CAP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
MAVALLE 2014
DESCRIPCION
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
CASINO
PORTERIA #1
LAGUNA
TANQUE PRODUCCION #1
TANQUE PRODUCCION #2
BASCULAS
CARCAMO
DIQUE ACPM
POZO
TANQUE
RED AGUAS LLUVIAS PLUVIAL
VALOR CAPITULO
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2,458,099,920
676,624,485
450,979,063
233,095,816
88,973,097
62,923,934
25,556,617
347,385,555
53,143,394
247,549,848
131,827,980
33,717,105
44,970,781
118,323,630
105,453,358
118,163,419
DURACION/MES
7.00
5.00
7.00
1.00
4.00
4.00
3.00
2.00
2.00
3.00
3.00
4.00
4.00
1.00
3.00
2.00
MAYO
MES 1
58,099,920
JUNIO
MES 2
400,000,000
64,425,580
277,908,444
$
$
65,733,844
179,826,147
685,875,814
AGOSTO
MES 4
400,000,000
135,324,897
64,425,580
SEPTIEMBRE
MES 5
400,000,000
135,324,897
64,425,580
OCTUBRE
MES 6
400,000,000
135,324,897
64,425,580
22,243,274
15,730,983
8,518,872
22,243,274
15,730,983
8,518,872
26,571,697
22,243,274
15,730,983
8,518,872
32,956,995
32,956,995
32,956,995
69,477,111
35,151,119
59,081,710
MES 3
400,000,000
135,324,897
64,425,580
26,571,697
82,516,616
32,956,995
NOVIEMBRE
MES 7
400,000,000
135,324,897
64,425,580
233,095,816
22,243,274
15,730,983
DICIEMBRE
MES 8
ENERO
MES 9
FEBRERO
MES 10
64,425,580
82,516,616
82,516,616
8,429,276
11,242,695
8,429,276
11,242,695
8,429,276
11,242,695
8,429,276
11,242,695
118,323,630
16
RED SANITARIA ALCANTARILLADO
17
19 RED HIDRAULICA
20 RED ELECTRICA
JULIO
35,151,119
35,151,119
32,866,922
32,866,922
89,913,073
137,175,163
89,913,073
137,175,163
137,175,163
1,000,878,577
###
1,006,858,279
###
1,110,184,302
###
59,081,710
TOTAL
2,458,099,920
676,624,485
450,979,063
233,095,816
88,973,097
62,923,934
25,556,617
347,385,555
53,143,394
247,549,848
131,827,980
33,717,105
44,970,781
118,323,630
105,453,358
118,163,419
65,733,844
179,826,147
685,875,814
2.00
2.00
5.00
ACUMULADO
454,331,994
###
592,984,401
###
137,175,163
137,175,163
872,634,337
###
884,393,807
###
*Nota : El presente cuadro hace referencia a la programacion general de inversion, simplificada a los capitulos de obra y al periodo de tiempo mensual.
166,614,168
###
19,671,972
###
19,671,972
###
6,128,223,808
PROGRAMA DE TRABAJO
MAVALLE 2014
MAYO
CAP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
DESCRIPCION
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
CASINO
PORTERIA #1
LAGUNA
TANQUE PRODUCCION #1
TANQUE PRODUCCION #2
BASCULAS
CARCAMO
DIQUE ACPM
POZO
TANQUE
RED AGUAS LLUVIAS PLUVIAL
RED SANITARIA ALCANTARILLADO
17
19 RED HIDRAULICA
20 RED ELECTRICA
VALOR CAPITULO
DURACION/MES
40.11%
11.04%
7.36%
3.80%
1.45%
1.03%
0.42%
5.67%
0.87%
4.04%
2.15%
0.55%
0.73%
1.93%
1.72%
1.93%
1.07%
7.00
5.00
7.00
1.00
4.00
4.00
3.00
2.00
2.00
3.00
3.00
4.00
4.00
1.00
3.00
2.00
2.00
2.93%
11.19%
2.00
5.00
ACUMULADO
MES 1
0.95%
JUNIO
MES 2
6.53%
1.05%
4.53%
JULIO
AGOSTO
SEPTIEMBRE
MES 3
6.53%
2.21%
1.05%
MES 4
6.53%
2.21%
1.05%
MES 5
6.53%
2.21%
1.05%
0.14%
0.36%
0.26%
0.14%
0.36%
0.26%
0.14%
0.43%
0.54%
0.54%
0.54%
0.57%
0.96%
0.57%
0.57%
0.54%
1.13%
1.93%
0.96%
7.41%
7.41%
9.68%
17.09%
2.24%
2.24%
0.54%
1.47%
2.24%
14.24%
31.33%
14.43%
45.76%
16.33%
62.09%
OCTUBRE
MES 6
6.53%
2.21%
1.05%
0.36%
0.26%
0.43%
1.35%
0.54%
NOVIEMBRE
MES 7
6.53%
2.21%
1.05%
3.80%
0.36%
0.26%
DICIEMBRE
ENERO
FEBRERO
MES 8
MES 9
MES 10
1.05%
1.35%
1.35%
0.14%
0.18%
0.14%
0.18%
0.14%
0.18%
-
1.47%
2.24%
2.24%
16.43%
78.52%
18.12%
96.64%
2.72%
99.36%
0.32%
99.68%
TOTAL
40.11%
11.04%
7.36%
3.80%
1.45%
1.03%
0.42%
5.67%
0.87%
4.04%
2.15%
0.14% 0.55%
0.18% 0.73%
1.93%
1.72%
1.93%
1.07%
2.93%
11.19%
0.32%
100%
100%
PROGRAMA DE TRABAJO
MAVALLE 2014
MAYO
CAP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
DESCRIPCION
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
CASINO
PORTERIA #1
LAGUNA
TANQUE PRODUCCION #1
TANQUE PRODUCCION #2
BASCULAS
CARCAMO
DIQUE ACPM
POZO
TANQUE
RED AGUAS LLUVIAS PLUVIAL
RED SANITARIA ALCANTARILLADO
17
19 RED HIDRAULICA
20 RED ELECTRICA
VALOR CAPITULO
DURACION/MES
40.11%
11.04%
7.36%
3.80%
1.45%
1.03%
0.42%
5.67%
0.87%
4.04%
2.15%
0.55%
0.73%
1.93%
1.72%
1.93%
1.07%
7.00
5.00
7.00
1.00
4.00
4.00
3.00
2.00
2.00
3.00
3.00
4.00
4.00
1.00
3.00
2.00
2.00
2.93%
11.19%
2.00
5.00
ACUMULADO
MES 1
0.95%
JUNIO
MES 2
6.53%
1.05%
4.53%
JULIO
AGOSTO
SEPTIEMBRE
MES 3
6.53%
2.21%
1.05%
MES 4
6.53%
2.21%
1.05%
MES 5
6.53%
2.21%
1.05%
0.14%
0.36%
0.26%
0.14%
0.36%
0.26%
0.14%
0.43%
0.54%
0.54%
0.54%
0.57%
0.96%
0.57%
0.57%
0.54%
1.13%
1.93%
0.96%
7.41%
7.41%
9.68%
17.09%
2.24%
2.24%
0.54%
1.47%
2.24%
14.24%
31.33%
14.43%
45.76%
16.33%
62.09%
OCTUBRE
MES 6
6.53%
2.21%
1.05%
0.36%
0.26%
0.43%
1.35%
0.54%
NOVIEMBRE
MES 7
6.53%
2.21%
1.05%
3.80%
0.36%
0.26%
DICIEMBRE
ENERO
FEBRERO
MES 8
MES 9
MES 10
1.05%
1.35%
1.35%
0.14%
0.18%
0.14%
0.18%
0.14%
0.18%
-
1.47%
2.24%
2.24%
16.43%
78.52%
18.12%
96.64%
2.72%
99.36%
0.32%
99.68%
TOTAL
40.11%
11.04%
7.36%
3.80%
1.45%
1.03%
0.42%
5.67%
0.87%
4.04%
2.15%
0.14% 0.55%
0.18% 0.73%
1.93%
1.72%
1.93%
1.07%
2.93%
11.19%
0.32%
100%
100%
ACTIVIDAD
UNIDAD CANTIDAD
RENDIMIENTO
VALOR
DIA
TOTAL CON AIU
AREA DE PRODUCCION
$ 400,000,000
M2
114.00
14
21,407,545
ML
770.00
250
4,160,606
M3
232.00
140
4,462,265
ML
347.91
40
2,694,896
M3
1330.00
104
14,388,299
M3
66.00
10
2,567,469
M3
1.00
10
59,764
M2
116.00
60
3,976,753
ML
347.91
200
3,577,929
M2
3420.00
500
11,901,579
M3
28.19
2.2
22,678,919
ML
39.15
22,921,138
ML
347.91
KG
53806.99
23
30,014,679
3400
255,188,157
69,477,111
69,477,111
AREA LAGUNA
Excavacion mecanica segun detalle estructural
M3
3612.22
120
EDIFICIO DE ADMINISTRACION
64,425,580
Preliminares
GL
1.00
1.00
1,337,266
Excavaciones
GL
1.00
0.17
10,821,922
GL
1.00
0.09
23,370,862
GL
0.64
0.05
28,895,530
59,081,710
GL
1.00
0.33
4,903,642
Excavaciones
GL
1.00
0.13
15,098,472
Acero de Refuerzo
GL
1.00
0.17
9,999,428
Estructuras en Concreto
GL
0.75
0.05
29,080,168
FECHA
454,33
6 de junio de 2014
10,457,322
464,78
7 de junio de 2014
10,923,709
475,71
8 de junio de 2014
10,923,709
486,63
9 de junio de 2014
9,789,602
496,42
10 de junio de 2014
9,789,602
506,21
11 de junio de 2014
10,089,035
516,30
12 de junio de 2014
10,455,816
526,76
13 de junio de 2014
10,776,786
537,53
14 de junio de 2014
9,801,069
547,33
15 de junio de 2014
9,801,069
557,13
16 de junio de 2014
9,801,069
566,94
17 de junio de 2014
9,580,331
576,52
18 de junio de 2014
11,871,228
588,39
19 de junio de 2014
14,115,231
602,50
20 de junio de 2014
27,533,925
630,04
21 de junio de 2014
29,503,712
659,54
22 de junio de 2014
31,567,678
691,11
23 de junio de 2014
29,901,107
721,01
24 de junio de 2014
27,776,483
748,79
25 de junio de 2014
27,776,483
776,56
26 de junio de 2014
27,776,483
804,34
27 de junio de 2014
27,776,483
832,11
28 de junio de 2014
27,776,483
859,89
29 de junio de 2014
27,776,483
887,67
30 de junio de 2014
27,776,483
915,44
1 de julio de 2014
27,776,483
943,22
2 de julio de 2014
27,776,483
971,00
3 de julio de 2014
27,776,483
998,77
4 de julio de 2014
24,268,786
1,023,04
5 de julio de 2014
24,268,786
1,047,31
592,984,400
TOTAL PROGRAMADO
13
29-Jun
28-Jun
27-Jun
26-Jun
25-Jun
15-Jun
24-Jun
14-Jun
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0.5 0.5
23-Jun
13-Jun
22-Jun
12-Jun
21-Jun
11-Jun
20-Jun
10-Jun
19-Jun
9-Jun
18-Jun
8-Jun
17-Jun
7-Jun
16-Jun
6-Jun
DIAS
CALCULADOS
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.5 0.5
0.5 0.5
13
13
15
16
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
30
11
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
14
15
454,331,994
464,789,316
7.58%
475,713,024
7.76%
486,636,733
7.94%
496,426,335
8.10%
506,215,936
8.26%
516,304,971
8.43%
526,760,787
8.60%
537,537,573
8.77%
547,338,642
8.93%
557,139,710
9.09%
566,940,779
9.25%
576,521,109
9.41%
588,392,337
9.60%
602,507,568
9.83%
630,041,493
10.28%
659,545,205
10.76%
691,112,883
11.28%
721,013,990
11.77%
748,790,473
12.22%
776,566,956
12.67%
804,343,439
13.13%
832,119,923
13.58%
859,896,406
14.03%
887,672,889
14.48%
915,449,372
14.94%
943,225,855
15.39%
971,002,338
15.84%
998,778,821
16.30%
1,023,047,608
16.69%
1,047,316,394
17.09%
5-Jul
4-Jul
3-Jul
2-Jul
1-Jul
30-Jun
25 26 27 28 29 30
ACTIVIDAD
UNIDAD CANTIDAD
AREA DE PRODUCCION
Excavacin para zapatas
Campamento (Medida en Planta)
Solados para zapatas y vigas
Relleno con material de arrecife
Concreto para zapatas
Acero para zapatas y columnas
AREA LAGUNA
Excavacion mecanica segun detalle estructural
RENDIMIENTO
VALOR
DIA
TOTAL CON AIU
ML
M2
M2
M3
M3
KG
2101.00
38.00
45.36
993.00
13.61
19470.00
87.54
4.75
2.39
33.10
0.80
1145.29
M3
1433
47.77
$ 166,882,716
$
16,274,258
$
7,135,848
$
1,555,047
$
38,628,735
$
10,949,276
$
92,339,551
$ 27,562,179
$
27,562,179
$
POZO PROFUNDO
Construccin Pozo
Instalacin Equipo Bombeo Electro Sumergible
Global
Global
1
0
0.08
ML
KG
M2
M3
914.00
6995.00
59.18
12.68
48.11
1165.83
3.48
0.75
FECHA
Viene del mes 1
6 de junio de 2014
7 de junio de 2014
8 de junio de 2014
9 de junio de 2014
10 de junio de 2014
11 de junio de 2014
12 de junio de 2014
13 de junio de 2014
14 de junio de 2014
15 de junio de 2014
16 de junio de 2014
17 de junio de 2014
18 de junio de 2014
19 de junio de 2014
20 de junio de 2014
21 de junio de 2014
22 de junio de 2014
23 de junio de 2014
24 de junio de 2014
25 de junio de 2014
26 de junio de 2014
27 de junio de 2014
28 de junio de 2014
29 de junio de 2014
30 de junio de 2014
1 de julio de 2014
2 de julio de 2014
3 de julio de 2014
$
$
$
22,111,812
22,111,812
-
$
$
$
$
$
49,121,680
3,716,869
33,174,893
2,028,829
10,201,089
4,799,253
4,799,253
4,799,253
4,799,253
4,799,253
4,799,253
5,477,348
11,006,496
10,114,515
10,114,515
10,114,515
10,391,985
10,391,985
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
4 de julio de 2014
5 de julio de 2014
TOTAL EJECUTADO
$
$
$
9,957,147
9,957,147
265,678,386
$
$
700,760
710,717
24
8
19
30
17
17
30
13
29-Jun
28-Jun
27-Jun
26-Jun
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0
25-Jun
15-Jun
24-Jun
14-Jun
23-Jun
13-Jun
22-Jun
12-Jun
21-Jun
11-Jun
20-Jun
10-Jun
19-Jun
9-Jun
18-Jun
8-Jun
17-Jun
7-Jun
0
0
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
16-Jun
6-Jun
DIAS
EJECUTADOS
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0
0
0
0
0
0
0
0
0
0
0
0
0
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
19
6
17
17
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.2 0.2 0.2 0.2 0.2 0.2
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
% Ejecutado Acumulado
7.34%
7.42%
7.50%
7.58%
7.65%
7.73%
7.82%
8.00%
8.17%
8.33%
8.50%
8.67%
8.84%
9.00%
9.16%
9.32%
9.49%
9.65%
9.81%
9.97%
10.14%
10.30%
10.46%
10.62%
10.79%
10.95%
11.11%
11.27%
700,760,698
710,717,846
11.43%
11.60%
5-Jul
4-Jul
3-Jul
2-Jul
1-Jul
30-Jun
25 26 27 28 29 30
0
FECHA
6-Jun-14
7-Jun-14
8-Jun-14
9-Jun-14
10-Jun-14
11-Jun-14
12-Jun-14
13-Jun-14
14-Jun-14
15-Jun-14
16-Jun-14
17-Jun-14
18-Jun-14
19-Jun-14
20-Jun-14
21-Jun-14
22-Jun-14
23-Jun-14
24-Jun-14
25-Jun-14
26-Jun-14
27-Jun-14
28-Jun-14
29-Jun-14
30-Jun-14
1-Jul-14
2-Jul-14
3-Jul-14
4-Jul-14
5-Jul-14
% Programado Acumulado
7.58%
7.76%
7.94%
8.10%
8.26%
8.43%
8.60%
8.77%
8.93%
9.09%
9.25%
9.41%
9.60%
9.83%
10.28%
10.76%
11.28%
11.77%
12.22%
12.67%
13.13%
13.58%
14.03%
14.48%
14.94%
15.39%
15.84%
16.30%
16.69%
17.09%
CURVA
17.00%
15.00%
13.00%
15.00%
13.00%
11.00%
9.00%
7.00%
1
10.28%
9.09%
8.77% 8.93%
9.25% 9.41%
8.60%
8.33% 8.50%
8.26% 8.43%
8.10%
8.00% 8.17%
7.94%
7.82%
7.76%
7.58% 7.42% 7.50% 7.58% 7.65% 7.73%
7.34%
9.60%
9.83%
9.00%
8.67% 8.84%
9.16% 9
% Programad
7-Jun-14
9-Jun-14
11-Jun-14
13-Jun-14
15-Jun-14
17-Jun-14
19-Jun-14
21-Jun6-Jun-14
8-Jun-14
10-Jun-14
12-Jun-14
14-Jun-14
16-Jun-14
18-Jun-14
20-Jun-14
% Ejecutado Acumulado
7.34%
7.42%
7.50%
7.58%
7.65%
7.73%
7.82%
8.00%
8.17%
8.33%
8.50%
8.67%
8.84%
9.00%
9.16%
9.32%
9.49%
9.65%
9.81%
9.97%
10.14%
10.30%
10.46%
10.62%
10.79%
10.95%
11.11%
11.27%
11.43%
11.60%
CURVAS DE AVANCE
17.0
16.69%
16.30%
15.84%
15.39%
14.94%
14.48%
14.03%
13.58%
13.13%
12.67%
12.22%
11.77%
11.6
11.43%
11.28%
11.27%
11.11%
15.39%
14.94%
14.48%
14.03%
13.58%
13.13%
12.67%
12.22%
11.77%
11.6
11.43%
11.28%
11.27%
11.11%
10.95%
10.79%
10.76%
10.62%
10.46%
10.30%
10.28%
10.14%
9.97%
9.83%
9.81%
9.60%
9.49% 9.65%
9.41%
9.32%
9% 9.25%
9.00% 9.16%
8.84%
8.67%
3% 8.50%
% Programado
4
17-Jun-14
19-Jun-14
21-Jun-14Acumulado
23-Jun-14
25-Jun-14
27-Jun-14
29-Jun-14
1-Jul-14
3-Jul-14
5-Jul-14
-Jun-14
18-Jun-14
20-Jun-14
22-Jun-14
24-Jun-14
26-Jun-14
28-Jun-14
30-Jun-14
2-Jul-14
4-Jul-14
17.09%
16.69%
16.30%
5.84%
11.60%
11.43%
11.27%
1.11%
11.60%
11.43%
11.27%
1.11%
3-Jul-14
5-Jul-14
4
4-Jul-14
PROGRAMA DE TRABAJO
VERSION Julio 16/14
MAVALLE 2014
4,958,513
8.00
MAYO
CAP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
DESCRIPCION
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
CASINO
PORTERIA #1
LAGUNA
TANQUE PRODUCCION #1
TANQUE PRODUCCION #2
BASCULAS
CARCAMO
DIQUE ACPM
POZO
TANQUE
RED AGUAS LLUVIAS PLUVIAL
RED SANITARIA ALCANTARILLADO
17
19 RED HIDRAULICA
20 RED ELECTRICA
VALOR CAPITULO
DURACION
MES
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2,458,099,920
676,624,485
450,979,063
233,095,816
88,973,097
62,923,934
25,556,617
347,385,555
53,143,394
247,549,848
131,827,980
33,717,105
44,970,781
118,323,630
105,453,358
118,163,419
65,733,844
9.00
8.00
9.00
2.00
6.00
5.00
4.00
4.00
3.00
4.00
4.00
4.00
4.00
3.00
4.00
2.00
2.00
$
$
179,826,147
685,875,814
2.00
4.00
TOTAL
$
6,128,223,807 ACUMULADO
MES 1
14,575,406
4,958,513
17,228,309
5,409,770
6,121,295
929,606
76,182,169
45,450,000
170,855,068
170,855,068
*Nota : El presente cuadro hace referencia a la programacin general de inversin actualizada con respecto a la ejecucin fsica y fi
para recuperar el % de retraso presentado, aqu se muestra la progresin simplifi
17,459,806
JUNIO
17,000,000
JULIO
MES 2
65,312,290
17,459,806
1,615,222
20,553,909
802,880
19,905,263
95,906,578
AGOSTO
MES 3
178,212,224
17,000,000
64,425,580
51,702,140
829,995
1,530,960
135,324,897
SEPTIEMBRE
MES 4
300,000,000
95,906,578
64,425,580
MES 5
300,000,000
135,324,897
64,425,580
22,243,274
15,730,983
22,243,274
15,730,983
8,518,872
100,000,000
119,501,246
32,956,995
29,760,000
1,153,905
43,113,630
59,081,710
32,866,922
210,626,370
381,481,438
302,751,434
684,232,872
35,151,119
59,081,710
32,866,922
89,913,073
-
709,756,294
1,393,989,166
896,213,427
2,290,202,593
n respecto a la ejecucin fsica y financiera realizada con corte a Agosto 20, as mismo se ajusta la programacin de obra optimizando la ejecucin
u se muestra la progresin simplificada a los captulos de obra y al periodo de tiempo mensual.
