450Construction waste
Management Procedure
100%
Reference Document
Site Engineer
Verifying Documents
W S
S S
Visual
Page 6
Report No.:
Item Description:
Date:
ITP No.:
Subsystem:
GAM-ITP-QAC-GTL -
Description
QC Inspector
Initial
Date
1.
Surface chipping & Cleaning.
2.
Laying of Damp Proof Course (Exterior Wall Only)
3.
Levels, Staggered joints, reinforcement ect....
4.
Construction Stage (Sill or Lintel or Roof level).
5.
Lintels & wall openings.
6.
Installation of embedded items.
7.
Curing period finished.
8.
Released for plastering work.
Plastering Work:
1.
Marking levels (Button marks fixing)
2.
RCC faces hogging completed
3.
Plastering or rendering work (in process)
4.
Checking for finishing surface (Undulations, etc...)
5.
Repair works ( If any)
6.
Curing period finished
7.
Released for next activity ( Plastering to Painting)
REMARKS:
ORGANIZATIONS
Accepted By
GAMA REP.
LINDE REP.
QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-160
NAME
SIGNATURE
DATE
Date :
GAM-ITP-QAC-GTL-
Location Bldg/Area:
Drawing No:
Tag No and Tag description :
Item
Details of Activity
Remarks
Signature
Date
GAM-QCR-QAC-GTL- 166
LINDE