Sie sind auf Seite 1von 17

ANEXO No.

04
PRESUPUESTO DE OBRA
PRESUPUESTO DE OBRA
MUNICIPIO MOSQUERA I FASE I AO 2025
PLANTA DE TRATAMIENTO DE AGUA RESIDUAL (AIREACIN EXTENDIDA)
TEM
1.1
1.1.1
1,1,2
1,1,3
1,1,4
1,1,5
1,1,6
1,1,7

DESCRIPCION DE ITEMS

VALOR
UNITARIO
1. ACTIVIDADES PRELIMINARES

PRELIMINARES
Localizacin y Replanteo ( Incluye
comisin de topografa)
Cerramiento con polisombra
Suministro e instalacin de vallas
de informacin
Drenaje de laguna
Retiro y disposicin de lodos
Sub-base compactada al 95% Norma Invias
Campamento 18 M2

UNIDAD

CANTIDAD

31,572.00

8,649.00

273,066,228.00

1,195.00

8,464.00

10,114,480.00

UN

1.00

2,500,000.00

DIA
M

12.00
1,319.00

2,500,000.00
314,689.00
38,182.00

$
$

3,776,268.00
50,362,058.00

14,375.00

122,928.00

1,767,090,000.00

UN

5.00

8,226,805.00

2,115,135,839.00

1,645,361.00

SUBTOTAL

VALOR TOTAL

2. TRATAMIENTO PRELIMINAR
2.1
2,1,1
2,1,2
2,1,3
2.2
2,2,1
2.3
2,3,1
2,3,2
2,3,3
2,3,4
2,3,5
2.4
2,4,1
2.5
2,5,1
2,5,1,1
2,5,1,2
2,5,1,3
2,5,2
2,5,2,1
2,5,2,2
2,5,2,3

EXCAVACIONES Y RETIROS
Descapote y limpieza
Excavacin hasta 3,0 m de
profundidad
Retiro y disposicin de material
sobrante
RELLENO
Relleno de material proveniente de
la excavacin
CONCRETOS
Concreto para solado (10,4 Mpa)
e= 0,10 m
Concreto 28 Mpa
impermeabilizado para Placa
Concreto 28 Mpa
impermeabilizado para Muros
Concreto 28 Mpa
impermeabilizado para Placa
superior
Concreto 28 Mpa para columnas
ACERO
Suministro figurado y amarrado de
acero de refuerzo f"y = 60.000 psi
SUMINISTRO E INSTALACIN
DE TUBERAS Y ACCESORIOS
DE INTERCONEXION
RELLENO
Material Granular (conformado por
gravas, arenas, tamao mximo de
2 pulgadas)
Recebo (% de finos entre el 14% al
25% )
Materia proveniente de la
excavacin
DESARENADOR A LOS
TANQUES DE AIRECION
Pasa muro 12'' PVC UNIN Z
RDE 41 L=0.20m
Tubera 12" PVC RDE 41
Codo 12" X 90 PVC-P