135,324,897
OCTUBRE
135,324,897
NOVIEMBRE
MES 6
300,000,000
135,324,897
64,425,580
22,243,274
5,435,408
8,518,872
26,156,699
82,516,616
32,956,995
35,151,119
135,324,897
DICIEMBRE
MES 7
400,000,000
135,324,897
64,425,580
212,541,907.22
16,030,624
ENERO
MES 8
500,000,000
135,324,897
64,425,580
MES 9
400,000,000
45,582,050
7,589,266
26,156,700
82,516,616
32,956,995
8,429,276
11,242,695
80,985,656
32,956,995
8,429,276
11,242,695
33,997,214
8,429,276
11,242,695
-
89,913,073
802,642,535
3,092,845,127
171,468,954
171,468,954
171,468,954
1,202,680,725
4,295,525,852
1,004,834,054
5,300,359,906
636,722,975
5,937,082,881
FEBRERO
MES 10
8,429,276
11,242,695
171,468,954
191,140,925
6,128,223,806
TOTAL
2,458,099,920
676,624,485
450,979,063
233,095,816
88,973,097
62,923,933
25,556,616
347,385,555
53,143,394
247,549,848
131,827,980
33,717,105
44,970,781
118,323,630
105,453,358
118,163,419
65,733,844
179,826,147
685,875,814
6,128,223,806
PROGRAMA DE TRABAJO
VERSION Julio 16/14
MAVALLE 2014
MAYO
CAP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
DESCRIPCION
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
CASINO
PORTERIA #1
LAGUNA
TANQUE PRODUCCION #1
TANQUE PRODUCCION #2
BASCULAS
CARCAMO
DIQUE ACPM
POZO
TANQUE
RED AGUAS LLUVIAS PLUVIAL
RED SANITARIA ALCANTARILLADO
17
19 RED HIDRAULICA
20 RED ELECTRICA
VALOR CAPITULO
DURACION
MES
40.11%
11.04%
7.36%
3.80%
1.45%
1.03%
0.42%
5.67%
0.87%
4.04%
2.15%
0.55%
0.73%
1.93%
1.72%
1.93%
1.07%
9.00
8.00
9.00
2.00
6.00
5.00
4.00
4.00
3.00
4.00
4.00
4.00
4.00
3.00
4.00
2.00
2.00
2.93%
11.19%
2.00
4.00
TOTAL
100% ACUMULADO
MES 1
0.24%
0.08%
0.28%
0.09%
0.10%
0.02%
1.24%
JUNIO
MES 2
1.07%
0.28%
0.03%
0.34%
0.01%
0.32%
JULIO
MES 3
2.91%
0.28%
1.05%
0.84%
0.01%
0.02%
0.74%
0.49%
0.02%
0.70%
2.79%
2.79%
3.44%
6.22%
4.94%
11.17%
AGOSTO
MES 4
4.90%
1.56%
1.05%
0.36%
0.26%
1.95%
SEPTIEMBRE
OCTUBRE
MES 5
4.90%
2.21%
1.05%
0.36%
0.26%
0.14%
1.63%
0.54%
0.96%
0.54%
11.58%
22.75%
0.57%
0.96%
0.54%
1.47%
14.62%
37.37%
MES 6
4.90%
2.21%
1.05%
0.36%
0.09%
0.14%
0.43%
1.35%
0.54%
0.57%
NOVIEMBRE
DICIEMBRE
MES 7
6.53%
2.21%
1.05%
3.47%
0.26%
MES 8
8.16%
2.21%
1.05%
ENERO
MES 9
6.53%
FEBRERO
MES 10
0.74%
0.12%
0.43%
1.35%
0.54%
0.14%
0.18%
1.32%
0.54%
0.14%
0.18%
0.14%
0.18%
0.14%
0.18%
0.55%
1.47%
13.10%
50.47%
2.80%
2.80%
2.80%
2.80%
19.63%
70.09%
16.40%
86.49%
10.39%
96.88%
3.12%
100.00%
TOTAL
40.11%
11.04%
7.36%
3.80%
1.45%
1.03%
0.42%
5.67%
0.87%
4.04%
2.15%
0.55%
0.73%
1.93%
1.72%
1.93%
1.07%
2.93%
11.19%
100%
PROGRAMA DE TRABAJO
VERSION Julio 16/14
MAVALLE 2014
MAYO
CAP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
DESCRIPCION
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
CASINO
PORTERIA #1
LAGUNA
TANQUE PRODUCCION #1
TANQUE PRODUCCION #2
BASCULAS
CARCAMO
DIQUE ACPM
POZO
TANQUE
RED AGUAS LLUVIAS PLUVIAL
RED SANITARIA ALCANTARILLADO
17
19 RED HIDRAULICA
20 RED ELECTRICA
VALOR CAPITULO
DURACION
MES
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2,458,099,920
676,624,485
450,979,063
233,095,816
88,973,097
62,923,934
25,556,617
347,385,555
53,143,394
247,549,848
131,827,980
33,717,105
44,970,781
118,323,630
105,453,358
118,163,419
65,733,844
9.00
8.00
9.00
2.00
6.00
5.00
4.00
4.00
3.00
4.00
4.00
4.00
4.00
3.00
4.00
2.00
2.00
$
$
179,826,147
685,875,814
2.00
4.00
TOTAL
$
6,128,223,807 ACUMULADO
JUNIO
MES 1
14,575,406
4,958,513
17,228,309
5,409,770
6,121,295
929,606
76,182,169
MES 2
65,312,290
17,459,806
1,615,222
20,553,909
802,880
19,905,263
51,702,140
829,995
1,530,960
45,450,000
29,760,000
1,153,905
170,855,068
170,855,068
210,626,370
381,481,438
JULIO
AGOSTO
MES 3
178,212,224
17,000,000
64,425,580
SEPTIEMBRE
OCTUBRE
MES 4
300,000,000
95,906,578
64,425,580
MES 5
300,000,000
135,324,897
64,425,580
MES 6
300,000,000
135,324,897
64,425,580
22,243,274
15,730,983
22,243,274
15,730,983
8,518,872
100,000,000
22,243,274
5,435,408
8,518,872
119,501,246
32,956,995
NOVIEMBRE
MES 7
400,000,000
135,324,897
64,425,580
212,541,907.22
16,030,624
DICIEMBRE
MES 8
500,000,000
135,324,897
64,425,580
7,589,266
26,156,699
82,516,616
32,956,995
26,156,700
82,516,616
32,956,995
8,429,276
11,242,695
35,151,119
33,997,214
80,985,656
32,956,995
8,429,276
11,242,695
43,113,630
59,081,710
32,866,922
302,751,434
684,232,872
35,151,119
59,081,710
89,913,073
32,866,922
89,913,073
-
709,756,294
1,393,989,166
896,213,427
2,290,202,593
802,642,535
3,092,845,127
171,468,954
171,468,954
1,202,680,725
4,295,525,852
1,004,834,054
5,300,359,906
ENERO
FEBRERO
MES 9
400,000,000
MES 10
45,582,050
8,429,276
11,242,695
8,429,276
11,242,695
171,468,954
171,468,954
636,722,975
5,937,082,881
191,140,925
6,128,223,806
TOTAL
2,458,099,920
676,624,485
450,979,063
233,095,816
88,973,097
62,923,933
25,556,616
347,385,555
53,143,394
247,549,848
131,827,980
33,717,105
44,970,781
118,323,630
105,453,358
118,163,419
65,733,844
179,826,147
685,875,814
6,128,223,806
ACTIVIDAD
UNIDAD CANTIDAD
RENDIMIENTO
DIA
AREA DE PRODUCCION
Acero de refuerzo para placa de contrapiso
GL
1.00
0.10
GL
1.00
0.05
GL
1.00
1.11
GL
1.00
0.03
Red de acueducto
GL
1.00
0.23
GL
1.00
0.04
GL
1.00
0.37
GL
1.00
0.04
Mampostera
GL
1.00
0.07
Paete
GL
1.00
0.06
GL
1.00
0.67
Instalacin de geomembrana
GL
1.00
0.04
GL
1.00
0.06
GL
1.00
0.08
GL
1.00
0.07
GL
1.00
0.07
BOXES
EDIFICIO DE ADMINISTRACION
TALLERES
CASINO
LAGUNAS
RED SANITARIA
FECHA
6 de mayo de 2014
1,516,555
7 de mayo de 2014
1,516,555
8 de mayo de 2014
1,516,555
9 de mayo de 2014
1,516,555
10 de mayo de 2014
5,634,782
11 de mayo de 2014
6,249,500
12 de mayo de 2014
6,985,124
13 de mayo de 2014
8,272,825
14 de mayo de 2014
9,679,330
15 de mayo de 2014
18,970,219
16 de mayo de 2014
18,970,219
17 de mayo de 2014
18,970,219
18 de mayo de 2014
18,970,219
19 de mayo de 2014
18,970,219
20 de mayo de 2014
20,840,120
21 de mayo de 2014
20,840,120
22 de mayo de 2014
20,840,120
23 de mayo de 2014
20,840,120
24 de mayo de 2014
20,840,120
25 de mayo de 2014
20,840,120
26 de mayo de 2014
20,840,120
27 de mayo de 2014
20,840,120
28 de mayo de 2014
20,840,120
29 de mayo de 2014
20,840,120
30 de mayo de 2014
20,840,120
31 de mayo de 2014
20,840,120
1 de junio de 2014
18,035,863
2 de junio de 2014
18,035,863
3 de junio de 2014
18,035,863
4 de junio de 2014
12,511,131
5 de junio de 2014
6 de junio de 2014
10,457,322
7 de junio de 2014
10,923,709
8 de junio de 2014
10,923,709
9 de junio de 2014
9,789,602
10 de junio de 2014
9,789,602
11 de junio de 2014
10,089,035
12 de junio de 2014
10,455,816
13 de junio de 2014
10,776,786
14 de junio de 2014
9,801,069
15 de junio de 2014
9,801,069
16 de junio de 2014
9,801,069
17 de junio de 2014
9,580,331
18 de junio de 2014
11,871,228
19 de junio de 2014
14,115,231
20 de junio de 2014
27,533,925
21 de junio de 2014
29,503,712
22 de junio de 2014
31,567,678
23 de junio de 2014
29,901,107
24 de junio de 2014
27,776,483
25 de junio de 2014
27,776,483
26 de junio de 2014
27,776,483
27 de junio de 2014
27,776,483
28 de junio de 2014
27,776,483
29 de junio de 2014
27,776,483
30 de junio de 2014
27,776,483
1 de julio de 2014
27,776,483
2 de julio de 2014
27,776,483
3 de julio de 2014
27,776,483
4 de julio de 2014
24,268,786
5 de julio de 2014
24,268,786
6 de julio de 2014
5,591,496
7 de julio de 2014
5,591,496
8 de julio de 2014
5,591,496
9 de julio de 2014
5,591,496
10 de julio de 2014
5,591,496
11 de julio de 2014
5,591,496
12 de julio de 2014
5,591,496
13 de julio de 2014
5,591,496
14 de julio de 2014
5,591,496
15 de julio de 2014
5,591,496
16 de julio de 2014
5,591,496
17 de julio de 2014
5,591,496
18 de julio de 2014
5,591,496
19 de julio de 2014
5,591,496
20 de julio de 2014
5,591,496
21 de julio de 2014
5,591,496
22 de julio de 2014
5,591,496
23 de julio de 2014
5,591,496
24 de julio de 2014
5,591,496
25 de julio de 2014
5,591,496
26 de julio de 2014
5,591,496
27 de julio de 2014
5,591,496
28 de julio de 2014
5,591,496
29 de julio de 2014
5,591,496
30 de julio de 2014
5,591,496
31 de julio de 2014
5,591,496
1 de agosto de 2014
5,591,496
2 de agosto de 2014
5,591,496
3 de agosto de 2014
5,591,496
4 de agosto de 2014
5,591,496
5 de agosto de 2014
5,591,496
6 de agosto de 2014
5,591,496
7 de agosto de 2014
5,591,496
8 de agosto de 2014
5,591,496
9 de agosto de 2014
5,591,496
10 de agosto de 2014
5,591,496
11 de agosto de 2014
5,591,496
12 de agosto de 2014
5,591,496
13 de agosto de 2014
5,591,496
14 de agosto de 2014
5,591,496
15 de agosto de 2014
5,591,496
16 de agosto de 2014
5,591,496
17 de agosto de 2014
5,591,496
18 de agosto de 2014
5,591,496
19 de agosto de 2014
5,591,496
20 de agosto de 2014
5,591,496
21 de agosto de 2014
5,591,496
22 de agosto de 2014
5,591,496
23 de agosto de 2014
5,591,496
24 de agosto de 2014
5,591,496
25 de agosto de 2014
5,591,496
26 de agosto de 2014
5,591,496
27 de agosto de 2014
5,591,496
28 de agosto de 2014
5,591,496
29 de agosto de 2014
5,591,496
30 de agosto de 2014
5,591,496
31 de agosto de 2014
5,591,496
1 de septiembre de 2014
5,591,496
2 de septiembre de 2014
5,591,496
3 de septiembre de 2014
5,591,496
4 de septiembre de 2014
5,591,496
5 de septiembre de 2014
5,591,496
257,208,831
72,801,282
24,024,423
10
48,776,859
20
22,533,730
676,012
21,857,718
15,600,275
2,287,559
13,312,716
6,933,455
624,011
6,309,444
2,399,550
14
2,800,542
16
27,733,822
13,866,911
7,765,470
17
6,101,441
13
8,666,819
4,333,410
15
4,333,410
15
1,516,555
0.02%
3,033,110
0.05%
4,549,665
0.07%
6,066,221
0.10%
11,701,003
0.19%
17,950,503
0.29%
24,935,627
0.41%
33,208,452
0.54%
42,887,782
0.70%
61,858,001
1.01%
80,828,220
1.32%
99,798,440
1.63%
118,768,659
1.94%
137,738,878
2.25%
158,578,998
2.59%
179,419,118
2.93%
200,259,238
3.27%
221,099,358
3.61%
241,939,478
3.95%
24-Aug
23-Aug
15-Aug
22-Aug
14-Aug
10 11 12 13 14 15 16 17 18 19
% Programado Acumulado
21-Aug
13-Aug
20-Aug
12-Aug
19-Aug
11-Aug
29
18-Aug
10-Aug
17-Aug
9-Aug
27
16-Aug
8-Aug
1,386,691
26
5,200,092
26,347,131
29
7-Aug
DIAS
CALCULADOS
6-Aug
VALOR
TOTAL CON AIU
262,779,597
4.29%
283,619,717
4.63%
304,459,837
4.97%
325,299,957
5.31%
346,140,077
5.65%
366,980,196
5.99%
387,820,316
6.33%
405,856,179
6.62%
423,892,043
6.92%
441,927,906
7.21%
454,439,037
7.42%
454,439,037
7.42%
464,896,359
7.59%
475,820,067
7.76%
486,743,776
7.94%
496,533,378
8.10%
506,322,979
8.26%
516,412,014
8.43%
526,867,830
8.60%
537,644,616
8.77%
547,445,685
8.93%
557,246,753
9.09%
567,047,822
9.25%
576,628,153
9.41%
588,499,380
9.60%
602,614,611
9.83%
630,148,536
10.28%
659,652,248
10.76%
691,219,926
11.28%
721,121,033
11.77%
748,897,516
12.22%
776,673,999
12.67%
804,450,483
13.13%
832,226,966
13.58%
860,003,449
14.03%
887,779,932
14.49%
915,556,415
14.94%
943,332,898
15.39%
971,109,381
15.85%
998,885,864
16.30%
1,023,154,651
16.70%
1,047,423,437
17.09%
1,053,014,934
17.18%
1,058,606,430
17.27%
1,064,197,926
17.37%
1,069,789,423
