WORK SCHEDULE

PRELIMINARIES

Order Bahan Binaan

Susun Atur Tapak

Mohon Bekalan Air & Letrik Sementra

Setting Out & Side Rail

FABRICATING WORKS

Formwork

Re Bar

SUB STRUCTURE
1. 1. EXCAVATION/INSTALLATION/CONCRETING

Menggali Tapak Asas

Grid Line allignment

Memasang Formwork

Lean Concrete 2

Memasang besi / re-bar

Kerja-kerja konkrit tapak asas

1. 2. DISMENTLING WORKS/RE-FILL EARTH

Membuka papan formwork

Kerja menimbus kembali tanah

1. 3. MEMBINA GROUND BEAM

Grid Line allignment/levelling

Pasang forwork

Pasang besi / re-bar

Tie up / support formwork

Kerja-kerja Concreting to Grd Beam

1. 4. GRD FLOOR SLAB

Mengisi tanah/pasir/hardcore

Menghampar Plastic sheet

Menghampar BRC

Concrete Pouring to Slab

SUPER STRUCTURE
1. 1. MEMBINA TIANG

Grid Line allignment/levelling

Pasang besi / re-bar

Pasang formwork

Checking verticallity and tie-up formwork

Concrete Pouring to column

1. 2. MEMBINA ROOF BEAM

Menyedia/menaikkan T-support/staging

Pasang roof beam bottom formwork

Pasang roof beam side formwork

Masukkan tetulang besi/re-bar

Tie-up roof beam formwork

Concrete Pouring to roof beam

1. 3. KERJA-KERJA BUMBUNG

Pasang wall plate dan kekuda

Laying aluminium foil/timber battern

Pasang atap genting

1. 4. KERJA BATA, PLASTER, FRAME PINTU/TINGKAP DAN SILING

Pasang Frame Pintu

Kerja Mengikat Dinding bata

Pasang frame tingkap

Kerja-kerja plaster

Kerja-Kerja Siling

COLD WATER PLUMBING/SANITARY/SEWERAGE

Under ground paip

Piping and Sanitary fitting

Sewer pipe and septic tank

KERJA-KERJA LETRIK

Cable laying

Electrical appliance

FINISHING WORKS

Floor and Wall tiles

Painting

Fixing Door/Window leaf

EXTERNAL WORKS

Perimeter drain and Turfing