112.00

4,635.00

519,120.00

23.04

17,474.00

402,601.00

18.43

17,308.00

318,986.00

4.61

15,227.00

70,196.00

5.14

351,163.00

1,804,978.00

35.60

686,582.00

24,442,319.00

36.39

725,542.00

26,402,473.00

6.50

725,542.00

4,716,023.00

9.36

725,542.00

6,791,073.00

KG

8,785.00

3,380.00

29,693,300.00

2.95

92,838.00

273,872.00

14.21

50,110.00

712,063.00

20.62

15,227.00

313,981.00

UN

3.00

80,640.00

241,920.00

M
UN

69.78
14.00

112,387.00

$
$

7,842,365.00
21,251,132.00

1,517,938.00
Pasa muro 12'' PVC UNIN Z
RDE 41 L=0.30 m
DESARENADOR AL
CALASIFICADOR DE ARENA

UN

3.00

90,829.00

272,487.00

UN

1.00

454,190.00

454,190.00

2,5,3,2
2,5,3,3

Pasamuro 12'' Acero ELxEB


L=0.30m z A 0.14 EL
Tubera 6" Acero
Niple 6" BxB Acero L= 0,50 m

M
UN

2.22
2.00

343,925.00
766,939.00

$
$

763,514.00
1,533,878.00

2,5,3,4

Vlvula 6" Mariposa

UN

1.00

4,373,416.00

$
$
$

206,778.00
1,353,107.00
134,753,772.00

348,784.00

1,590,134.00

1,260,022.00

277,131.00

2,644,257.00

7,104,411.00

181,032.00

1,681,842.00

7,889,475.00

5,550,332.00

588,235.00

3,461,121.00

817,151.00

3,006,120.00

567,498.00

1,697,996.00

$
$
$
$

73,419,540.00
10,492,391.00
4,645,524.00
127,222,996.00

2,5,2,4
2,5,3
2,5,3,1

4,373,416.00

CLASIFICADORE DE ARENAS A
LA EBAR
2,5,4,1 Codo 6" X 90 PVC- S
UN
3.00
68,926.00
2,5,4,2 Tubera = 6" PVC-S
M
44.16
30,641.00
SUBTOTAL
3. SISTEMA DE AIREACIN DIFUSA
CASETA DE SOPLADORES
3.1
EXCAVACIONES
3,1,1
3,1,1,1 Descapote y limpieza
M
75.25
4,635.00
Excavacin hasta 3,0 m de
3,1,1,2
M
91.00
17,474.00
profundidad
Retiro y disposicin de material
3,1,1,3
M
72.80
17,308.00
sobrante
RELLENO
3,1,2
Relleno de material proveniente de
3,1,2,1
M
18.20
15,227.00
la excavacin
CONCRETOS
3,1,3
Concreto para solado (10,4 Mpa)
3,1,3,1
M
7.53
351,163.00
e= 0,10 m
Concreto de 24,5 Mpa para placa
3,1,3,2
M
14.05
505,652.00
de piso e=0.20
Concreto de 24,5 Mpa para placa
3,1,3,3
M
0.31
583,973.00
de soporte de sopladores e=0.05
Concreto de 24,5 Mpa para
3,1,3,4
M
2.88
583,973.00
columnas de cimentacin
Concreto para cubierta 24,5 Mpa
3,1,3,5
M
13.51
583,973.00
impermeabilizado e=0.14
ACERO
3,1,4
Suministro figurado y amarrado de
3,1,4,1
KG
1,642.11
3,380.00
acero de refuerzo f"y = 60.000 psi
MUROS Y PISOS
3,1,5
Suministro e instalacin de Muro
3,1,5,1
M
16.40
35,868.00
en Mampostera en ladrillo comn
Suministro e instalacin de Piso en
3,1,5,2
M
63.43
54,566.00
Tabln de gress de 0,3x0,3
Paete liso para muros y placas
3,1,5,3
M
91.65
8,916.00
1:6
3,1,5,4 Estuco y vinilo 3 manos
M
91.65
32,800.00
SUMINISTRO E INSTALACIN
3,1,6
CARPINTERA METLICA
Ventana en aluminio de 1.50 x 0.60
3,1,6,1
UN
3.00
189,166.00
m
2,5,4

3,1,6,2

Puerta en aluminio de 3.0 x 2.50 m

SUMINISTRO E INSTALACIN
DE TUBERAS Y ACCESORIOS
CASETA DE SOPLADORES A
3,2,1
TUBERA DE 8" HACIA TANQUE
DE AIREACION
3,2,1,1 Tubera 8" Acero
3,2,1,2 Codo 8" X 90 HD BXB
3,2,1,3 Codo 8" X 45 HD BXB
SUBTOTAL

UN

1.00

M
UN
UN

189.96
13.00
6.00

1,697,996.00

3.2

4. TANQUES DE AIREACIN
4.1

EXCAVACIONES

386,500.00
807,107.00
774,254.00

4,1,1

4,6,1

Descapote y limpieza
Excavacin hasta 3,0 m de
profundidad
Retiro y disposicin de material
sobrante
RELLENO
Sub-base compactada al 95%
Mejoramiento en rajon apisonado
e=0.20 m
Pilotes en madera L= 10 m 25
cm
CONCRETOS
Concreto para solado (10,4 Mpa)
e= 0,10 m
Concreto impermeabilizado (28
Mpa) para Placas
Concreto impermeabilizado (28
Mpa) para Muros
Concreto impermeabilizado (28
Mpa) para Vigas Aereas
Juntas de Dilatacin
ACERO
Suministro figurado y amarrado de
acero de refuerzo f"y = 60.000 psi
SUMINISTRO E INSTALACIN
DE TUBERAS Y ACCESORIOS
DE INTERCONEXIN
EXCAVACIONES Y RETIROS
Excavacin hasta 3,0 m de
profundidad
Retiro y disposicin de material
sobrante
RELLENO
Material Granular (conformado por
gravas, arenas, tamao mximo de
2 pulgadas)
Recebo (% de finos entre el 14% al
25% )
Materia proveniente de la
excavacin
ENTIBADO
Entibado en Madera
TANQUE A SEDIMENTADORES
Pasamuro Salida TA AC ELXEL L=
0.6 m 24"
Tubera 24" GRP
Codo 24" x 90 GRP
SUMINISTRO E INSTALACIN
DE TUBERAS Y ACCESORIOS
(AIRE) EMPATA CON SALIDA DE
CASETA DE SOPLADORES
Tubo 12" Acero

4,6,2

Codo de 45 x 12"HD BXB

UN

6.00

4,6,3

Codo de 90 x 12" HD BXB

UN

13.00

4,6,4

TEE 12" x 6" Acero

UN

12.00

4,6,5
Codo de 90 x 6" Acero
4,6,6
Tubo 6" Acero
4,6,7
TEE de 6" x 6" x 4" Acero
4,6,8
Reduccin de 6" x 4" Acero
4,6,9
Codo de 90 x 4" Acero
4,6,10
Tubo 4" RDE 21
SUBTOTAL

UN
M
UN
UN
UN
UN

24.00
176.40
48.00
12.00
12.00
930.00

4,1,2
4,1,3
4.2
4,2,1
4,2,2
4,2,3
4.3
4,3,1
4,3,2
4,3,3
5,3,4
4,3,4
4.4
4,4,1
4.5
4,5,1
4,5,1,1
4,5,1,2
4,5,2
4,5,2,1
4,5,2,2
4,5,2,3
4,5,3
4,5,3,1
4,5,4
4,5,4,1
4,5,4,2
4,5,4,3
4.6

