Beruflich Dokumente
Kultur Dokumente
Work / Activity 1
Structural reinforcement /
Additional prestressing
Poland
Owner :
ZPT
Engineer :
Subsidiary(ies) :
End of works :
12/1999
Freyssinet mission :
Freyssinet installed 55 loops on each cell, as its participation in the reinforcement of these silos by external prestressing. Each
tendon is a greased, sheathed, strand threaded in a HDPE duct ciment grouted, anchored with a Freyssinet 1X15 anchorage.