17.46%
1,075,380,919
17.55%
1,080,972,415
17.64%
1,086,563,912
17.73%
1,092,155,408
17.82%
1,097,746,904
17.91%
1,103,338,401
18.00%
1,108,929,897
18.10%
1,114,521,393
18.19%
1,120,112,890
18.28%
1,125,704,386
18.37%
1,131,295,882
18.46%
1,136,887,378
18.55%
1,142,478,875
18.64%
1,148,070,371
18.73%
1,153,661,867
18.83%
1,159,253,364
18.92%
1,164,844,860
19.01%
1,170,436,356
19.10%
1,176,027,853
19.19%
1,181,619,349
19.28%
1,187,210,845
19.37%
1,192,802,342
19.46%
1,198,393,838
19.56%
1,203,985,334
19.65%
1,209,576,831
19.74%
1,215,168,327
19.83%
1,220,759,823
19.92%
1,226,351,320
20.01%
1,231,942,816
20.10%
1,237,534,312
20.19%
1,243,125,809
20.29%
1,248,717,305
20.38%
1,254,308,801
20.47%
1,259,900,298
20.56%
1,265,491,794
20.65%
1,271,083,290
20.74%
1,276,674,787
20.83%
1,282,266,283
20.92%
1,287,857,779
21.02%
1,293,449,276
21.11%
1,299,040,772
21.20%
1,304,632,268
21.29%
1,310,223,765
21.38%
1,315,815,261
21.47%
1,321,406,757
21.56%
1,326,998,254
21.65%
1,332,589,750
21.75%
1,338,181,246
21.84%
1,343,772,743
21.93%
1,349,364,239
22.02%
1,354,955,735
22.11%
1,360,547,232
22.20%
1,366,138,728
22.29%
1,371,730,224
22.38%
1,377,321,721
22.48%
1,382,913,217
22.57%
1,388,504,713
22.66%
1,394,096,210
22.75%
20 21 22 23 24 25 26 27 28 29 30
4-Sep
3-Sep
2-Sep
1-Sep
31-Aug
30-Aug
29-Aug
28-Aug
27-Aug
26-Aug
25-Aug
ACTIVIDAD
UNIDAD CANTIDAD
EDIFICIO DE PRODUCCION
Excavaciones y rellenos
Acero de refuerzo para cimentaciones y columnas
Concretos: ciclpeos, solados, vigas y columnas
EDIFICIO DE ADMINISTRACION
Excavaciones y rellenos
Concreto para cimentaciones
Concreto para superestructura
Instalaciones hidrosanitarias
VIAS PRINCIPAL Y SECUNDARIA
Instalacin de arrecife
EDIFICIO DE TALLER
Rellenos con arrecife y fundida de superestructura
EDIFICIO DE CASINO
Excavaciones y rellenos
Concreto para cimentacin y superestructura
Instalaciones hidrosanitarias
PORTERIA PRINCIPAL
Excavaciones y rellenos para cimentacin y tubera
Aceros y concreto para cimentacin y placa contrapiso
Instalaciones hidrosanitarias
LAGUNAS PLANTA DE TRATAMIENTO
Excavacin mecnica
POZO PROFUNDO
Construccin de pozo
Instalacin de equipos electricos sumergibles
TANQUES DE 50000 LITROS
Excavaciones y concreto para solado
RED DE AGUAS LLUVIAS
Excavaciones, rellenos y cajas en concreto
Instalacin de tubera
RED SANITARIA
Excavaciones, rellenos y cajas en concreto
Instalacin tubera y suministro sistema sptico integrado
FECHA
6 de mayo de 2014
7 de mayo de 2014
8 de mayo de 2014
9 de mayo de 2014
10 de mayo de 2014
11 de mayo de 2014
12 de mayo de 2014
13 de mayo de 2014
14 de mayo de 2014
15 de mayo de 2014
16 de mayo de 2014
17 de mayo de 2014
18 de mayo de 2014
19 de mayo de 2014
20 de mayo de 2014
21 de mayo de 2014
RENDIMIENTO DIA
GL
GL
GL
1.00
1.00
1.00
0.50
0.14
0.17
GL
GL
GL
GL
1.00
1.00
1.00
1.00
1.00
0.50
0.09
0.50
GL
1.00
0.07
GL
1.00
0.07
GL
GL
GL
1.00
1.00
1.00
0.50
0.08
1.00
GL
GL
GL
1.00
1.00
1.00
0.14
0.13
1.00
GL
1.00
0.07
GL
GL
1.00
1.00
0.17
0.11
GL
1.00
0.07
GL
GL
1.00
1.00
0.13
0.14
GL
GL
1.00
1.00
0.08
0.50
8,163,776
12,293,146
12,293,146
12,293,146
18,264,575
18,264,575
14,931,227
14,931,227
14,931,227
14,931,227
14,931,227
14,931,227
14,931,227
14,931,227
12,367,469
12,725,434
22 de mayo de 2014
23 de mayo de 2014
24 de mayo de 2014
25 de mayo de 2014
26 de mayo de 2014
27 de mayo de 2014
28 de mayo de 2014
29 de mayo de 2014
30 de mayo de 2014
31 de mayo de 2014
1 de junio de 2014
2 de junio de 2014
3 de junio de 2014
4 de junio de 2014
5 de junio de 2014
6 de junio de 2014
7 de junio de 2014
8 de junio de 2014
9 de junio de 2014
10 de junio de 2014
11 de junio de 2014
12 de junio de 2014
13 de junio de 2014
14 de junio de 2014
15 de junio de 2014
16 de junio de 2014
17 de junio de 2014
18 de junio de 2014
19 de junio de 2014
20 de junio de 2014
21 de junio de 2014
22 de junio de 2014
23 de junio de 2014
24 de junio de 2014
25 de junio de 2014
26 de junio de 2014
27 de junio de 2014
28 de junio de 2014
29 de junio de 2014
30 de junio de 2014
1 de julio de 2014
2 de julio de 2014
3 de julio de 2014
4 de julio de 2014
5 de julio de 2014
6 de julio de 2014
7 de julio de 2014
8 de julio de 2014
9 de julio de 2014
10 de julio de 2014
11 de julio de 2014
12 de julio de 2014
13 de julio de 2014
14 de julio de 2014
15 de julio de 2014
16 de julio de 2014
17 de julio de 2014
18 de julio de 2014
19 de julio de 2014
20 de julio de 2014
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
12,725,434
12,725,434
12,725,434
12,725,434
12,725,434
12,725,434
12,725,434
12,725,434
19,520,150
19,520,150
19,520,150
19,520,150
19,520,150
19,520,150
4,799,253
4,799,253
4,799,253
4,799,253
4,799,253
4,799,253
5,477,348
11,006,496
10,114,515
10,114,515
10,114,515
10,391,985
10,391,985
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
9,957,147
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
6,630,525
21 de julio de 2014
22 de julio de 2014
23 de julio de 2014
24 de julio de 2014
25 de julio de 2014
26 de julio de 2014
27 de julio de 2014
28 de julio de 2014
29 de julio de 2014
30 de julio de 2014
31 de julio de 2014
1 de agosto de 2014
2 de agosto de 2014
3 de agosto de 2014
4 de agosto de 2014
5 de agosto de 2014
6 de agosto de 2014
7 de agosto de 2014
8 de agosto de 2014
9 de agosto de 2014
10 de agosto de 2014
11 de agosto de 2014
12 de agosto de 2014
13 de agosto de 2014
14 de agosto de 2014
15 de agosto de 2014
16 de agosto de 2014
17 de agosto de 2014
18 de agosto de 2014
19 de agosto de 2014
20 de agosto de 2014
21 de agosto de 2014
22 de agosto de 2014
23 de agosto de 2014
24 de agosto de 2014
25 de agosto de 2014
26 de agosto de 2014
27 de agosto de 2014
28 de agosto de 2014
29 de agosto de 2014
30 de agosto de 2014
31 de agosto de 2014
1 de septiembre de 2014
2 de septiembre de 2014
3 de septiembre de 2014
4 de septiembre de 2014
5 de septiembre de 2014
Inversion Programada de Julio 6 a Agosto 20
INVERSION EJECUTADA A AGOSTO 20
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
8,636,202
8,636,202
8,636,202
8,636,202
10,010,400
10,000,546
10,000,546
10,000,546
16,132,746
14,515,511
15,476,520
15,476,520
15,030,212
15,030,212
13,250,894
13,872,903
14,611,513
13,229,530
12,672,142
14,233,710
12,996,396
12,802,689
17,346,949
17,346,949
13,425,180
13,425,180
13,533,394
13,533,394
13,533,394
12,870,579
$
$
257,208,831
488,361,231
Si observamos los valore anteriores es claro que no estan acorde con los demas datos entregados ya que claramente tanto en la inve
valor ejecutado al programdo situacion que no se refleja en la columna inversion ejecutada diaria, por tanto e
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
113,810,316
17,071,547
50,076,539
46,662,230
25,264,945
1,339,042
2,829,674
18,367,615
2,728,614
4,277,663
4,277,663
5,948,625
5,948,625
10,137,170
1,013,717
8,616,595
506,859
2,116,552
931,283
1,058,276
126,993
3,832,073
3,832,073
12,008,647
5,043,632
6,965,015
6,193,699
6,193,699
15,150,055
8,484,031
6,666,024
10,694,157
1,390,240
9,303,917
2
7
6
14-Aug
15-Aug
10 11 12 13 14 15 16 17
1
2
11
2
###
######
15
#############################################
15
#############################################
2
13
1
######
#######################################
###
#################################
######
7
8
1
#####################
########################
###
15
#############################################
6
9
##################
###########################
15
#############################################
8
7
############
############
#####################
13
2
#####################
##################
######
#############################################
Inversion Ejecutada Acumulada
% Ejecutado Acumulado
8,163,776
0.13%
20,456,921
0.33%
32,750,067
0.53%
45,043,213
0.74%
63,307,789
1.03%
81,572,364
1.33%
96,503,591
1.57%
111,434,819
1.82%
126,366,046
2.06%
141,297,274
2.31%
156,228,501
2.55%
171,159,728
2.79%
186,090,956
3.04%
201,022,183
3.28%
213,389,653
3.48%
226,115,087
3.69%
22-Aug
13-Aug
######
#####################
##################
21-Aug
12-Aug
20-Aug
11-Aug
19-Aug
10-Aug
18-Aug
9-Aug
17-Aug
8-Aug
16-Aug
7-Aug
DIAS
EJECUTADOS
6-Aug
VALOR
TOTAL CON AIU
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
238,840,521
251,565,956
264,291,390
277,016,824
289,742,259
302,467,693
315,193,127
327,918,562
347,438,711
366,958,861
386,479,011
405,999,160
425,519,310
445,039,460
445,039,460
449,838,713
454,637,966
459,437,220
464,236,473
469,035,727
473,834,980
479,312,328
490,318,824
500,433,340
510,547,855
520,662,370
531,054,355
541,446,339
551,403,487
561,360,634
571,317,782
581,274,929
591,232,076
601,189,224
611,146,371
621,103,519
631,060,666
641,017,814
650,974,961
660,932,109
670,889,256
680,846,404
690,803,551
700,760,698
710,717,846
717,348,371
723,978,895
730,609,420
737,239,944
743,870,469
750,500,994
757,131,518
763,762,043
770,392,567
777,023,092
783,653,617
790,284,141
796,914,666
803,545,190
810,175,715
3.90%
4.11%
4.31%
4.52%
4.73%
4.94%
5.14%
5.35%
5.67%
5.99%
6.31%
6.63%
6.94%
7.26%
7.26%
7.34%
7.42%
7.50%
7.58%
7.65%
7.73%
7.82%
8.00%
8.17%
8.33%
8.50%
8.67%
8.84%
9.00%
9.16%
9.32%
9.49%
9.65%
9.81%
9.97%
10.14%
10.30%
10.46%
10.62%
10.79%
10.95%
11.11%
11.27%
11.43%
11.60%
11.71%
11.81%
11.92%
12.03%
12.14%
12.25%
12.35%
12.46%
12.57%
12.68%
12.79%
12.90%
13.00%
13.11%
13.22%
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
818,811,917
827,448,119
836,084,321
844,720,523
854,730,923
864,731,469
874,732,014
884,732,560
900,865,305
915,380,816
930,857,336
946,333,856
961,364,068
976,394,280
989,645,175
989,645,175
1,003,518,077
1,018,129,590
1,031,359,120
1,044,031,262
1,058,264,972
1,071,261,368
1,084,064,057
1,101,411,006
1,118,757,955
1,132,183,135
1,145,608,315
1,159,141,709
1,172,675,103
1,186,208,497
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
1,199,079,077
13.36%
13.50%
13.64%
13.78%
13.95%
14.11%
14.27%
14.44%
14.70%
14.94%
15.19%
15.44%
15.69%
15.93%
16.15%
16.15%
16.38%
16.61%
16.83%
17.04%
17.27%
17.48%
17.69%
17.97%
18.26%
18.47%
18.69%
18.91%
19.14%
19.36%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
19.57%
que claramente tanto en la inversion programada como en los graficos se observa que es menor el
sion ejecutada diaria, por tanto esta informacion es erronea favor rectificar
18 19 20 21 22 23 24 25 26 27 28 29 30
4-Sep
3-Sep
2-Sep
1-Sep
31-Aug
30-Aug
29-Aug
28-Aug
27-Aug
26-Aug
25-Aug
24-Aug
23-Aug
FECHA
6 de julio de 2014
7 de julio de 2014
8 de julio de 2014
9 de julio de 2014
10 de julio de 2014
11 de julio de 2014
12 de julio de 2014
13 de julio de 2014
14 de julio de 2014
15 de julio de 2014
16 de julio de 2014
17 de julio de 2014
18 de julio de 2014
19 de julio de 2014
20 de julio de 2014
21 de julio de 2014
22 de julio de 2014
23 de julio de 2014