3,500.00

4,635.00

16,222,500.00

2,535.00

17,474.00

44,296,590.00

2,535.00

17,308.00

43,875,780.00

636.23

68,500.00

43,581,755.00

2,270.96

57,869.00

131,418,184.00

UN

1,461.00

102,578.00

149,866,458.00

244.36

351,163.00

85,810,191.00

940.13

686,582.00

645,476,336.00

774.00

725,542.00

561,569,508.00

99.39

725,542.00

72,111,619.00

367.81

38,768.00

14,259,258.00

KG

19,9487.2

3,380.00

674,266,736.00

218.92

17,474.00

3,825,408.00

101.02

17,308.00

1,748,454.00

10.00

92,838.00

928,380.00

66.66

50,110.00

3,340,333.00

117.90

15,227.00

1,795,263.00

179.20

19,617.00

3,515,366.00

UN

3.00

3,413,859.00

M
UN

116.16
7.00

1,137,953.00
268,477.00
813,482.00

$
$

31,186,288.00
5,694,374.00

305.05

343,925.00

104,914,321.00

9,234,732.00

19,562,400.00

25,596,660.00

$
$
$
$
$
$
$

10,939,680.00
22,377,575.00
26,721,024.00
3,526,320.00
3,146,796.00
31,186,620.00
2,795,408,768.00

5. SEDIMENTADOR

1,539,122.00
1,504,800.00
2,133,055.00
455,820.00
126,857.00
556,688.00
293,860.00
262,233.00
33,534.00

5.1
5,1,1

EXCAVACIONES
Descapote y limpieza
Excavacin hasta 3,0 m de
profundidad
Retiro y disposicin de material
sobrante
CIMENTACION
Sub-base compactada al 95%
Rajon tamao medio 35 cm,
minimo 14 cm
Pilotes en madera L= 10 m 25
cm
CONCRETOS
Concreto para solado (10,4 Mpa)
e= 0,10 m
Concreto impermeabilizado (28
Mpa) para Placas
Concreto impermeabilizado (28
Mpa) para Muros
Juntas de Dilatacin
ACERO
Suministro figurado y amarrado de
acero de refuerzo f"y = 60.000 psi
SUMINISTRO E INSTALACIN
DE TUBERAS Y ACCESORIOS
DE INTERCONEXION
EXCAVACIONES Y RETIROS
Excavacin hasta 3,0 m de
profundidad
RELLENO
Material Granular (conformado por
gravas, arenas, tamao mximo de
2 pulgadas)
Recebo (% de finos entre el 14% al
25% )
Materia proveniente de la
excavacin
ENTIBADO
Entibado en Madera
SEDIMENTADOR A TANQUE DE
CLORACION Y EMPALME CON
LA
RED Y PVC
EBAR
Pasamuro
RDE 41 union Z

508.30

4,635.00

2,355,971.00

4,486.28

17,474.00

78,393,257.00

4,486.28

17,308.00

77,648,534.00

3,805.60

68,500.00

260,683,600.00

1,143.29

57,869.00

66,161,049.00

UN

801.00

102,578.00

82,164,978.00

203.32

351,163.00

71,398,461.00

477.00

686,582.00

327,499,614.00

381.75

725,542.00

276,975,659.00

207.59

38,768.00

8,047,849.00

KG

94,462.50

3,380.00

319,283,250.00

31.05

17,474.00

542,568.00

8.28

92,838.00

768,699.00

44.97

50,110.00

2,253,447.00

59.24

15,227.00

902,047.00

18.75

19,617.00

367,819.00

UN

3.00

106,144.00

318,432.00

5,5,4,2
5,5,4,3

18'' L=0.20m
Tubera PVC-P RDE 41. 18"
Codo 45 PVC-P 18"

M
UN

9.00
6.00

236,428.00
282,556.00

$
$

2,127,852.00
1,695,336.00

5,5,4,4

TEE PVC-P 18"

UN

2.00

2,532,174.00

5,5,4,5
5,5,4,6

Tubera PVC-P RDE 41 20"


Tapon PVC-P 18"

M
UN

25.35
1.00

$
$

7,458,274.00
376,087.00

5,5,4,7

TEE PVC-P 20"

UN

1.00

1,100,698.00

5,5,4,8

Tubera
PVC-S
12" 41 Union Z
Pasamuro
PVC
RDE

101.42

1,100,698.00
76,200.00

7,728,204.00

5,5,4,9

24'' L=0.20m

UN

7.00

146,740.00

1,027,180.00

5,5,4,10 Codo 90 PVC-P 24"

UN

2.00

15,711,616.00

5,5,4,11 Niple 12" PVC -S BXB L=5,0m

UN

6.00

259,386.00

5,5,4,12 Vlvula mariposa 12"


5,5,4,13 Tubera de 24'' RDE 41
SUBTOTAL

UN

3.00

19,121,550.00

36.71

$
$

15,374,038.00
1,650,277,629.00

$
$

1,024,335.00
7,339,080.00

5,1,2
5,1,5
5.2
5,2,1
5,2,2
5,2,3
5.3
5,3,1
5,3,2
5,3,3
5,3,4
5.4
5,4,1
5.5
5,5,1
5,5,1,1
5,5,2
5,5,2,1
5,5,2,2
5,5,2,3
5,5,3
5,5,3,1
5,5,4
5,5,4,1

