LM2X Installation

GE ENERGY

IWP22

Off-Site Monitoring Equipment Installation


GENERAL GUIDELINES

Purpose/Scope
This work package encompasses all

requirements for installing the Off-Site


Monitoring System in the control cabinet.

Precautions
Avoid damaging cabinets, switches, indicators,
connectors, fittings, and paint or protective coatings.
When transporting electronic equipment. Avoid
subjecting equipment to excessive shock and static
electricity.

Special Tooling - Equipment


None
References
Wiring Diagram ECR Computer Station
Suggested Manpower and Duration
One Electrician
Duration Two Days

TASK START DATE

Contractor Representative

TASK COMPLETION DATE

Customer Representative

GE Representative

Printed Name:

Printed Name:

Printed Name:

Printed Title:

Printed Title:

Printed Title:

GE Representative
Signature/Date:

Rev 0

Signature/Date:

Signature/Date:

Page 1 of 2

LM2X Installation
GE ENERGY

Off-Site Monitoring Equipment Installation

TASKS
1.

Install off-site monitor.

2.

Connect communications cable to off-site monitor.

Rev 0

IWP22

INITIALS

DATE

Page 2 of 2