24 de julio de 2014
25 de julio de 2014
26 de julio de 2014
27 de julio de 2014
28 de julio de 2014
29 de julio de 2014
30 de julio de 2014
31 de julio de 2014
1 de agosto de 2014
2 de agosto de 2014
3 de agosto de 2014
4 de agosto de 2014
5 de agosto de 2014
6 de agosto de 2014
7 de agosto de 2014
8 de agosto de 2014
9 de agosto de 2014
10 de agosto de 2014
11 de agosto de 2014
12 de agosto de 2014
13 de agosto de 2014
14 de agosto de 2014
15 de agosto de 2014
16 de agosto de 2014
PORCENTAJES ACUMULADOS
% Programado Acumulado
17.18%
17.27%
17.36%
17.46%
17.55%
17.64%
17.73%
17.82%
17.91%
18.00%
18.09%
18.18%
18.28%
18.37%
18.46%
18.55%
18.64%
18.73%
18.82%
18.91%
19.01%
19.10%
19.19%
19.28%
19.37%
19.46%
19.55%
19.64%
19.74%
19.83%
19.92%
20.01%
20.10%
20.19%
20.28%
20.37%
20.47%
20.56%
20.65%
20.74%
20.83%
20.92%
21.01%
21.10%
21.20%
21.29%
17 de agosto de 2014
18 de agosto de 2014
19 de agosto de 2014
20 de agosto de 2014
22.00%
19.01%
18.91%
18.73%
18.64%
18.55%
18.46%
18.37%
18.28%
18.18%
18.09%
18.00%
17.91%
17.82%
17.73%
17.64%
17.55%
17.46%
17.36%
17.27%
16.00%
17.18%
18.00%
18.82%
20.00%
14.1
13.95%
13.78%
13.64%
13.50%
13.36%
13.22%
13.11%
13.00%
12.90%
12.79%
12.68%
12.57%
12.46%
12.35%
12.25%
12.14%
12.03%
12.00%
11.92%
11.81%
11.71%
FECHA
6 de julio de 2014
7 de julio de 2014
8 de julio de 2014
9 de julio de 2014
10 de julio de 2014
$
$
$
$
$
INVERSION ACUMULADA
$ Programado Acumulado
1,052,907,890.52
1,058,499,386.84
1,064,090,883.17
1,069,682,379.50
1,075,273,875.82
26 de julio de 2014
25 de julio de 2014
24 de julio de 2014
23 de julio de 2014
22 de julio de 2014
21 de julio de 2014
20 de julio de 2014
19 de julio de 2014
18 de julio de 2014
17 de julio de 2014
16 de julio de 2014
15 de julio de 2014
14 de julio de 2014
13 de julio de 2014
12 de julio de 2014
11 de julio de 2014
10 de julio de 2014
9 de julio de 2014
8 de julio de 2014
6 de julio de 2014
10.00%
7 de julio de 2014
14.00%
11 de julio de 2014
12 de julio de 2014
13 de julio de 2014
14 de julio de 2014
15 de julio de 2014
16 de julio de 2014
17 de julio de 2014
18 de julio de 2014
19 de julio de 2014
20 de julio de 2014
21 de julio de 2014
22 de julio de 2014
23 de julio de 2014
24 de julio de 2014
25 de julio de 2014
26 de julio de 2014
27 de julio de 2014
28 de julio de 2014
29 de julio de 2014
30 de julio de 2014
31 de julio de 2014
1 de agosto de 2014
2 de agosto de 2014
3 de agosto de 2014
4 de agosto de 2014
5 de agosto de 2014
6 de agosto de 2014
7 de agosto de 2014
8 de agosto de 2014
9 de agosto de 2014
10 de agosto de 2014
11 de agosto de 2014
12 de agosto de 2014
13 de agosto de 2014
14 de agosto de 2014
15 de agosto de 2014
16 de agosto de 2014
17 de agosto de 2014
18 de agosto de 2014
19 de agosto de 2014
20 de agosto de 2014
$1,250,000,000.00
$1,150,000,000.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1,080,865,372.15
1,086,456,868.48
1,092,048,364.80
1,097,639,861.13
1,103,231,357.46
1,108,822,853.79
1,114,414,350.11
1,120,005,846.44
1,125,597,342.77
1,131,188,839.09
1,136,780,335.42
1,142,371,831.75
1,147,963,328.07
1,153,554,824.40
1,159,146,320.73
1,164,737,817.05
1,170,329,313.38
1,175,920,809.71
1,181,512,306.04
1,187,103,802.36
1,192,695,298.69
1,198,286,795.02
1,203,878,291.34
1,209,469,787.67
1,215,061,284.00
1,220,652,780.32
1,226,244,276.65
1,231,835,772.98
1,237,427,269.30
1,243,018,765.63
1,248,610,261.96
1,254,201,758.29
1,259,793,254.61
1,265,384,750.94
1,270,976,247.27
1,276,567,743.59
1,282,159,239.92
1,287,750,736.25
1,293,342,232.57
1,298,933,728.90
1,304,525,225.23
$1,250,000,000.00
$1,150,000,000.00
$1,050,000,000.00
$950,000,000.00
$850,000,000.00
$750,000,000.00
$650,000,000.00
7/5/2014
7/6/2014
7/7/2014
7/8/2014
7/9/2014
7/10/2014
7/11/2014
7/12/2014
7/13/2014
7/14/2014
7/15/2014
7/16/2014
7/17/2014
7/18/2014
7/19/2014
7/20/2014
7/21/2014
7/22/2014
7/23/2014
7/24/2014
7/25/2014
INVERSION DIARIA
PROGRAMADA
EJECUTADA
$ 24,268,786.39 $
9,957,147.45
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
6,630,524.61
$ 5,591,496.33 $
8,636,201.88
$ 5,591,496.33 $
8,636,201.88
$ 5,591,496.33 $
8,636,201.88
$ 5,591,496.33 $
8,636,201.88
$ 5,591,496.33 $
10,010,400.45
7/26/2014
7/27/2014
7/28/2014
7/29/2014
7/30/2014
7/31/2014
8/1/2014
8/2/2014
8/3/2014
8/4/2014
8/5/2014
8/6/2014
8/7/2014
8/8/2014
8/9/2014
8/10/2014
8/11/2014
8/12/2014
8/13/2014
8/14/2014
8/15/2014
8/16/2014
8/17/2014
8/18/2014
8/19/2014
8/20/2014
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
10,000,545.58
10,000,545.58
10,000,545.58
16,132,745.52
14,515,511.12
15,476,520.01
15,476,520.01
15,030,212.01
15,030,212.01
13,250,894.17
13,872,902.74
14,611,512.54
13,229,530.13
12,672,141.74
14,233,710.24
12,996,396.33
12,802,688.51
17,346,949.32
17,346,949.32
13,425,179.56
13,425,179.56
13,533,394.24
13,533,394.24
13,533,394.24
12,870,579.28
CUMULADOS
% Ejecutado Acumulado
11.71%
11.81%
11.92%
12.03%
12.14%
12.25%
12.35%
12.46%
12.57%
12.68%
12.79%
12.90%
13.00%
13.11%
13.22%
13.36%
13.50%
13.64%
13.78%
13.95%
14.11%
14.27%
14.44%
14.70%
14.94%
15.19%
15.44%
15.69%
15.93%
16.15%
16.15%
16.38%
16.61%
16.83%
17.04%
17.27%
17.48%
17.69%
17.97%
18.26%
18.47%
18.69%
16 de agosto de 2014
15 de agosto de 2014
14 de agosto de 2014
13 de agosto de 2014
12 de agosto de 2014
11 de agosto de 2014
10 de agosto de 2014
9 de agosto de 2014
8 de agosto de 2014
7 de agosto de 2014
6 de agosto de 2014
5 de agosto de 2014
4 de agosto de 2014
3 de agosto de 2014
2 de agosto de 2014
1 de agosto de 2014
31 de julio de 2014
30 de julio de 2014
29 de julio de 2014
28 de julio de 2014
27 de julio de 2014
26 de julio de 2014
25 de julio de 2014
24 de julio de 2014
20.92%
20.83%
20.74%
20.65%
20.56%
20.47%
20.37%
20.28%
20.19%
20.10%
20.01%
19.92%
19.83%
$ Ejecutado Acumulado
717,348,370.52
723,978,895.13
730,609,419.74
737,239,944.35
743,870,468.96
19.74%
CUMULADA
19.64%
19.55%
19.46%
19.37%
19.28%
19.19%
19.10%
19.01%
$
$
$
$
$
18.91%
18.82%
18.73%
18.64%
23 de julio de 2014
18.6
18.47%
18.26%
17.97%
17.69%
17.48%
17.27%
17.04%
16.83%
16.61%
16.38%
16.15%
16.15%
15.93%
15.69%
15.44%
15.19%
14.94%
14.70%
14.44%
14.27%
14.11%
13.95%
13.78%
13.64%
13.50%
13.36%
2%
18.55%
22 de julio de 2014
18.91%
19.14%
19.36%
19.57%
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
750,500,993.57
757,131,518.18
763,762,042.79
770,392,567.40
777,023,092.01
783,653,616.62
790,284,141.23
796,914,665.84
803,545,190.45
810,175,715.06
818,811,916.93
827,448,118.81
836,084,320.69
844,720,522.56
854,730,923.01
864,731,468.59
874,732,014.17
884,732,559.75
900,865,305.27
915,380,816.39
930,857,336.39
946,333,856.40
961,364,068.41
976,394,280.42
989,645,174.60
989,645,174.60
1,003,518,077.34
1,018,129,589.87
1,031,359,120.00
1,044,031,261.74
1,058,264,971.98
1,071,261,368.31
1,084,064,056.82
1,101,411,006.14
1,118,757,955.46
1,132,183,135.02
1,145,608,314.59
1,159,141,708.83
1,172,675,103.07
1,186,208,497.32
1,199,079,076.60
INVERSION DIARIA
$24,000,000.00
$22,000,000.00
$20,000,000.00
$18,000,000.00
$16,000,000.00
$14,000,000.00
$12,000,000.00
$10,000,000.00
$8,000,000.00
$6,000,000.00
$4,000,000.00
$2,000,000.00
EJECUTADA
8/6/2014
8/4/2014
8/2/2014
7/31/2014
PROGRAMADA
7/29/2014
7/27/2014
7/25/2014
7/23/2014
7/21/2014
7/19/2014
7/17/2014
7/15/2014
7/13/2014
7/11/2014
7/9/2014
7/7/2014
7/5/2014
$-
7/21/2014
7/19/2014
7/17/2014
7/15/2014
7/13/2014
7/11/2014
7/9/2014
7/7/2014
7/5/2014
PROGRAMADA
7/29/2014
7/27/2014
7/25/2014
7/23/2014
EJECUTADA
8/6/2014
8/4/2014
8/2/2014
7/31/2014
$-
20 de agosto de 2014
19 de agosto de 2014
18 de agosto de 2014
17 de agosto de 2014
16 de agosto de 2014
15 de agosto de 2014
14 de agosto de 2014
13 de agosto de 2014
12 de agosto de 2014
11 de agosto de 2014
10 de agosto de 2014
9 de agosto de 2014
8 de agosto de 2014
21.29%
21.20%
21.10%
21.01%
20.92%
20.83%
20.74%
20.65%
20.56%
20.47%
20.37%
20.28%
20.19%
19.57%
19.36%
19.14%
18.91%
18.69%
18.47%
18.26%
17.97%
17.69%
17.48%
17.27%
17.04%
16.83%
6.61%
%
% Programado
Acumulado
7/21/2014
7/19/2014
PROGRAMADA
7/29/2014
7/27/2014
7/25/2014
7/23/2014
EJECUTADA
8/20/2014
8/18/2014
8/16/2014
8/14/2014
8/12/2014
8/10/2014
8/8/2014
8/6/2014
8/4/2014
8/2/2014
7/31/2014
$ Programado
Acumulado
INVERSION DIARIA
7/21/2014
7/19/2014
7/29/2014
7/27/2014
7/25/2014
7/23/2014
PROGRAMADA
8/20/2014
8/18/2014
8/16/2014
8/14/2014
8/12/2014
8/10/2014
8/8/2014
8/6/2014
8/4/2014
8/2/2014
7/31/2014
EJECUTADA
ACTIVIDAD
UNIDAD CANTIDAD
REND.
DIA
VALOR
UNITARIO
AREA DE PRODUCCION
Concreto para placa de contrapiso
M2
1818.96
60.63
164,930
M2
820.50
27.35
164,930
Instalaciones Hidrosanitarias
GL
1.00
0.03
45,097,906
GL
1.00
0.11
19,327,674
M2
134.87
67.43
164,930
Mampostera
GL
1.00
0.07
7,865,492
Paete
GL
1.00
0.07
7,865,492
GL
1.00
0.06
5,111,323
Placa de Contrapiso
GL
1.00
0.08
3,407,549
M3
5199
173.31
19,234
Acero de refuerzo
KG
3475
231.64
4,743
Estructuras en concreto
GL
1.00
0.07
16,478,497
Excavaciones
GL
1.00
0.20
5,309,624
Estructuras en concreto
GL
1.00
0.04
29,841,495
ML
708.00
23.60
83,449
Tubera PVC
ML
360.00
32.73
31,954
Campo de Infiltracin
M2
132.11
6.61
161,704
BOXES
Concreto para placa de contrapiso
EDIFICIO DE ADMINISTRACION
TALLERES
Concreto para placa de contrapiso
CASINO
PORTERIAS
RED HIDRAULICA
Estructuras en concreto
GL
1.00
0.08
35,965,229
ML
1784.00
99.11
30,240
19 de agosto de 2014
5,591,496
1,2
20 de agosto de 2014
5,591,496
1,30
21 de agosto de 2014
5,591,496
1,3
22 de agosto de 2014
5,591,496
1,3
23 de agosto de 2014
5,591,496
1,3
24 de agosto de 2014
5,591,496
1,3
25 de agosto de 2014
5,591,496
1,3
26 de agosto de 2014
5,591,496
1,3
27 de agosto de 2014
5,591,496
1,3
28 de agosto de 2014
5,591,496
1,3
29 de agosto de 2014
5,591,496
1,3
30 de agosto de 2014
5,591,496
1,3
31 de agosto de 2014
5,591,496
1,3
1 de septiembre de 2014
5,591,496
1,3
2 de septiembre de 2014
5,591,496
1,3
3 de septiembre de 2014
5,591,496
1,3
4 de septiembre de 2014
5,591,496
1,3
5 de septiembre de 2014
5,591,496
1,3
6 de septiembre de 2014
28,328,505
1,4
7 de septiembre de 2014
28,328,505
1,4
8 de septiembre de 2014
28,328,505
1,4
9 de septiembre de 2014
28,328,505
1,5
10 de septiembre de 2014
28,328,505
1,5
11 de septiembre de 2014
28,460,240
1,5
12 de septiembre de 2014
28,460,240
1,5
13 de septiembre de 2014
28,460,240
1,6
14 de septiembre de 2014
28,460,240
1,6
15 de septiembre de 2014
28,460,240
1,6
16 de septiembre de 2014
29,528,415
1,7
17 de septiembre de 2014
28,482,649
1,7
18 de septiembre de 2014
28,482,649
1,7
19 de septiembre de 2014
28,482,649
1,7
20 de septiembre de 2014
28,482,649
1,82
516,866,679
300,000,000
300,000,000
135,324,897
135,324,897
26-Sep
25-Sep
24-Sep
15-Sep
23-Sep
14-Sep
22-Sep
13-Sep
21-Sep
12-Sep
20-Sep
11-Sep
19-Sep
10-Sep
18-Sep
9-Sep
17-Sep
8-Sep
16-Sep
7-Sep
DIAS
CALC.