1,266,087.00
294,212.00
376,087.00

7,855,808.00
43,231.00
6,373,850.00
418,797.00

6. TANQUE DE CLORACIN
6.1
6,1,1
6,1,2

EXCAVACIONES
Descapote y limpieza
Excavacin hasta 3,0 m de

M
M

221.00
420.00

4,635.00
17,474.00

6,5,4,1

profundidad
RELLENO
Relleno de material proveniente de
la excavacin
Mejoramiento en Rajon apisonado
e=0.50 m
Sello de Nivelacin en recebo
e=0.14m
Geomalla tipo TRIAX
Recebo comn 95% P.M en capas
0.20 m
Acabado en Sub-base granular
e=0.40 m
CONCRETOS
Concreto para solado (10,4 Mpa)
e= 0,10 m
Concreto impermeabilizado (28
Mpa) para Placas
Concreto impermeabilizado (28
Mpa) para Muros
Concreto impermeabilizado (28
Mpa) para Tabiques
Juntas de Dilatacin
ACERO
Suministro figurado y amarrado de
acero de refuerzo f"y = 60.000 psi
SUMINISTRO E INSTALACION
DE TUBERIAS Y ACCESORIOS
DE INTERCONEXION
EXCAVACIONES Y RETIROS
Excavacin hasta 3,0 m de
profundidad
Retiro y disposicin de material
sobrante
RELLENO
Material Granular (conformado por
gravas, arenas, tamao mximo de
2 pulgadas)
Recebo (% de finos entre el 14% al
25% )
Materia proveniente de la
excavacin
ENTIBADO
Entibado en Madera
CANALETA PARSHALL A
CABEZAL DESCARGA
Tubera PVC-S 12"

6,5,4,2

Codo 90 PVC - S 12"

6.2
6,2,1
6,2,2
6,2,3
6,2,4
6,2,5
6,2,6
6.3
6,3,1
6,3,2
6,3,3
6,3,4
6,3,5
6.4
6,4,1
6.5
6,5,1
6,5,1,1
6,5,1,2
6,5,2
6,5,2,1
6,5,2,2
6,5,2,3
6,5,3
6,5,3,1
6,5,4

6,5,5
6,5,5,1

CANAL DE EXCESOS A
CABEZAL DE DESCARGA
Tubera PVC-S 24"

6,5,5,2

Codo 90 PVC - S 24"


SUBTOTAL

900.00

15,227.00

13,704,300.00

276.25

57,869.00

15,986,311.00

276.25

7,020.00

1,939,275.00

276.25

30,703.00

8,481,704.00

552.50

50,110.00

27,685,775.00

110.50

68,500.00

7,569,250.00

22.10

351,163.00

7,760,702.00

44.20

686,582.00

30,346,924.00

37.15

725,542.00

26,953,885.00

32.66

725,542.00

23,696,202.00

82.10

38,768.00

3,182,853.00

KG

10,261.51

3,380.00

34,683,904.00

317.29

17,474.00

5,544,325.00

168.17

17,308.00

2,910,686.00

17.44

92,838.00

1,619,095.00

105.55

50,110.00

5,289,111.00

149.12

15,227.00

2,270,650.00

273.83

19,617.00

5,371,723.00

96.00

76,200.00

7,315,200.00

UN

1.00

1,517,938.00

96.00

23,756,256.00

UN

1.00

1,146,023.00

267,095,507.00

1,517,938.00

247,461.00
1,146,023.00

7. BOMBEO DE LODOS
7.1
7,1,1
7,1,2
7,1,3
7.2
7,2,1

EXCAVACIONES
Descapote y limpieza
Excavacin hasta 3,0 m de
profundidad
Excavacin desde 3,0 m hasta
5,00 m de profundidad
RELLENO
Sub-base compactada al 95% del
producto modificado en capas
mximas de 20 cm

142.80

4,635.00

661,878.00

321.75

17,474.00

5,622,260.00

160.88

19,406.00

3,122,037.00

294.81

68,500.00

20,194,485.00

7,2,2
7,2,3
7.3
7,3,1
7,3,2
7,3,3
7,3,4
7,3,6
7.4
7,4,1
7.5
7,5,1
7,5,2
7,5,4
7.6
7,6,1
7,6,2
7,6,3

Entibado en Madera
Relleno de material proveniente de
la excavacin
CONCRETOS
Concreto para solado (10,4 Mpa)
e= 0,10 m
Concreto impermeabilizado (28
Mpa) para Placas
Concreto impermeabilizado (28
Mpa) para Muros
Concreto impermeabilizado (28
Mpa) para placa superior o cubierta
Concreto ciclpeo de relleno
ACERO
Suministro figurado y amarrado de
acero de refuerzo f"y = 60.000 psi
SUMINISTRO E INSTALACIN
CARPINTERA METLICA
Diferencial ,manual de monorriel de
1/2 tonelada
Riel de 6" para diferencial de 1/2
tonelada
Reja metlica de 2" x 1/4" de 1 x
0,75 m (Hierro galvanizado)
SUMINISTRO E INSTALACIN
DE TUBERAS Y ACCESORIOS
Tubera 6" PVC RDE 21 con
reduccin a 4", bridas de 125 lbs
L= 2,9 m
Codo 6" X 90 PVC RDE 21
BXB
Pasamuro 6" Acero al carbn
BXB L= 0,41 m

