Work / Activity 1
Structural reinforcement /
Additional prestressing
Owner :
ONICL
Engineer :
SOSIPO
Subsidiary(ies) :
Freyssinet
Beginning of works :
08/1987
End of works :
09/1987
Freyssinet mission :
There were 3 separate cells, each requiring 101 horizontal loops.
The work of Freyssinet consisted of cutting greased and
sheathed strand, threading the strand into the polyethylene tube,
installing the tendon assembly on the cell wall, and the X
anchorage, to the nominal force, grouting operations, tensionning
operations and a further lift-off check. The anchor assembly was
then protected by a concrete block secured by wire mesh to the
wall. Actual site work started on august 10, 1987 and lasted 6
weeks.