6-Sep
VALOR
TOTAL CON AIU
10 11 12 13 14 15 16 17 18 19 20 21
30
###############################################################
30
###############################################################
###############################################################
64,425,580
45,097,906
30
19,327,674
22,243,274
22,243,274
15,730,983
7,865,492
15
7,865,492
15
#############################################
##################
8,518,872
5,111,323
18
3,407,549
12
#########
100,000,000
100,000,000
30
###############################################################
#############################################
32,956,995
16,478,497
15
16,478,497
15
35,151,119
5,309,624
29,841,495
59,081,710
59,081,710
32,866,922
######################################################
##################
###############
25
################################################
30
###############################################################
11,503,423
11
#################################
21,363,499
20
89,913,073
35,965,229
12
53,947,844
18
#################################
####################################
###########################
###############################################################
1,298,933,729
21.20%
1,304,525,225
21.29%
1,310,116,722
21.38%
1,315,708,218
21.47%
1,321,299,714
21.56%
1,326,891,211
21.65%
1,332,482,707
21.74%
1,338,074,203
21.83%
1,343,665,700
21.93%
1,349,257,196
22.02%
1,354,848,692
22.11%
1,360,440,188
22.20%
1,366,031,685
22.29%
1,371,623,181
22.38%
1,377,214,677
22.47%
1,382,806,174
22.56%
1,388,397,670
22.66%
1,393,989,166
22.75%
1,422,317,672
23.21%
1,450,646,177
23.67%
1,478,974,682
24.13%
1,507,303,187
24.60%
1,535,631,692
25.06%
1,564,091,932
25.52%
1,592,552,172
25.99%
1,621,012,412
26.45%
1,649,472,652
26.92%
1,677,932,892
27.38%
1,707,461,307
27.86%
1,735,943,957
28.33%
1,764,426,606
28.79%
1,792,909,255
29.26%
1,821,391,905
29.72%
5-Oct
4-Oct
3-Oct
2-Oct
1-Oct
30-Sep
29-Sep
28-Sep
27-Sep
22 23 24 25 26 27 28 29 30
###########################
###########################
###########################
###########################
######
###########################
###########################
###########################
###########################
###########################
###########################
###########################
###########################
###########################
ACTIVIDAD
UNIDAD CANTIDAD
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
CASINO
PORTERIA #1
LAGUNA
BASCULAS
DIQUE ACPM
TANQUE
RED AGUAS LLUVIAS PLUVIAL
RED SANITARIA ALCANTARILLADO
FECHA
20 de agosto de 2014
21 de agosto de 2014
22 de agosto de 2014
23 de agosto de 2014
24 de agosto de 2014
25 de agosto de 2014
26 de agosto de 2014
27 de agosto de 2014
28 de agosto de 2014
29 de agosto de 2014
30 de agosto de 2014
31 de agosto de 2014
1 de septiembre de 2014
2 de septiembre de 2014
3 de septiembre de 2014
4 de septiembre de 2014
5 de septiembre de 2014
6 de septiembre de 2014
7 de septiembre de 2014
8 de septiembre de 2014
9 de septiembre de 2014
10 de septiembre de 2014
11 de septiembre de 2014
12 de septiembre de 2014
13 de septiembre de 2014
14 de septiembre de 2014
15 de septiembre de 2014
16 de septiembre de 2014
17 de septiembre de 2014
18 de septiembre de 2014
19 de septiembre de 2014
20 de septiembre de 2014
GL
GL
GL
GL
GL
GL
GL
GL
GL
GL
GL
GL
GL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
0.065
0.060
0.054
0.004
0.178
0.163
0.072
0.166
0.084
0.034
0.610
0.009
0.016
RENDIMIENTO
VALOR
DIA
TOTAL CON AIU
$
$
$
$
$
$
$
$
$
$
$
$
$
9,104,074
2,819,269
1,670,293
3,884,930
988,590
419,493
212,972
2,894,880
1,098,566
374,757
2,636,334
1,969,390
1,095,564
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
159,163,775
40,347,317
24,422,245
842,062
15,819,923
10,287,862
1,844,160
57,642,085
11,130,134
1,534,589
64,347,048
1,098,837
1,027,714
17
14
15
1
16
25
9
20
10
4
24
1
1
26-Aug
27-Aug
28-Aug
29-Aug
30-Aug
5-Sep
6-Sep
7-Sep
8-Sep
9-Sep
10-Sep
11-Sep
12-Sep
13-Sep
10 11 12 13 14 15 16
4-Sep
25-Aug
3-Sep
24-Aug
2-Sep
23-Aug
1-Sep
22-Aug
31-Aug
21-Aug
DIAS
EJECUTADOS
#################################
########################
########################
###
##############################
########################################################################
#######################################
############################################################
############
########################################################################
###
########################################################################
version Ejecutada Acumulada
% Ejecutado Acumulado
1,199,079,077
19.57%
1,206,998,852
19.70%
1,212,977,728
19.79%
1,218,956,605
19.89%
1,224,935,481
19.99%
1,230,914,358
20.09%
1,236,893,234
20.18%
1,242,872,111
20.28%
1,248,850,987
20.38%
1,254,829,864
20.48%
1,260,808,741
20.57%
1,266,787,617
20.67%
1,272,766,494
20.77%
1,278,745,370
20.87%
1,293,424,820
21.11%
1,309,034,854
21.36%
1,324,644,888
21.62%
1,344,572,893
21.94%
1,364,500,897
22.27%
1,384,428,902
22.59%
1,404,356,906
22.92%
1,422,414,637
23.21%
1,440,472,368
23.51%
1,458,530,098
23.80%
1,476,587,829
24.09%
1,494,864,787
24.39%
1,510,567,863
24.65%
1,526,270,939
24.91%
1,541,592,983
25.16%
1,556,915,026
25.41%
1,572,750,927
25.66%
1,588,586,828
25.92%
#####################
#########
#####################
#####################
###
######
#####################
5-Oct
4-Oct
3-Oct
2-Oct
1-Oct
30-Sep
29-Sep
28-Sep
27-Sep
26-Sep
25-Sep
24-Sep
23-Sep
22-Sep
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
#####################
#####################
#####################
21-Sep
20-Sep
19-Sep
18-Sep
17-Sep
15-Sep
16-Sep
14-Sep
9
PORCENTAJES ACUMULADOS
% Programado Acumulado
21.29%
21.38%
21.47%
21.56%
21.65%
21.74%
21.83%
21.93%
22.02%
22.11%
22.20%
22.29%
22.38%
22.47%
22.56%
22.66%
22.75%
23.21%
23.67%
24.13%
24.60%
25.06%
25.52%
25.99%
26.45%
26.92%
27.38%
27.86%
28.33%
28.79%
29.26%
29.72%
FECHA
20 de agosto de 2014
21 de agosto de 2014
22 de agosto de 2014
23 de agosto de 2014
24 de agosto de 2014
25 de agosto de 2014
26 de agosto de 2014
27 de agosto de 2014
28 de agosto de 2014
29 de agosto de 2014
30 de agosto de 2014
31 de agosto de 2014
1 de septiembre de 2014
2 de septiembre de 2014
3 de septiembre de 2014
4 de septiembre de 2014
5 de septiembre de 2014
6 de septiembre de 2014
7 de septiembre de 2014
8 de septiembre de 2014
9 de septiembre de 2014
10 de septiembre de 2014
11 de septiembre de 2014
12 de septiembre de 2014
13 de septiembre de 2014
14 de septiembre de 2014
15 de septiembre de 2014
16 de septiembre de 2014
17 de septiembre de 2014
18 de septiembre de 2014
19 de septiembre de 2014
20 de septiembre de 2014
0.340095005
0.3450932181
0.3500914313
0.3550896444
0.3600878575
0.3669008929
0.3737139283
31.00%
29.00%
27.00%
25.00%
22.47%2
22.38%2
22.29%2
22.20%
22.11%
22.02
21.93
21.74
21.6
21.5
21.4
21.
21.
21.83
23.00%
27.00%
25.00%
26 de agosto de 2014
27 de agosto de 2014
28 de agosto de 2014
29 de agosto de 2014
30 de agosto de 2014
31 de agosto de 2014
1 de septiembre de 2014
2 de septiembre de 2014
3 de septiembre de 2014
4 de septiembre de 2014
5 de septiembre de 2014
6 de septiembre de 2014
7 de septiembre de 2014
8 de septiembre de 2014
9 de septiembre de 2014
10 de septiembre de 2014
11 de septiembre de 2014
12 de septiembre de 2014
13 de septiembre de 2014
14 de septiembre de 2014
22.47%20.87%
25 de agosto de 2014
INVERSION ACUMULADA
$ Programado Acumulado
1,304,525,225.23
1,310,116,721.55
1,315,708,217.88
1,321,299,714.21
1,326,891,210.54
1,332,482,706.86
1,338,074,203.19
1,343,665,699.52
1,349,257,195.84
1,354,848,692.17
1,360,440,188.50
1,366,031,684.82
1,371,623,181.15
1,377,214,677.48
1,382,806,173.80
1,388,397,670.13
1,393,989,166.46
1,422,317,671.52
1,450,646,176.59
1,478,974,681.65
1,507,303,186.72
1,535,631,691.79
1,564,091,931.86
1,592,552,171.94
1,621,012,412.02
1,649,472,652.10
22.38%20.77%
24 de agosto de 2014
22.29%20.67%
23 de agosto de 2014
22.20%20.57%
22 de agosto de 2014
22.11%20.48%
21 de agosto de 2014
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
22.02%20.38%
FECHA
20 de agosto de 2014
21.93%20.28%
21.74%20.09%
21.65%19.99%
21.56%19.89%
21.47%19.79%
21.38%19.70%
19.00%
21.29%19.57%
21.00%
21.83%20.18%
23.00%
15 de septiembre de 2014
16 de septiembre de 2014
17 de septiembre de 2014
18 de septiembre de 2014
19 de septiembre de 2014
20 de septiembre de 2014
$
$
$
$
$
$
1,677,932,892.18
1,707,461,307.22
1,735,943,956.57
1,764,426,605.91
1,792,909,255.25
1,821,391,904.60
$1,800,000,000.00
$1,700,000,000.00
$1,600,000,000.00
$1,500,000,000.00
$1,400,000,000.00
$1,300,000,000.00
$1,200,000,000.00
$1,100,000,000.00
7/5/2014
7/6/2014
7/7/2014
7/8/2014
7/9/2014
7/10/2014
7/11/2014
7/12/2014
7/13/2014
7/14/2014
7/15/2014
$
$
$
$
$
$
$
$
$
$
$
INVERSION DIARIA
PROGRAMADA
EJECUTADA
24,268,786.39 $
9,957,147.45
5,591,496.33 $
6,630,524.61
5,591,496.33 $
6,630,524.61
5,591,496.33 $
6,630,524.61
5,591,496.33 $
6,630,524.61
5,591,496.33 $
6,630,524.61
5,591,496.33 $
6,630,524.61
5,591,496.33 $
6,630,524.61
5,591,496.33 $
6,630,524.61
5,591,496.33 $
6,630,524.61
5,591,496.33 $
6,630,524.61
7/16/2014
7/17/2014
7/18/2014
7/19/2014
7/20/2014
7/21/2014
7/22/2014
7/23/2014
7/24/2014
7/25/2014
7/26/2014
7/27/2014
7/28/2014
7/29/2014
7/30/2014
7/31/2014
8/1/2014
8/2/2014
8/3/2014
8/4/2014
8/5/2014
8/6/2014
8/7/2014
8/8/2014
8/9/2014
8/10/2014
8/11/2014
8/12/2014
8/13/2014
8/14/2014
8/15/2014
8/16/2014
8/17/2014
8/18/2014
8/19/2014
8/20/2014
8/21/2014
8/22/2014
8/23/2014
8/24/2014
8/25/2014
8/26/2014
8/27/2014
8/28/2014
8/29/2014
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
6,630,524.61
6,630,524.61
6,630,524.61
6,630,524.61
6,630,524.61
8,636,201.88
8,636,201.88
8,636,201.88
8,636,201.88
10,010,400.45
10,000,545.58
10,000,545.58
10,000,545.58
16,132,745.52
14,515,511.12
15,476,520.01
15,476,520.01
15,030,212.01
15,030,212.01
13,250,894.17
13,872,902.74
14,611,512.54
13,229,530.13
12,672,141.74
14,233,710.24
12,996,396.33
12,802,688.51
17,346,949.32
17,346,949.32
13,425,179.56
13,425,179.56
13,533,394.24
13,533,394.24
13,533,394.24
12,870,579.28
7,919,774.93
5,978,876.56
5,978,876.56
5,978,876.56
5,978,876.56
5,978,876.56
5,978,876.56
5,978,876.56
5,978,876.56
8/30/2014
8/31/2014
9/1/2014
9/2/2014
9/3/2014
9/4/2014
9/5/2014
9/6/2014
9/7/2014
9/8/2014
9/9/2014
9/10/2014
9/11/2014
9/12/2014
9/13/2014
9/14/2014
9/15/2014
9/16/2014
9/17/2014
9/18/2014
9/19/2014
9/20/2014
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
5,591,496.33
28,328,505.07
28,328,505.07
28,328,505.07
28,328,505.07
28,328,505.07
28,460,240.08
28,460,240.08
28,460,240.08
28,460,240.08
28,460,240.08
29,528,415.04
28,482,649.34
28,482,649.34
28,482,649.34
28,482,649.34
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
5,978,876.56
5,978,876.56
5,978,876.56
5,978,876.56
14,679,450.08
15,610,033.81
15,610,033.81
19,928,004.61
19,928,004.61
19,928,004.61
19,928,004.61
18,057,730.70
18,057,730.70
18,057,730.70
18,057,730.70
18,276,957.75
15,703,075.85
15,703,075.85
15,322,043.91
15,322,043.91
15,835,900.83
15,835,900.83
UMULADOS
% Ejecutado Acumulado
19.57%
19.70%
19.79%
19.89%
19.99%
20.09%
20.18%
20.28%
20.38%
20.48%
20.57%
20.67%
20.77%
20.87%
21.11%
21.36%
21.62%
21.94%
22.27%
22.59%
22.92%
23.21%
23.51%
23.80%
24.09%
24.39%
24.65%
24.91%
25.16%
25.41%
25.66%
25.92%
28.79%
28.33%
27.86%
27.38%
25.41%
24.91%
24.65%
24.39%
24.09%
25.16%
26.92%
26.45%
25.99% 23.80%
25.52% 23.51%
25.06%23.21%
24.60%22.92%
24.13%
22.59%
23.67%
22.27%
23.21%
21.94
22.75%
21.6
22.66%
21.
22.56%
21
22.47%2
22.38%2
22.29%2
25.16%
25.41%
24.91%
24.65%
24.39%
24.09%
6%
38%
6.92%
26.45%
25.99% 23.80%
25.52% 23.51%
25.06%23.21%
24.60%22.92%
$ Ejecutado Acumulado
1,199,079,076.60
1,206,998,851.53
1,212,977,728.09
1,218,956,604.65
1,224,935,481.20
1,230,914,357.76
1,236,893,234.32
1,242,872,110.88
1,248,850,987.44
1,254,829,864.00
1,260,808,740.55
1,266,787,617.11
1,272,766,493.67
1,278,745,370.23
1,293,424,820.31
1,309,034,854.12
1,324,644,887.93
1,344,572,892.54
1,364,500,897.16
1,384,428,901.77
1,404,356,906.39
1,422,414,637.09
1,440,472,367.79
1,458,530,098.49
1,476,587,829.19
1,494,864,786.94
24.13%
22.59%
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
23.67%
22.27%
23.21%
21.94%
22.75%
21.62%
22.66%
21.36%
22.56%
21.11%
22.47%20.87%
22.38%20.77%
22.29%20.67%
MULADA
$
$
$
$
$
$
1,510,567,862.79
1,526,270,938.64
1,541,592,982.54
1,556,915,026.45
1,572,750,927.28
1,588,586,828.10
INVERSION DIA
$30,000,000.00
$28,000,000.00
$26,000,000.00
$24,000,000.00
$22,000,000.00
$20,000,000.00
$24,000,000.00
$22,000,000.00
$20,000,000.00
$18,000,000.00
$16,000,000.00
$14,000,000.00
$12,000,000.00
$10,000,000.00
$8,000,000.00
$6,000,000.00
$4,000,000.00
$2,000,000.00
$PROGRAMADA
EJECU
29.72%
29.26%
28.79%
28.33%
27.86%
25.92%
24.39%
24.65%
24.91%
25.16%
25.41%
25.66%
27.38%
26.92%
24.09%
25.99% 23.80%
26.45%
PORCENTAJES
ACUMULADOS
25.92%
25.66%
25.16%
25.41%
%
24.91%
24.39%
24.65%
6%
38%
6.92%
24.09%
25.99% 23.80%
26.45%
PORCENTAJES
ACUMULADOS
$ Programado
Acumulado
INVERSION DIARIA
PROGRAMADA
EJECUTADA
CAPITULO
FRENTE
CANTIDAD
REND.