395.43

19,617.00

7,757,150.00

187.81

15,227.00

2,859,783.00

14.50

351,163.00

5,091,864.00

26.81

686,582.00

18,407,263.00

77.92

725,542.00

56,534,233.00

8.47

725,542.00

6,145,341.00

13.80

324,759.00

4,481,674.00

KG

11,321.25

3,380.00

38,265,825.00

UN

3.00

470,703.00

1,412,109.00

UN

3.00

368,206.00

1,104,618.00

UN

3.00

21,990,000.00

UN

9.00

524,539.00

4,720,851.00

UN

9.00

219,443.00

1,974,987.00

UN

9.00

441,720.00

3,975,480.00

18,622,521.00

16,933,680.00

1,360,962.00

7,330,000.00

7,6,4

Vlvula cheque HF 6"

UN

9.00

7,6,5

Vlvula compuerta HF 6"

UN

9.00

7,6,6

Unin de montaje HD 6"


Niple 6" PVC RDE 21 BXB L=
0,23 m
Tee 8" X 6" PVC REDE 21 BXB
Niple 8" PVC RDE 21 BXB L=
0,40 m
Brida ciega 8"
Tubera 4" PVC RDE 21 con
reduccin a 3", bridas de 125 lbas
L= 2 m
Codo 4" X 90 PVC RDE 21
BXB
Pasamuro 4" Acero al carbn
BXB L= 0,45 m

UN

9.00

1,881,520.00
151,218.00

UN

18.00

140,984.00

2,537,712.00

UN

9.00

827,394.00

7,446,546.00

UN

6.00

249,094.00

1,494,564.00

UN

3.00

203,955.00

611,865.00

UN

6.00

176,369.00

1,058,214.00

UN

6.00

170,912.00

1,025,472.00

UN

6.00

199,138.00

1,194,828.00

7,6,14

Vlvula cheque HF 4"

UN

6.00

6,626,568.00

7,6,14

Vlvula compuerta HF 4"

UN

6.00

6,048,240.00

7,6,16

Unin de montaje HD 4"


Niple 4" PVC RDE 21 BXB L=
0,17 m
Tee 4" X 4" PVC RDE 21 BXB
Niple 4" PVC RDE 21 BXB L=
0,53 m
Brida ciega 4"
SUMINISTRO E INSTALACION
DE TUBERIAS DE
INTERCONEXION
EXCAVACIONES Y RETIROS

UN

6.00

1,008,040.00
100,868.00

605,208.00

UN

12.00

99,045.00

1,188,540.00

UN

6.00

247,847.00

1,487,082.00

UN

3.00

107,382.00

322,146.00

UN

3.00

93,859.00

281,577.00

7,6,7
7,6,8
7,6,9
7,6,10
7,6,11
7,6,12
7,6,13

7,6,17
7,6,18
7,6,19
7,6,20
7.7
7,7,1

2,069,169.00

1,104,428.00

7,7,1,1

Excavacin hasta 3,0 m de


profundidad
Retiro y disposicin de material
sobrante
RELLENO
Recebo (% de finos entre el 14% al
25% )
Materia proveniente de la
excavacin
EBAR AL TANQUE DE
AIREACION
Pasamuro PVC RDE 21 UNIN Z

150.71

17,474.00

2,633,507.00

95.90

17,308.00

1,659,837.00

77.58

50,110.00

3,887,534.00

54.81

15,227.00

834,592.00

10'' L=0.25m
Tubera PVC-P RDE 21 10" -

UN

3.00

94,440.00

283,320.00

279.44

145,573.00

40,678,919.00

7,7,1,3

Codo 90 PVC - P 10"


Pasamuro PVC RDE 21 UNIN Z

UN

7.00

7,840,483.00

7,7,1,4

10'' L=0.30m

UN

3.00

101,182.00

303,546.00

7,7,2

EBAR A LA DESHIDRATADORA
DE
LODOSPVC RDE 21 UNIN Z
Pasamuro
UN

3.00

65,116.00

195,348.00

141.43

33,534.00

4,742,714.00

UN

3.00

65,008.00

195,024.00

UN

2.00

170,912.00

$
$

341,824.00
336,764,211.00

4,635.00

1,251,450.00

17,474.00

2,096,880.00

17,306.00

1,730,600.00

351,163.00

1,826,048.00

505,652.00

16,383,125.00

505,652.00

5,395,307.00

505,652.00

1,820,347.00

583,973.00

4,146,208.00

583,973.00

2,335,892.00

583,973.00

578,133.00

102,578.00

3,077,340.00

3,380.00

8,368,204.00

85,000.00

2,167,500.00

35,868.00

3,084,648.00

8,916.00

766,776.00

32,800.00

2,820,800.00

77,460.00

6,584,100.00

7,7,1,2
7,7,2
7,7,2,1
7,7,2,2
7,7,1
7,7,1,1
7,7,1,2

7,7,2,1
7,7,2,2
7,7,2,3

4'' L=0.25m
Tubera
PVC-P
UP RDE
21 4"Z
Pasamuro
PVC RDE
21 UNIN

4' L=0.20m
7,7,2,4 Codo 90 PVC - P 4"
SUBTOTAL
8.1
8,1,1
8,1,1,1
8,1,1,2
8,1,1,3
8,1,2
8,1,2,1
8,1,2,2
8,1,2,3
8,1,2,4
8,1,2,5
8,1,2,6
8,1,2,7
8,1,2,8
8,1,3
8,1,3,1
8,1,4
8,1,4,1
8,1,5
8,1,5,1
8,1,5,2
8,1,5,3
8,1,5,4