DIA
VALOR
UNITARIO
VALOR
TOTAL CON AIU
PRODUCCION
300,000,000
BOXES
135,324,897
ADMINISTRACION
64,425,580
VIAS
TALLERES
22,243,274
CASINO
5,435,408
PORTERIA #1
8,518,872
LAGUNA
TANQUE PRODUCCION #1
26,156,699
10
TANQUE PRODUCCION #2
82,516,616
11
BASCULAS
32,956,995
12
CARCAMO
13
DIQUE ACPM
14
POZO
15
TANQUE
35,151,119
16
17
18
RED HIDRAULICA
89,913,073
19
RED ELECTRICA
20
RED ELECTRICA 2
FECHA
20-Sep-14
28,482,649
1,821,391,905
21-Sep-14
28,482,649
1,849,874,554
22-Sep-14
28,482,649
1,878,357,203
23-Sep-14
28,482,649
1,906,839,853
24-Sep-14
28,482,649
1,935,322,502
25-Sep-14
28,482,649
1,963,805,151
26-Sep-14
28,482,649
1,992,287,801
27-Sep-14
30,630,169
2,022,917,969
28-Sep-14
30,630,169
2,053,548,138
29-Sep-14
30,630,169
2,084,178,307
30-Sep-14
30,630,169
2,114,808,475
1-Oct-14
30,630,169
2,145,438,644
2-Oct-14
30,630,169
2,176,068,813
3-Oct-14
30,630,169
2,206,698,981
4-Oct-14
41,751,806
2,248,450,787
5-Oct-14
41,751,806
2,290,202,593
6-Oct-14
26,754,751
2,316,957,344
7-Oct-14
26,754,751
2,343,712,095
8-Oct-14
26,754,751
2,370,466,846
9-Oct-14
26,754,751
2,397,221,597
10-Oct-14
26,754,751
2,423,976,349
11-Oct-14
26,754,751
2,450,731,100
12-Oct-14
26,754,751
2,477,485,851
13-Oct-14
26,754,751
2,504,240,602
14-Oct-14
26,754,751
2,530,995,353
15-Oct-14
26,754,751
2,557,750,104
16-Oct-14
26,754,751
2,584,504,856
17-Oct-14
26,754,751
2,611,259,607
18-Oct-14
26,754,751
2,638,014,358
19-Oct-14
26,754,751
2,664,769,109
20-Oct-14
26,754,751
2,691,523,860
870,131,956
31-Oct
30-Oct
29-Oct
28-Oct
27-Oct
26-Oct
25-Oct
15-Oct
24-Oct
14-Oct
23-Oct
13-Oct
22-Oct
12-Oct
21-Oct
11-Oct
20-Oct
10-Oct
19-Oct
9-Oct
18-Oct
8-Oct
17-Oct
7-Oct
16-Oct
6-Oct
DIAS
CALC.
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
##############################################################################
##############################################################################
##############################################################################
##############################################################################
##############################################################################
##############################################################################
##############################################################################
##############################################################################
##############################################################################
##############################################################################
##############################################################################
##############################################################################
amada Acumulada
% Programado Acumulado
1,821,391,905
29.72%
1,849,874,554
30.19%
1,878,357,203
30.65%
1,906,839,853
31.12%
1,935,322,502
31.58%
1,963,805,151
32.05%
1,992,287,801
32.51%
2,022,917,969
33.01%
2,053,548,138
33.51%
2,084,178,307
34.01%
2,114,808,475
34.51%
2,145,438,644
35.01%
2,176,068,813
35.51%
2,206,698,981
36.01%
2,248,450,787
36.69%
2,290,202,593
37.37%
2,316,957,344
37.81%
2,343,712,095
38.24%
2,370,466,846
38.68%
2,397,221,597
39.12%
2,423,976,349
39.55%
2,450,731,100
39.99%
2,477,485,851
40.43%
2,504,240,602
40.86%
2,530,995,353
41.30%
2,557,750,104
41.74%
2,584,504,856
42.17%
2,611,259,607
42.61%
2,638,014,358
43.05%
2,664,769,109
43.48%
2,691,523,860
43.92%
4-Nov
3-Nov
2-Nov
1-Nov
27 28 29 30
############
############
############
############
############
############
############
############
############
############
############
############
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
FECHA
20-Sep-14
21-Sep-14
22-Sep-14
23-Sep-14
24-Sep-14
25-Sep-14
26-Sep-14
27-Sep-14
28-Sep-14
29-Sep-14
30-Sep-14
1-Oct-14
2-Oct-14
3-Oct-14
4-Oct-14
5-Oct-14
6-Oct-14
7-Oct-14
8-Oct-14
9-Oct-14
10-Oct-14
11-Oct-14
12-Oct-14
13-Oct-14
14-Oct-14
15-Oct-14
16-Oct-14
17-Oct-14
18-Oct-14
19-Oct-14
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
CASINO
PORTERIA #1
LAGUNA
TANQUE PRODUCCION #1
TANQUE PRODUCCION #2
BASCULAS
CARCAMO
DIQUE ACPM
POZO
TANQUE
RED AGUAS LLUVIAS PLUVIAL
RED SANITARIA ALCANTARILLADO
RED HIDRAULICA
RED ELECTRICA
RED ELECTRICA 2
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-$
$
$
$
$
$
38,173,513
163,839,679
36,564,664
1,070,250
477,207
616,546
63,430,585
19,212,992
4,499,434
293,940
28,678,640
42,215,818
3,095,459
4,172,218
23-Sep
24-Sep
25-Sep
26-Sep
VALOR
TOTAL CON AIU
FRENTE
22-Sep
CAPITULO
21-Sep
##################
##################
##################
##################
##################
##################
##################
##################
##################
##################
##################
##################
##################
##################
##################
##################
Inversion Ejecutada Acumulada
% Ejecutado Acumulado
$
1,588,586,828
25.92%
$
1,601,972,856
26.14%
$
1,615,358,885
26.36%
$
1,628,744,913
26.58%
$
1,642,130,941
26.80%
$
1,655,516,969
27.01%
$
1,668,902,997
27.23%
$
1,682,289,026
27.45%
$
1,695,675,054
27.67%
$
1,709,061,082
27.89%
$
1,722,447,110
28.11%
$
1,735,833,138
28.33%
$
1,749,219,167
28.54%
$
1,762,605,195
28.76%
$
1,775,991,223
28.98%
$
1,789,377,251
29.20%
$
1,802,763,279
29.42%
$
1,816,149,308
29.64%
$
1,829,535,336
29.85%
$
1,842,921,364
30.07%
$
1,856,307,392
30.29%
$
1,869,693,420
30.51%
$
1,883,079,449
30.73%
$
1,896,465,477
30.95%
$
1,909,851,505
31.16%
$
1,923,237,533
31.38%
$
1,936,623,561
31.60%
$
1,950,009,590
31.82%
$
1,963,395,618
32.04%
$
1,976,781,646
32.26%
20-Oct-14
$
$
13,386,028
401,580,846
1,990,167,674
32.48%
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
########################################################################
######################################################################## 0
ecutado Acumulado
25.92%
26.14%
26.36%
26.58%
26.80%
27.01%
27.23%
27.45%
27.67%
27.89%
28.11%
28.33%
28.54%
28.76%
28.98%
29.20%
29.42%
29.64%
29.85%
30.07%
30.29%
30.51%
30.73%
30.95%
31.16%
31.38%
31.60%
31.82%
32.04%
32.26%
24-Oct
23-Oct
22-Oct
21-Oct
20-Oct
19-Oct
18-Oct
17-Oct
16-Oct
15-Oct
14-Oct
13-Oct
12-Oct
11-Oct
10-Oct
9-Oct
8-Oct
7-Oct
6-Oct
5-Oct
4-Oct
30-Sep
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
3-Oct
29-Sep
9
2-Oct
28-Sep
8
1-Oct
27-Sep
7
32.48%
35 36 37 38 39 40 41 42 43 44 45 46
5-Nov
4-Nov
3-Nov
2-Nov
1-Nov
31-Oct
30-Oct
29-Oct
28-Oct
27-Oct
26-Oct
25-Oct
FECHA
20 de septiembre de 2014
21 de septiembre de 2014
22 de septiembre de 2014
23 de septiembre de 2014
24 de septiembre de 2014
25 de septiembre de 2014
26 de septiembre de 2014
27 de septiembre de 2014
28 de septiembre de 2014
29 de septiembre de 2014
30 de septiembre de 2014
1 de octubre de 2014
2 de octubre de 2014
3 de octubre de 2014
4 de octubre de 2014
5 de octubre de 2014
6 de octubre de 2014
7 de octubre de 2014
8 de octubre de 2014
9 de octubre de 2014
10 de octubre de 2014
11 de octubre de 2014
12 de octubre de 2014
13 de octubre de 2014
14 de octubre de 2014
15 de octubre de 2014
16 de octubre de 2014
17 de octubre de 2014
18 de octubre de 2014
19 de octubre de 2014
20 de octubre de 2014
45.00%
40.00%
35.00%
30.00%
PORCENTAJES ACUMULADOS
% Programado Acumulado
29.72%
30.19%
30.65%
31.12%
31.58%
32.05%
32.51%
33.01%
33.51%
34.01%
34.51%
35.01%
35.51%
36.01%
36.69%
37.37%
37.81%
38.24%
38.68%
39.12%
39.55%
39.99%
40.43%
40.86%
41.30%
41.74%
42.17%
42.61%
43.05%
43.48%
43.92%
0.340095005
0.3450932181
0.3500914313
0.3550896444
0.3600878575
0.3669008929
0.3737139283
35.00%
30.00%
25.00%
20.00%
FECHA
20 de septiembre de 2014
21 de septiembre de 2014
22 de septiembre de 2014
23 de septiembre de 2014
24 de septiembre de 2014
25 de septiembre de 2014
26 de septiembre de 2014
27 de septiembre de 2014
28 de septiembre de 2014
29 de septiembre de 2014
30 de septiembre de 2014
1 de octubre de 2014
2 de octubre de 2014
3 de octubre de 2014
4 de octubre de 2014
5 de octubre de 2014
6 de octubre de 2014
7 de octubre de 2014
8 de octubre de 2014
9 de octubre de 2014
10 de octubre de 2014
11 de octubre de 2014
12 de octubre de 2014
13 de octubre de 2014
14 de octubre de 2014
15 de octubre de 2014
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
INVERSION ACUMULADA
$ Programado Acumulado
1,821,391,904.60
1,849,874,553.94
1,878,357,203.28
1,906,839,852.63
1,935,322,501.97
1,963,805,151.32
1,992,287,800.66
2,022,917,969.35
2,053,548,138.04
2,084,178,306.73
2,114,808,475.42
2,145,438,644.11
2,176,068,812.80
2,206,698,981.49
2,248,450,787.18
2,290,202,592.88
2,316,957,344.03
2,343,712,095.18
2,370,466,846.33
2,397,221,597.48
2,423,976,348.63
2,450,731,099.78
2,477,485,850.93
2,504,240,602.08
2,530,995,353.23
2,557,750,104.38
16 de octubre de 2014
17 de octubre de 2014
18 de octubre de 2014
19 de octubre de 2014
20 de octubre de 2014
$2,760,000,000.00
$2,580,000,000.00
$2,400,000,000.00
$2,220,000,000.00
$2,040,000,000.00
$1,860,000,000.00
$1,680,000,000.00
$1,500,000,000.00
$
$
$
$
$
2,584,504,855.54
2,611,259,606.69
2,638,014,357.84
2,664,769,108.99
2,691,523,860.14
UMULADOS
% Ejecutado Acumulado
25.92%
26.14%
26.36%
26.58%
26.80%
27.01%
27.23%
27.45%
27.67%
27.89%
28.11%
28.33%
28.54%
28.76%
28.98%
29.20%
29.42%
29.64%
29.85%
30.07%
30.29%
30.51%
30.73%
30.95%
31.16%
31.38%
31.60%
31.82%
32.04%
32.26%
32.48%
MULADA
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$ Ejecutado Acumulado
1,588,586,828.10
1,601,972,856.30
1,615,358,884.51
1,628,744,912.71
1,642,130,940.92
1,655,516,969.12
1,668,902,997.33
1,682,289,025.53
1,695,675,053.74
1,709,061,081.94
1,722,447,110.14
1,735,833,138.35
1,749,219,166.55
1,762,605,194.76
1,775,991,222.96
1,789,377,251.17
1,802,763,279.37
1,816,149,307.57
1,829,535,335.78
1,842,921,363.98
1,856,307,392.19
1,869,693,420.39
1,883,079,448.60
1,896,465,476.80
1,909,851,505.00
1,923,237,533.21
$
$
$
$
$
1,936,623,561.41
1,950,009,589.62
1,963,395,617.82
1,976,781,646.03
1,990,167,674.23
% Programado
Acumulado
% Programado
Acumulado
$ Programado
Acumulado
PROGR
CAPITULO
FRENTE
$
Mayo
Junio
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
5,409,770
802,880
CASINO
6,121,295
19,905,263
PORTERIA #1
929,606
LAGUNA
76,182,169
51,702,140
TANQUE PRODUCCION #1
829,995
10
TANQUE PRODUCCION #2
1,530,960
11
BASCULAS
12
CARCAMO
13
DIQUE ACPM
14
POZO
29,760,000
15
TANQUE
1,153,905
16
17
19
RED HIDRAULICA
20
RED ELECTRICA
$
210,626,370
Julio
3
14,575,406
65,312,290
178,212,224
4,958,513
17,459,806
17,000,000
17,228,309
1,615,222
64,425,580
20,553,909
43,113,630
302,751,434
45,450,000
170,855,068
Inversin Programada
20-May-14
158,578,998
20-Jun-14
471,569,538
158,578,998
630,148,536
20-Jul-14
501,147,346
1,131,295,882
20-Aug-14
173,336,386
1,304,632,268
20-Sep-14
516,866,679
1,821,498,948
20-Oct-14
870,131,956
2,691,630,903
20-Nov-14
1,002,661,630
3,694,185,490
PROGRAMADO
Agosto
Septiembre
Octubre
Noviembre
Inversin Programada
Acumulada
300,000,000
300,000,000
300,000,000
200,000,000
1,358,099,920
95,906,578
135,324,897
135,324,897
67,662,449
473,637,140
64,425,580
64,425,580
64,425,580
32,212,790
308,758,643
106,270,954
126,824,863
8,015,312
80,957,785
62,923,933
22,243,274
22,243,274
22,243,274
15,730,983
15,730,983
5,435,408
8,518,872
8,518,872
119,501,246
100,000,000
32,956,995
3,794,633
-
21,761,983
347,385,555
26,156,699
13,078,350
40,065,044
82,516,616
41,258,308
125,305,884
32,956,995
16,478,497
82,392,487
4,214,638
4,214,638
5,621,348
5,621,348
118,323,630
$
$
35,151,119
88,454,751
59,081,710
59,081,710
118,163,419
32,866,922
32,866,922
65,733,844
89,913,073
179,826,147
85,734,477
709,756,294
896,213,427
35,151,119
89,913,073
802,642,535
% Programado Acumulado
2.59%
213,389,652.51
10.28%
561,360,634.09
18.46%
810,175,715.06
21.29%
1,199,079,076.60
29.72%
1,588,586,828.10
43.92%
1,990,167,674.23
60.28%
2,861,889,294.48
16,998,607
85,734,477
601,340,362
Porcentaje Programado
Acumulado
55.25%
70.00%
68.46%
54.41%
90.99%
100.00%
85.15%
100.00%
75.39%
50.62%
62.50%
12.50%
12.50%
100.00%
83.88%
100.00%
100.00%
100.00%
12.50%
EJECUTA
CAPITULO
FRENTE
Mayo