1,120,069.00

8. SISTEMA DE DESHIDRATACIN
CASETA PARA
DESHIDRATADORA DE LODOS
EXCAVACIONES
Descapote y limpieza
M
270.00
Excavacin hasta 3,0 m de
M
120.00
profundidad
Retiro y disposicin de material
M
100.00
sobrante
CONCRETOS
Concreto para solado (10,4 Mpa)
M
5.20
e= 0,05 m
Concreto de 3500 psi para placa
M
32.40
de zapatas
Concreto de 3500 psi para placa
M
10.67
de piso e=0.20
Concreto de 3500 psi para
M
3.60
Andenes
Concreto de 3500 psi para
M
7.10
columnas de cimentacin
Concreto de 3500 psi para Vigas
M
4.00
de cimentacin
Concreto de 3500 psi para Muros
M
0.99
internos del tanque
Pilotes en madera L=10 m D=25
Und
30.00
cm
ACERO
Suministro figurado y amarrado de
KG
2,475.80
acero de refuerzo f"y = 60.000 psi
ESTRUCTURA METALICA
Cercha Metlica para cubierta
M
25.50
CUBIERTA, MUROS Y
ACABADOS
Mampostera en ladrillo estructural
M
86.00
Paete liso para muros y placas
M
86.00
1:6
Estuco y vinilo 3 manos
M
86.00
Cubierta sencilla Modular 333 (cal
M
85.00
24) o similar

8,1,6,1

SUMINISTRO E INSTALACIN
DE TUBERA Y ACCESORIOS DE
AIRE
Niple Acero 8" BxB L=0,27 m.

UN

3.00

8,1,6,2

Vlvula Mariposa 8"

UN

3.00

8,1,6,3

Reduccin 10"X8" BXB HD

UN

3.00

8,1,6,4

Tee BXB HD 12"x12"

UN

5.00

8,1,6,5
8,1,6,6

Niple Acero 12" BxB L=0,92 m.


Niple Acero 12" BxB L=0,39 m

UN
UN

1.00
5.00

8,1,6,7

Vlvula Mariposa 12"

UN

4.00

UN
UN
UN
UN
UN
UN
UN

2.00
1.00
18.00
18.00
105.00
75.00
2.00

8,1,6

8,1,6,8 Niple Acero BXB 12" X 0.66 m


8,1,6,9 Brida Ciega 12", Acero
8,1,6,10 Tornillo en Acero 7/8"x3"
8,1,6,11 Tornillo en Acero 7/"x8"
8,1,6,12 Tornillo en Acero 1"x4"
8,1,6,13 Tornillo en Acero 1"x10"
8,1,6,14 Union Flexible 12"
SUBTOTAL

244,668.00
4,794,560.00
565,686.00
2,594,054.00
899,295.00
732,274.00
6,373,850.00
817,360.00
491,428.00
15,125.00
39,868.00
32,731.00
28,111.00
459,960.00

734,004.00

14,383,680.00

1,697,058.00

12,970,270.00

$
$

899,295.00
3,661,370.00

25,495,400.00

$
$
$
$
$
$
$
$

1,634,720.00
491,428.00
272,250.00
717,624.00
3,436,755.00
2,108,325.00
919,920.00
133,855,457.00

9, CASETA DE CLORACIN
9.1
9,1,1
9,1,2
9,1,3
9.2
9,2,1
9.3
9,3,1
9,3,2
9,3,3
9,3,4
9,3,5
9.4
9,4,1
9.5
9,5,1
9,5,2
9,5,3
9,5,4
9.6
9,6,1
9,6,2

EXCAVACIONES
Descapote y limpieza
Excavacin hasta 3,0 m de
profundidad
Retiro y disposicin de material
sobrante
RELLENO
Relleno de material proveniente de
la excavacin
CONCRETOS
Concreto para solado (10,4 Mpa)
e= 0,10 m
Concreto de 24,5 Mpa para placa
de Piso
Concreto de 24,5 Mpa para
Zapatas
Concreto de 24,5 Mpa para Vigas
Concreto de 24,5 Mpa para
Columnas
ACERO
Suministro figurado y amarrado de
acero de refuerzo f"y = 60.000 psi
MUROS CUBIERTA Y
ACABADOS
Suministro e instalacin de Muro
en Mampostera en ladrillo comn
Paete liso para muros y placas
1:6
Estuco y vinilo 3 manos
Cubierta sencilla Modular 333 (cal
24) o similar
SUMINISTRO E INSTALACIN
CARPINTERA METLICA
Ventana en aluminio de 1.20x 1.00
m
Puerta en reja metlica 3,30x3,57m

36.80

4,635.00

170,568.00

8.17

17,474.00

142,763.00

5.17

17,308.00

89,482.00

3.00

15,227.00

45,681.00

1.71

351,163.00

600,489.00

4.42

505,652.00

2,234,982.00

3.00

505,652.00

1,516,956.00

7.80

583,973.00

4,554,989.00

4.31

583,973.00

2,516,924.00

KG

2,007.18

3,380.00

6,784,268.00

72.61

35,868.00

2,604,375.00

72.61

8,916.00

647,391.00

72.61

32,800.00

2,381,608.00

57.72

77,460.00

4,470,991.00

und

6.00

275,661.00

1,653,966.00

und

1.00

1,053,741.00

31,469,174.00

1,053,741.00

SUBTOTAL
10, CASETA DE OPERACIN Y CONTROL
10.1
10,1,1
10,1,2
10,1,3

EXCAVACIONES
Descapote y limpieza
Excavacin hasta 3,0 m de
profundidad
Retiro y disposicin de material

298.07

4,635.00

1,381,554.00

238.46

17,474.00

4,166,850.00

214.61

17,308.00

3,714,470.00

10.2
10,2,1
10.3
10,3,1
10,3,2
10,3,3
10,3,4
10,3,5
10.4
10,4,1
10.5
10,5,1
10,5,2
10,5,3
10,5,4
10,5,5
10,5,6
10,5,7
10,5,8
10,5,9
10,5,10
10,5,11
10.6
10,6,1
10,6,2
10,6,3
10,6,4
10,6,5
10,6,6
10,6,7
10,6,8

sobrante
RELLENO
Relleno de material proveniente de
la excavacin
CONCRETOS
Concreto para solado (10,4 Mpa)
e= 0,10 m
Concreto de 24,5 Mpa para placa
de piso e=0.14
Concreto Permeabilizada de 24,5
Mpa para Cubierta e=0.14
Concreto de 24,5 Mpa para
columnas de cimentacin
Concreto de 24,5 Mpa para viga
de cimentacin
ACERO
Suministro figurado y amarrado de
acero de refuerzo f"y = 60.000 psi
MUROS, PISOS Y ACABADOS
Mampostera en ladrillo estructural
Piso en tabln de gress de 0,3x0,3
Cermica para piso 0,3x0,3 blanco
Cermica para pared 1,60 m de
altura 0,3x0,3 blanco
Combo sanitario, lavamanos y
accesorio para un bao
Mesn para laboratorio en
Concreto
Lavaplatos para laboratorio
Orinales
Mesn para Baos en Concreto
Paete liso para muros y placas
1:6
Estuco y vinilo 3 manos
SUMINISTRO E INSTALACIN
CARPINTERA METLICA
ventana en aluminio de 4.45 x 0.60
m
ventana en aluminio de 5.00 x 0.60
m
ventana en aluminio de 1.78 x 0.60
m
ventana en aluminio de 1.78 x 2.40
m
ventana en aluminio de 1.26 x 0.60
m
ventana en aluminio de 1.90 x 0.60
m
ventana en aluminio de 3.65 x 0.60
m
puerta en aluminio de 3.8 x 2.10 m

23.85

15,227.00

363,164.00

14.90

351,163.00

5,232,329.00

44.71

505,652.00

22,607,701.00

44.71

583,973.00

26,109,433.00

11.05

583,973.00

6,452,902.00

7.77

583,973.00

4,537,470.00

KG

5,718.14

3,380.00

19,327,313.00

M
M
M

100.46
240.62
11.66

35,868.00
54,566.00
54,374.00

$
$
$

3,603,299.00
13,129,671.00
634,001.00

20.86

54,374.00

1,134,242.00

UN

6.00

457,000.00

2,742,000.00

0.49

418,801.00

205,212.00

UN
UN
M

2.00
2.00
0.24

238,211.00
407,760.00
418,801.00

$
$
$

476,422.00
815,520.00
100,512.00

145.17

8,916.00

1,294,336.00

145.17

32,800.00

4,761,576.00

UN

1.00

514,144.00

514,144.00

UN

1.00

576,767.00

576,767.00

UN

3.00

207,000.00

621,000.00

UN

1.00

819,143.00

819,143.00

UN

1.00

146,472.00

146,472.00

UN

3.00

219,670.00

659,010.00

UN

1.00

418,862.00

418,862.00

UN

2.00

3,642,972.00

3,983,050.00

1,711,140.00

326,339.00

136,208,876.00

11,093,363.00

1,111,886.00

8,403,331.00

1,821,486.00

puerta en aluminio de 0.80 x 2.20


UN
10.00
398,305.00
m
puerta en aluminio de 0.70 x 1.80
10,6,11
UN
6.00
285,190.00
m
puerta en aluminio de 0.80 x 1.80
10,6,12
UN
1.00
326,339.00
m
SUBTOTAL
11 SUMINISTRO E INSTALACIN DE CERRAMIENTO
EXCAVACIONES
11.1
11,1,1
Descapote y limpieza
M
2,393.39
4,635.00
Excavacin de material comn de
11,1,2
M
148.39
7,493.00
0,0 a 1,5 m (Manual) con retiro
CONCRETOS
11.2
11,2,1
Concreto para solado (10,4 Mpa)
M
23.93
351,163.00
10,6,10