Junio
Julio
3
PRODUCCION
83,469,107
BOXES
22,313,632
6,336,980
ADMINISTRACION
2,064,254
22,017,779
VIAS
26,267,896
289,315
TALLERES
1,026,080
6,913,686
10,332,529
CASINO
25,438,926
7,823,014
5,993,007
PORTERIA #1
1,188,036
LAGUNA
66,075,336
97,360,812
18,627,369
142,001,940
20,747,489
37,636,540
TANQUE PRODUCCION #1
1,060,734
10
TANQUE PRODUCCION #2
1,956,567
11
BASCULAS
12
CARCAMO
13
DIQUE ACPM
14
POZO
38,033,280
15
TANQUE
1,474,690
16
17
17,524,200
19
RED HIDRAULICA
20
RED ELECTRICA
$
234,525,020
269,180,501
$
$
58,085,100
218,352,776
Inversin Ejecutada
20-May-14
213,389,653
213,389,653
20-Jun-14
347,970,982
561,360,634
20-Jul-14
248,815,081
810,175,715
20-Aug-14
388,903,362
1,199,079,077
20-Sep-14
389,507,752
1,588,586,828
20-Oct-14
401,580,846
1,990,167,674
20-Nov-14
871,721,620
2,861,889,294
EJECUTADO
$
$
Agosto
Septiembre
Octubre
Noviembre
256,913,594
-
Inversin Ejecutada
Acumulada
160,185,479
38,173,513
383,246,640
1,082,617,642
41,369,020
163,839,679
117,278,876
351,138,186
54,303,865
25,443,949
36,564,664
23,172,716
184,314,717
9,412,721
1,863,765
8,189,705
46,023,402
12,289,661
16,841,627
1,070,250
11,727,943
60,201,776
-$
3,056,546
11,309,566
477,207
8,894,502
56,879,676
4,199,107
2,865,863
616,546
19,992,347
58,663,789
63,430,585
223,499,779
8,869,551
566,659,186
1,060,734
1,956,567
$
$
26,454,600
13,635,611
33,322,412
21,563,134
12,151,837
2,556,293
$
$
449,030,506
9.16%
13.22%
19.57%
25.92%
32.48%
46.70%
23,427,386
54,792,215
1,322,246
1,322,246
292,147
7,347,874
122,279,040
4,499,434
293,940
65,368,751
28,678,640
43,563,436
152,721,127
2,120,540
42,215,818
1,511,162
79,169,933
2,049,417
3,095,459
36,130,994
80,363,205
402,789,895
% Ejecutado Acumulado
3.48%
-$
$
$
19,212,992
4,172,218
405,753,064
$
$
$
882,257,533
4,172,218
Porcentaje Ejecutado
Acumulado
44.04%
51.90%
40.87%
19.74%
67.66%
90.39%
34.71%
163.12%
2.00%
0.79%
41.56%
3.92%
16.34%
103.34%
144.82%
67.00%
122.26%
0.00%
0.61%
PROGRAMAD
CORTE A DICIEMBRE 5
CAPITULO
FRENTE
$
Mayo
Junio
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
5,409,770
802,880
CASINO
6,121,295
19,905,263
PORTERIA #1
929,606
LAGUNA
76,182,169
51,702,140
TANQUE PRODUCCION #1
829,995
10
TANQUE PRODUCCION #2
1,530,960
11
BASCULAS
12
CARCAMO
13
DIQUE ACPM
14
POZO
29,760,000
15
TANQUE
1,153,905
16
17
19
RED HIDRAULICA
20
RED ELECTRICA
Julio
3
14,575,406
65,312,290
$ 178,212,224
4,958,513
17,459,806
17,000,000
17,228,309
1,615,222
64,425,580
20,553,909
43,113,630
45,450,000
$ 170,855,068
$ 210,626,370
$ 302,751,434
Inversin Programada
20-May-14
158,578,998
20-Jun-14
471,569,538
158,578,998
630,148,536
20-Jul-14
501,147,346
1,131,295,882
20-Aug-14
173,336,386
1,304,632,268
20-Sep-14
516,866,679
1,821,498,948
20-Oct-14
870,131,956
2,691,630,903
20-Nov-14
1,002,661,630
3,694,185,490
5-Dec-14
601,447,405
4,295,525,852
PROGRAMADO
Agosto
Septiembre
Octubre
Noviembre
$ 300,000,000
$ 300,000,000
$ 300,000,000
400,000,000
1,558,099,920
95,906,578
$ 135,324,897
$ 135,324,897
135,324,897
541,299,588
64,425,580
64,425,580
340,971,433
212,541,907
233,095,816
16,030,624
88,973,097
62,923,933
64,425,580
64,425,580
22,243,274
22,243,274
22,243,274
15,730,983
15,730,983
5,435,408
8,518,872
8,518,872
$ 119,501,246
$ 100,000,000
32,956,995
Inversin Programada
Acumulada
7,589,266
-
25,556,616
347,385,555
26,156,699
26,156,700
53,143,394
82,516,616
82,516,616
166,564,192
32,956,995
32,956,995
98,870,985
8,429,276
8,429,276
11,242,695
11,242,695
118,323,630
$
$
35,151,119
105,453,358
59,081,710
59,081,710
118,163,419
32,866,922
32,866,922
65,733,844
89,913,073
179,826,147
171,468,954
$ 709,756,294
$ 896,213,427
% Programado Acumulado
2.59%
10.28%
18.46%
21.29%
29.72%
43.92%
60.28%
70.09%
35,151,119
89,913,073
$ 802,642,535
33,997,214
171,468,954
1,202,680,725
Porcentaje Programado
Acumulado
63.39%
80.00%
75.61%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
67.29%
75.00%
25.00%
25.00%
100.00%
100.00%
100.00%
100.00%
100.00%
25.00%
EJECUTAD
Corte 8 a Diciembre 5
CAPITULO
FRENTE
Mayo
Junio
PRODUCCION
83,469,107
BOXES
22,313,632
6,336,980
ADMINISTRACION
2,064,254
22,017,779
VIAS
26,267,896
289,315
TALLERES
1,026,080
6,913,686
10,332,529
CASINO
25,438,926
7,823,014
5,993,007
PORTERIA #1
1,188,036
LAGUNA
66,075,336
97,360,812
Julio
18,627,369
142,001,940
20,747,489
37,636,540
TANQUE PRODUCCION #1
1,060,734
10
TANQUE PRODUCCION #2
1,956,567
11
BASCULAS
12
CARCAMO
13
DIQUE ACPM
14
POZO
38,033,280
15
TANQUE
1,474,690
16
17
17,524,200
19
RED HIDRAULICA
20
RED ELECTRICA
$
234,525,020
$ 269,180,501
$
$
58,085,100
$ 218,352,776
Inversin Ejecutada
20-May-14
213,389,653
213,389,653
20-Jun-14
347,970,982
561,360,634
20-Jul-14
248,815,081
810,175,715
20-Aug-14
388,903,362
1,199,079,077
20-Sep-14
389,507,752
1,588,586,828
20-Oct-14
401,580,846
1,990,167,674
20-Nov-14
871,721,620
2,861,889,294
5-Dec-14
569,990,322
3,431,879,616
EJECUTADO
$
$
Agosto
Septiembre
Octubre
Noviembre
256,913,594
-
Inversin Ejecutada
Acumulada
160,185,479
38,173,513
624,207,608
1,323,578,609
41,369,020
163,839,679
227,071,686
460,930,996
54,303,865
25,443,949
36,564,664
63,177,622
224,319,622
9,412,721
1,863,765
37,833,698
12,289,661
16,841,627
1,070,250
11,649,054
60,122,887
-$
3,056,546
11,309,566
477,207
8,894,502
56,879,676
4,199,107
2,865,863
1,288,520
7,581,031
19,992,347
58,663,789
379,490,191
722,649,598
1,060,734
616,546 -$
63,430,585
1,956,567
$
$
26,454,600
13,635,611
33,322,412
21,563,134
12,151,837
2,556,293
$
$
449,030,506
9.16%
13.22%
19.57%
25.92%
32.48%
46.70%
56.00%
56,225,727
87,590,556
1,322,246
1,322,246
292,147
7,347,874
122,279,040
4,499,434
293,940
65,368,751
28,678,640
43,563,436
152,721,127
2,120,540
42,215,818
1,511,162
79,169,933
2,049,417
3,095,459
36,130,994
80,363,205
402,789,895
% Ejecutado Acumulado
3.48%
-$
$
$
19,212,992
4,172,218
405,753,064
1,452,247,854
4,172,218
Porcentaje Ejecutado
Acumulado
53.85%
68.12%
49.74%
16.23%
67.57%
90.39%
29.66%
208.03%
2.00%
0.79%
66.44%
3.92%
16.34%
103.34%
144.82%
67.00%
122.26%
0.00%
0.61%
PROGRAMA DE TRABAJO
VERSION Julio 16/14
MAVALLE 2014
MAYO
CAP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
DESCRIPCION
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
CASINO
PORTERIA #1
LAGUNA
TANQUE PRODUCCION #1
TANQUE PRODUCCION #2
BASCULAS
CARCAMO
DIQUE ACPM
POZO
TANQUE
RED AGUAS LLUVIAS PLUVIAL
RED SANITARIA ALCANTARILLADO
17
19 RED HIDRAULICA
20 RED ELECTRICA
VALOR CAPITULO
DURACION
MES
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2,458,099,920
676,624,485
450,979,063
233,095,816
88,973,097
62,923,934
25,556,617
347,385,555
53,143,394
247,549,848
131,827,980
33,717,105
44,970,781
118,323,630
105,453,358
118,163,419
65,733,844
9.00
8.00
9.00
2.00
6.00
5.00
4.00
4.00
3.00
4.00
4.00
4.00
4.00
3.00
4.00
2.00
2.00
$
$
179,826,147
685,875,814
2.00
4.00
TOTAL
$
6,128,223,807 ACUMULADO
JUNIO
MES 1
14,575,406
4,958,513
17,228,309
5,409,770
6,121,295
929,606
76,182,169
MES 2
65,312,290
17,459,806
1,615,222
20,553,909
802,880
19,905,263
51,702,140
829,995
1,530,960
45,450,000
29,760,000
1,153,905
170,855,068
170,855,068
210,626,370
381,481,438
JULIO
AGOSTO
MES 3
178,212,224
17,000,000
64,425,580
SEPTIEMBRE
OCTUBRE
MES 4
300,000,000
95,906,578
64,425,580
MES 5
300,000,000
135,324,897
64,425,580
MES 6
300,000,000
135,324,897
64,425,580
22,243,274
15,730,983
22,243,274
15,730,983
8,518,872
100,000,000
22,243,274
5,435,408
8,518,872
119,501,246
32,956,995
26,156,699
82,516,616
32,956,995
NOVIEMBRE
MES 7
400,000,000
135,324,897
64,425,580
212,541,907.22
16,030,624
DICIEMBRE
MES 8
7,589,266
26,156,700
82,516,616
32,956,995
8,429,276
11,242,695
8,429,276
11,242,695
43,113,630
59,081,710
32,866,922
302,751,434
684,232,872
35,151,119
59,081,710
35,151,119
89,913,073
32,866,922
89,913,073
-
709,756,294
1,393,989,166
896,213,427
2,290,202,593
802,642,535
3,092,845,127
33,997,214
171,468,954
171,468,954
1,202,680,725
4,295,525,852
191,140,925
4,486,666,778
ENERO
FEBRERO
MES 9
500,000,000
135,324,897
64,425,580
80,985,656
32,956,995
8,429,276
11,242,695
MES 10
400,000,000
45,582,050
8,429,276
11,242,695
-
171,468,954
171,468,954
1,004,834,054
5,491,500,831
636,722,975
6,128,223,806
TOTAL
2,458,099,920
676,624,485
450,979,063
233,095,816
88,973,097
62,923,933
25,556,616
347,385,555
53,143,394
247,549,848
131,827,980
33,717,105
44,970,781
118,323,630
105,453,358
118,163,419
65,733,844
179,826,147
685,875,814
6,128,223,806
22,485,391
CAPITULO
FRENTE
$
Mayo- Junio
Junio-Julio
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
5,409,770
802,880
CASINO
6,121,295
19,905,263
PORTERIA #1
929,606
LAGUNA
76,182,169
51,702,140
TANQUE PRODUCCION #1
829,995
10
TANQUE PRODUCCION #2
1,530,960
11
BASCULAS
12
CARCAMO
13
DIQUE ACPM
14
POZO
29,760,000
15
TANQUE
1,153,905
16
17
19
RED HIDRAULICA
20
RED ELECTRICA
$
210,626,370
Julio - Agosto
3
14,575,406
65,312,290
178,212,224
4,958,513
17,459,806
17,000,000
17,228,309
1,615,222
64,425,580
20,553,909
43,113,630
302,751,434
45,450,000
170,855,068
Inversin Programada
5-Jun-14
170,855,068
170,855,068
5-Jul-14
210,626,370
381,481,438
5-Aug-14
302,751,434
684,232,872
5-Sep-14
709,756,294
1,393,989,166
5-Oct-14
896,213,427
2,290,202,593
5-Nov-14
802,642,535
3,092,845,127
5-Dec-14
1,202,680,725
4,295,525,852
5-Jan-15
191,140,925
4,486,666,778
PROGRAMADO
Agosto-Septiembre
Septiembre - Octubre
Octubre - Noviembre
Noviembre - Diciembre
7
300,000,000
300,000,000
300,000,000
400,000,000
95,906,578
135,324,897
135,324,897
135,324,897
64,425,580
64,425,580
64,425,580
64,425,580
212,541,907
16,030,624
22,243,274
22,243,274
22,243,274
15,730,983
15,730,983
5,435,408
8,518,872
8,518,872
119,501,246
100,000,000
32,956,995
35,151,119
7,589,266
-
26,156,699
26,156,700
82,516,616
82,516,616
32,956,995
32,956,995
8,429,276
11,242,695
$
$
35,151,119
33,997,214
59,081,710
59,081,710
32,866,922
32,866,922
89,913,073
709,756,294
896,213,427
O
% Programado Acumulado
2.79%
6.22%
11.17%
22.75%
37.37%
50.47%
70.09%
73.21%
$
$
89,913,073
802,642,535
171,468,954
1,202,680,725
Diciembre - Enero
Inversin Programada
Acumulada
Porcentaje Programado
Acumulado
1,558,099,920
63.39%
541,299,588
80.00%
340,971,433
75.61%
233,095,816
100.00%
88,973,097
100.00%
62,923,933
100.00%
25,556,616
100.00%
347,385,555
100.00%
53,143,394
100.00%
166,564,192
67.29%
98,870,985
75.00%
16,858,553
50.00%
8,429,276
11,242,695
22,485,391
118,323,630
100.00%
105,453,358
100.00%
118,163,419
100.00%
65,733,844
100.00%
179,826,147
100.00%
342,937,907
50.00%
$
$
171,468,954
191,140,925
50.00%
CAPITULO
FRENTE
Mayo- Junio
Junio-Julio
Julio - Agosto
3
PRODUCCION
83,469,107
BOXES
22,313,632
6,336,980
ADMINISTRACION
2,064,254
22,017,779
VIAS
26,267,896
289,315
TALLERES
1,026,080
6,913,686
10,332,529
CASINO
25,438,926
7,823,014
5,993,007
PORTERIA #1
1,188,036
LAGUNA
66,075,336
97,360,812
18,627,369
142,001,940
20,747,489
37,636,540
TANQUE PRODUCCION #1
1,060,734
10
TANQUE PRODUCCION #2
1,956,567
11
BASCULAS
12
CARCAMO
13
DIQUE ACPM
14
POZO
38,033,280
15
TANQUE
1,474,690
16
17
17,524,200
19
RED HIDRAULICA
20
RED ELECTRICA
$
234,525,020
269,180,501
$
$
58,085,100
218,352,776
Inversin Ejecutada
5-Jun-14
269,180,501
269,180,501
5-Jul-14
218,352,776
487,533,277
5-Aug-14
234,525,020
722,058,297
5-Sep-14
449,030,506
1,171,088,803
5-Oct-14
402,789,895
1,573,878,698
5-Nov-14
405,753,064
1,979,631,762
5-Dec-14
1,452,247,854
3,431,879,616
5-Jan-15
880,438,733
4,312,318,349
EJECUTADO
Agosto-Septiembre
Septiembre - Octubre
Octubre - Noviembre
256,913,594
Noviembre - Diciembre
7
160,185,479
38,173,513
624,207,608
41,369,020
163,839,679
227,071,686
54,303,865
25,443,949
36,564,664
63,177,622
9,412,721
1,863,765
12,289,661
16,841,627
1,070,250
11,649,054
-$
3,056,546
11,309,566
477,207
8,894,502
4,199,107
2,865,863
19,992,347
58,663,789
$
$
616,546 -$
63,430,585
###
###
###
###
$
-
12,151,837
###
56,225,727
1,322,246
292,147
4,499,434
293,940
65,368,751
28,678,640
2,120,540
42,215,818
1,511,162
2,049,417
3,095,459
36,130,994
13,635,611
33,322,412
21,563,134
$
449,030,506
1,288,520
379,490,191
26,454,600
2,556,293
19,212,992
-$
402,789,895
O
% Ejecutado Acumulado
4.39%
7.96%
11.78%
19.11%
25.68%
32.30%
56.00%
70.37%
4,172,218
405,753,064
43,563,436
1,452,247,854
Diciembre - Enero
Inversin Ejecutada
Acumulada
Porcentaje Ejecutado
Acumulado
239,447,715
1,563,026,325
63.59%
37,835,471
498,766,467
73.71%
14,858,626
239,178,249
53.04%
119,903,426
157,737,123
67.67%
21,553,976
81,676,863
91.80%
13,480,755
70,360,431
111.82%
5,671,454
13,252,485
38,384,530
761,034,128
22,648,381
23,709,115
44.61%
41,252,053
43,208,620
17.45%
38,791,782
126,382,338
95.87%
1,322,246
$
$
$
$
5,993,542
51.86%
219.07%
3.92%
13,341,416
122,279,040
103.34%
29.67%
144.82%
152,721,127
12,953,721
92,123,654
77.96%
3,485,364
83,848,569
127.56%
264,177,936
268,350,154
880,438,733
4,312,318,349
0.00%
39.13%
CAPITULO
FRENTE
$
Mayo- Junio
Junio-Julio
PRODUCCION
BOXES
ADMINISTRACION
VIAS
TALLERES
5,409,770
802,880
CASINO
6,121,295
19,905,263
PORTERIA #1
929,606
LAGUNA
76,182,169
51,702,140
TANQUE PRODUCCION #1
829,995
10
TANQUE PRODUCCION #2
1,530,960
11
BASCULAS
12
CARCAMO
13
DIQUE ACPM
14
POZO
29,760,000
15
TANQUE
1,153,905
16
17
19
RED HIDRAULICA
20
RED ELECTRICA
$
210,626,370
Julio - Agosto
3
14,575,406
65,312,290
178,212,224
4,958,513
17,459,806
17,000,000
17,228,309
1,615,222
64,425,580
20,553,909
43,113,630
302,751,434
45,450,000
170,855,068
Inversin Programada
5-Jun-14
170,855,068
170,855,068
5-Jul-14
210,626,370
381,481,438
5-Aug-14
302,751,434
684,232,872
5-Sep-14
709,756,294
1,393,989,166
5-Oct-14
896,213,427
2,290,202,593
5-Nov-14
802,642,535
3,092,845,127
5-Dec-14
1,202,680,725
4,295,525,852
5-Jan-15
191,140,925
4,486,666,778
5-Mar-15
1,641,557,029
6,128,223,806
PROGRAMADO
Agosto-Septiembre
Septiembre - Octubre
Octubre - Noviembre
Noviembre - Diciembre
7
300,000,000
300,000,000
300,000,000
400,000,000
95,906,578
135,324,897
135,324,897
135,324,897
64,425,580
64,425,580
64,425,580
64,425,580
212,541,907
16,030,624
22,243,274
22,243,274
22,243,274
15,730,983
15,730,983
5,435,408
8,518,872
8,518,872
119,501,246
100,000,000
32,956,995
35,151,119
7,589,266
-
26,156,699
26,156,700
82,516,616
82,516,616
32,956,995
32,956,995
8,429,276
11,242,695
$
$
35,151,119
33,997,214
59,081,710
59,081,710
32,866,922
32,866,922
89,913,073
709,756,294
896,213,427
O
% Programado Acumulado
2.79%
6.22%
11.17%
22.75%
37.37%
50.47%
70.09%
73.21%
100.00%
$
$
89,913,073
802,642,535
171,468,954
1,202,680,725
Diciembre - Enero
Enero- Marzo
Inversin Programada
Acumulada
Porcentaje Programado
Acumulado
900,000,000
2,458,099,920
100.00%
135,324,897
676,624,485
100.00%
110,007,630
450,979,063
100.00%
233,095,816
100.00%
88,973,097
100.00%
62,923,933
100.00%
25,556,616
100.00%
347,385,555
100.00%
53,143,394
100.00%
80,985,656
247,549,848
100.00%
32,956,995
131,827,980
100.00%
16,858,553
33,717,105
100.00%
22,485,391
8,429,276
11,242,695
44,970,781
100.00%
118,323,630
100.00%
105,453,358
100.00%
118,163,419
100.00%
65,733,844
100.00%
179,826,147
100.00%
171,468,954
342,937,907
685,875,814
100.00%
191,140,925
1,641,557,029
6,128,223,806
CAPITULO
FRENTE
Mayo- Junio
Junio-Julio
Julio - Agosto
3
PRODUCCION
83,469,107
BOXES
22,313,632
6,336,980
ADMINISTRACION
2,064,254
22,017,779
VIAS
26,267,896
289,315
TALLERES
1,026,080
6,913,686
10,332,529
CASINO
25,438,926
7,823,014
5,993,007
PORTERIA #1
1,188,036
LAGUNA
66,075,336
97,360,812
18,627,369
142,001,940
20,747,489
37,636,540
TANQUE PRODUCCION #1
1,060,734
10
TANQUE PRODUCCION #2
1,956,567
11
BASCULAS
12
CARCAMO
13
DIQUE ACPM
14
POZO
38,033,280
15
TANQUE
1,474,690
16
17
17,524,200
19
RED HIDRAULICA
20
RED ELECTRICA
$
234,525,020
269,180,501
$
$
58,085,100
218,352,776
Inversin Ejecutada
5-Jun-14
269,180,501
269,180,501
5-Jul-14
218,352,776
487,533,277
5-Aug-14
234,525,020
722,058,297
5-Sep-14
449,030,506
1,171,088,803
5-Oct-14
402,789,895
1,573,878,698
5-Nov-14
405,753,064
1,979,631,762
5-Dec-14
1,452,247,854
3,431,879,616
5-Jan-15
880,438,733
4,312,318,349
5-Mar-15
1,358,844,697
5,671,163,046
EJECUTADO
Agosto-Septiembre
Septiembre - Octubre
Octubre - Noviembre
256,913,594
Noviembre - Diciembre
7
160,185,479
38,173,513
624,207,608
41,369,020
163,839,679
227,071,686
54,303,865
25,443,949
36,564,664
63,177,622
9,412,721
1,863,765
12,289,661
16,841,627
1,070,250
11,649,054
-$
3,056,546
11,309,566
477,207
8,894,502
4,199,107
2,865,863
19,992,347
58,663,789
$
$
616,546 -$
63,430,585
###
###
###
###
$
-
12,151,837
###
56,225,727
1,322,246
292,147
4,499,434
293,940
65,368,751
28,678,640
2,120,540
42,215,818
1,511,162
2,049,417
3,095,459
36,130,994
13,635,611
33,322,412
21,563,134
$
449,030,506
1,288,520
379,490,191
26,454,600
2,556,293
19,212,992
-$
402,789,895
O
% Ejecutado Acumulado
4.39%
7.96%
11.78%
19.11%
25.68%
32.30%
56.00%
70.37%
92.54%
4,172,218
405,753,064
43,563,436
1,452,247,854
Diciembre - Enero
Enero - Marzo
239,447,715
37,835,471
14,858,626
119,903,426
$
$
Porcentaje Ejecutado
Acumulado
695,762,490
2,258,788,815
91.89%
34,295,268
533,061,735
78.78%
114,926,804
354,105,053
78.52%
161,517,211
319,254,334
136.96%
21,553,976
38,989,293
120,666,156
135.62%
13,480,755
24,796,340
95,156,771
151.23%
5,671,454
4,739,073
17,991,558
38,384,530
30,192,855
791,226,983
22,648,381
8,925,510
32,634,625
41,252,053
60,956,954
104,165,574
42.08%
38,791,782
61,447,289
187,829,627
142.48%
46,249,943
47,572,190
141.09%
6,927,809
$
$
$
$
5,993,542
-
20,269,225
122,279,040
103.34%
144.82%
152,721,127
6,148,708
98,272,362
3,485,364
23,701,916
107,550,485
61.41%
12,953,721
-
70.40%
227.77%
$
$
Inversin Ejecutada
Acumulada
264,177,936
39,267,234
307,617,388
880,438,733
1,358,844,697
5,671,163,046
45.07%
83.17%
163.62%
0.00%
44.85%
CAPITULO
Porcentaje Programado
Acumulado
FRENTE
PRODUCCIN
100.00%
BOXES
100.00%
ADMINISTRACIN
100.00%
VAS
100.00%
TALLERES
100.00%
CASINO
100.00%
PORTERA #1
100.00%
LAGUNA
100.00%
TANQUE PRODUCCIN #1
100.00%
10
TANQUE PRODUCCIN #2
100.00%
11
BASCULAS
100.00%
12
CRCAMO
100.00%
13
DIQUE ACPM
100.00%
14
POZO
100.00%
15
TANQUE
100.00%
16
100.00%
17
100.00%
19
RED HIDRULICA
100.00%
20
RED ELCTRICA
100.00%
% Programado Acumulado
% Ejecutado Acumulado
5-Jun-14
2.79%
4.39%
5-Jul-14
6.22%
7.96%
5-Aug-14
11.17%
11.78%
5-Sep-14
22.75%
19.11%
5-Oct-14
37.37%
25.68%
5-Nov-14
50.47%
32.30%
5-Dec-14
70.09%
56.00%
5-Jan-15
73.21%
67.24%
5-Mar-15
100.00%
92.54%
Inversin Programada
5-Jun-14
170,855,068
###
5-Jul-14
210,626,370
5-Aug-14
302,751,434
684,232,872
5-Sep-14
709,756,294
1,393,989,166
5-Oct-14
896,213,427
2,290,202,593
5-Nov-14
802,642,535
3,092,845,127
5-Dec-14
1,202,680,725
4,295,525,852
5-Jan-15
191,140,925
4,486,666,778
5-Mar-15
1,641,557,029
6,128,223,806
381,481,438
Inversin Ejecutada
5-Jun-14
269,180,501
5-Jul-14
218,352,776
###
487,533,277
5-Aug-14
234,525,020
722,058,297
5-Sep-14
449,030,506
1,171,088,803
5-Oct-14
402,789,895
1,573,878,698
5-Nov-14
405,753,064
1,979,631,762
5-Dec-14
1,452,247,854
3,431,879,616
5-Jan-15
880,438,733
4,312,318,349
5-Mar-15
1,358,844,697
5,671,163,046
-8.11%
Atraso
78.78%
-21.22%
Atraso
78.52%
-21.48%
Atraso
136.96%
36.96%
Adelanto
135.62%
35.62%
Adelanto
151.23%
51.23%
Adelanto
70.40%
-29.60%
Atraso
227.77%
127.77%
Adelanto
61.41%
-38.59%
Atraso
42.08%
-57.92%
Atraso
142.48%
42.48%
Adelanto
141.09%
41.09%
Adelanto
45.07%
-54.93%
Atraso
103.34%
3.34%
Adelanto
144.82%
44.82%
Adelanto
83.17%
-16.83%
Atraso
163.62%
63.62%
Adelanto
0.00%
-100.00%
Atraso
44.85%
-55.15%
Atraso
VAS
91.89%
ADMINISTRACIN
CONDICIN
BOXES
DIFERENCIA
PRODUCCIN
Porcentaje Ejecutado
Acumulado
PORCENTAJE
PROYECTO
DIFERENCIA
CONDICIN
1.60%
Adelanto
1.73%
Adelanto
0.62%
Adelanto
-3.64%
Atraso
-11.69%
Atraso
80.00%
-18.17%
Atraso
70.00%
-14.09%
Atraso
60.00%
-5.97%
Atraso
50.00%
-7.46%
Atraso
100.00%
90.00%
40.00%
30.00%
20.00%
10.00%
9-Jul-14
29-Jun-14
19-Jun-14
9-Jun-14
30-May-14
20-May-14
0.00%
10.00%
9-Jul-14
29-Jun-14
19-Jun-14
9-Jun-14
30-May-14
20-May-14
0.00%
% Programado Acumulado
2.79%
6.22%
11.17%
$6,100,000,000
22.75%
37.37%
$5,100,000,000
50.47%
70.09%
$4,100,000,000
73.21%
100.00%
$3,100,000,000
$2,100,000,000
% Ejecutado Acumulado
4.39%
$1,100,000,000
7.96%
11.78%
9-Jul-14
29-Jun-14
19-Jun-14
9-Jun-14
32.30%
30-May-14
25.68%
20-May-14
$100,000,000
19.11%
56.00%
70.37%
92.54%
Inv
$4,100,000,000
$3,600,000,000
$3,100,000,000
$2,600,000,000
$2,100,000,000
$1,600,000,000
$1,100,000,000
$600,000,000
19-Jul-1
9-Jul-14
29-Jun-1
19-Jun-1
9-Jun-14
30-May-
20-May-
$100,000,000
$1,600,000,000
$1,100,000,000
$600,000,000
19-Jul-14
9-Jul-14
29-Jun-14
19-Jun-14
9-Jun-14
30-May-14
20-May-14
$100,000,000
RED ELCTRICA
RED HIDRULICA
RED SANITARIA ALCANTARILLADO
RED AGUAS LLUVIAS PLUVIAL
TANQUE
POZO
DIQUE ACPM
CRCAMO
BASCULAS
TANQUE PRODUCCIN #2
TANQUE PRODUCCIN #1
LAGUNA
PORTERA #1
CASINO
TALLERES
VAS
ADMINISTRACIN
BOXES
Porcentaje Programado
Acumulado
CAPITULO DE OBRA
% Programado
Acumulado
16-Mar-15
6-Mar-15
24-Feb-15
14-Feb-15
4-Feb-15
25-Jan-15
15-Jan-15
5-Jan-15
26-Dec-14
16-Dec-14
6-Dec-14
26-Nov-14
16-Nov-14
6-Nov-14
27-Oct-14
17-Oct-14
7-Oct-14
27-Sep-14
17-Sep-14
7-Sep-14
28-Aug-14
18-Aug-14
8-Aug-14
29-Jul-14
19-Jul-14
9-Jul-14
29-Jun-14
19-Jun-14
9-Jun-14
30-May-14
16-Mar-15
6-Mar-15
24-Feb-15
14-Feb-15
4-Feb-15
25-Jan-15
15-Jan-15
5-Jan-15
26-Dec-14
16-Dec-14
6-Dec-14
26-Nov-14
16-Nov-14
6-Nov-14
27-Oct-14
17-Oct-14
7-Oct-14
27-Sep-14
17-Sep-14
7-Sep-14
28-Aug-14
18-Aug-14
8-Aug-14
29-Jul-14
19-Jul-14
9-Jul-14
29-Jun-14
19-Jun-14
9-Jun-14
30-May-14
6-Mar-15
24-Feb-15
14-Feb-15
4-Feb-15
25-Jan-15
15-Jan-15
5-Jan-15
26-Dec-14
16-Dec-14
6-Dec-14
26-Nov-14
16-Nov-14
6-Nov-14
27-Oct-14
17-Oct-14
7-Oct-14
27-Sep-14
17-Sep-14
7-Sep-14
28-Aug-14
18-Aug-14
8-Aug-14
29-Jul-14
19-Jul-14
9-Jul-14
29-Jun-14
19-Jun-14
9-Jun-14
30-May-14
16-Mar-
6-Mar-1
24-Feb-
14-Feb-
4-Feb-1
25-Jan-1
15-Jan-1
5-Jan-15
26-Dec-
16-Dec-
6-Dec-1
26-Nov-
16-Nov-
6-Nov-1
27-Oct-
17-Oct-
7-Oct-1
27-Sep-
17-Sep-
7-Sep-1
28-Aug-
18-Aug-
8-Aug-1
29-Jul-1
19-Jul-1
9-Jul-14
29-Jun-1
19-Jun-1
9-Jun-14
16-Mar-15
6-Mar-15
24-Feb-15
14-Feb-15
4-Feb-15
25-Jan-15
15-Jan-15
5-Jan-15
26-Dec-14
16-Dec-14
6-Dec-14
26-Nov-14
16-Nov-14
6-Nov-14
27-Oct-14
17-Oct-14
7-Oct-14
27-Sep-14
17-Sep-14
7-Sep-14
28-Aug-14
18-Aug-14
8-Aug-14
29-Jul-14
19-Jul-14
9-Jul-14
29-Jun-14
19-Jun-14
9-Jun-14
RED ELCTRICA
RED HIDRULICA
ramado
do
16-Mar-15
6-Mar-15
24-Feb-15
14-Feb-15
4-Feb-15
25-Jan-15
15-Jan-15
5-Jan-15
16-Mar-15
6-Mar-15
24-Feb-15
14-Feb-15
4-Feb-15
25-Jan-15
15-Jan-15
5-Jan-15
utado Acumulado
16-Mar-15
6-Mar-15
24-Feb-15
14-Feb-15
4-Feb-15
25-Jan-15
15-Jan-15
5-Jan-15
Corte
16-Mar-
6-Mar-1
24-Feb-
14-Feb-
4-Feb-1
25-Jan-1
15-Jan-1
5-Jan-15
16-Mar-15
6-Mar-15
24-Feb-15
14-Feb-15
4-Feb-15
25-Jan-15
15-Jan-15
5-Jan-15
Descripcin
Valor Contractual.
Valor Inversin Total Programada a Marzo 5
Valor Inversin Total Ejecutada a Marzo 5
INTERPRE
El contrato finalmente se encuentra en le plazo limite de ejecucin (cumplidos 10 meses plazo contra
los componentes Hidrulico y Elctrico del proyecto. Dado que de estos 2 componentes se definieron
misma afectando el
A la fecha se refleja en el Informe el total de ejecucion del proyecto. Debe tenerse en cuenta que del
requerimientos realizados por la Interventoria y Supervision para el recibo a entera satisfaccion
Porcentaje sobre
inversin programada
100%
26.79%
22.17%
100%
82.78%
6,128,223,808
1,641,557,029
1,358,844,697
RESUMEN GENERAL
$
$
6,128,223,808
6,128,223,806
5,671,163,046
92.5%
Valor En Pesos
Porcentaje sobre
inversin programada
92.54%
100%
INTERPRETACIN
umplidos 10 meses plazo contractual) y a esta etapa refleja un atraso en ejecucin del 7,46%, el cual correspon
os 2 componentes se definieron sus particularidades fuera del tiempo de programacin por lo que se causo una
misma afectando el plazo de ejecucin.
al proyecto en un total de 1 mes (30 das) tiempo que en el que se considera que se alcanzara la meta del 100
OBSERVACIONES
ebe tenerse en cuenta que del total ejecuctado aun existen algunas retenciones de pago por calidad de obra qu
cibo a entera satisfaccion
s de pago por calidad de obra que se liberaran una vez el contratista cumpla con los