e= 0,10 m
Concreto de 24,5 Mpa para viga
11,2,2
M
95.74
583,973.00
de cimentacin
Concreto de 24,5 Mpa para
11,2,3
M
17.04
583,973.00
columnetas
ACERO
11.3
Suministro figurado y amarrado de
11,3,1
KG
1,629.34
3,380.00
acero de refuerzo f"y = 60.000 psi
CERRAMIENTO Y PUERTA DE
11.4
ACCESO
11,4,1
Muro en mampostera
M
9,928.00
35,868.00
Malla eslabonada Calibre 12 de 2
11,4,2
M
5,118.00
32,255.00
m de altura x 3 m de ancho
Tubo en galvanizado 2" para
11,4,3
UN
853.00
31,974.00
cerramiento.
11,4,4
Alambre de pas para 3 hiladas
M
7,180.18
12,618.00
Puerta en tubo y malla eslabonada
de 2.2 m de altura por 5 m de
11,4,5
UN
1.00
894,153.00
ancho
CERCA VIVA
11.5
11,5,1
Siembra de Pino cipre (Plntulas)
UN
1,994.00
3,949.00
SUBTOTAL
12. CASETA DE CONTROL ELCTRICO
SUBESTACIN
12.1
EXCAVACIONES
12,1,1
12,1,1,1 Descapote y limpieza
M
128.67
4,635.00
Excavacin hasta 3,0 m de
12,1,1,2
M
40.00
17,474.00
profundidad
Retiro de material sobrante de la
12,1,1,3
M
36.00
17,308.00
excavacin
RELLENO
12,1,2
Relleno de material proveniente de
12,1,2,1
M
4.00
15,227.00
la excavacin
CONCRETOS
12,1,3
Concreto para solado (10,4 Mpa)
12,1,3,1
M
6.43
351,163.00
e= 0,05 m
Concreto de 3500 psi para placa
12,1,3,2
M
19.30
505,652.00
de piso e=0.14
Concreto de 3500 psi para
12,1,3,3
M
3.56
583,973.00
columnas de cimentacin
Concreto para cubierta 3500 psi
12,1,3,4
M
19.30
583,973.00
impermeabilizado e=0.14
Concreto de 3500 psi para Vigas
12,1,3,5
M
4.57
583,973.00
de cimentacin
ACERO
12,1,4
Suministro figurado y amarrado de
12,1,4,1
KG
2,469.50
3,380.00
acero de refuerzo f"y = 60.000 psi
MUROS, PISOS Y ACABADOS
12,1,5
Suministro e instalacin de Muro
12,1,5,1
UN
40.60
35,868.00
en Mampostera en ladrillo comn
Suministro e instalacin de Piso en
12,1,5,2
UN
117.23
54,566.00
Tabln de gress de 0,3x0,3
Paete liso para muros y placas
12,1,5,3
M
59.90
8,916.00
1:6
12,1,5,4 Estuco y vinilo 3 manos
M
59.90
32,800.00
SUMINISTRO E INSTALACIN
12,1,6
CARPINTERA METLICA
Suministro e instalacin de ventana
12,1,6,1
UN
1.00
418,862.00
en aluminio de 3.65 x 0.60 m
Suministro e instalacin de puerta
12,1,6,2
UN
3.00
950,872.00
en aluminio de 2.0 x 2.1 m
Suministro e instalacin de puerta
12,1,6,3
UN
1.00
380,350.00
en aluminio de 0.8 x 2.1 m
SUBTOTAL
13. SUMINISTRO E INSTALACIN DE EQUIPOS ELCTRICOS
ESTRUCTURAS RED MT Y BT
13.1

55,909,575.00

9,950,900.00

5,507,169.00

356,097,504.00

165,081,090.00

27,273,822.00

90,599,511.00

894,153.00

$
$

7,874,306.00
739,796,610.00

596,385.00

698,960.00

623,088.00

60,908.00

2,257,978.00

9,759,084.00

2,078,944.00

11,270,679.00

2,668,757.00

8,346,910.00

1,456,241.00

6,396,772.00

534,068.00

1,964,720.00

418,862.00

2,852,616.00

380,350.00

52,365,322.00

13,1,1
13,1,2
13,1,3
13.2
13,2,1
13,2,2
13.3
13,3,1
13,3,2
13.4
13,4,1
13,4,2
13,4,3
13,4,4
13,4,5
13,5,
13,5,1
13,5,2

13,5,3

13,5,4
13,5,5
13,5,6
13,5,7
13,5,8
13,5,9
13,5,10

PROYECTADAS
Estructura norma la203 o similar
Estructura norma la202
Estructura norma la218 o similar sin templetes
CONDUCTORES RED MT
PROYECTADA
Suministro e instalacin de cable
acsr calibre 2 para red mt
Suministro e instalacin por ducto
de cable xlpe 14 kv calibre 2,
pantalla en hilos , al 100%
POSTES DE CONCRETO
Suministro, transporte, arrimada hoyada, hincada y aplomada de
poste de concreto de 12m x 750
Suministro, transporte, arrimada hoyada, hincada y aplomada de
poste de concreto de 12m x 1050
SUBESTACIONES Y CELDA
Transformador tipo seco de 1000
kva - 11.4kv - 440/254 incluye
Celda - segn norma cts518-2
Celda proteccin transformador (
trafo 1000 kva) norma cts503-3
Celda de medida en media tensin
tipo interior 2 cts , 2 pts, clase 0.5 bornera, medidor - norma ae325
Suministro e instalacin de juego
terminales premoldeados 14 kv tipo
interior
Suministro e instalacin de
descargador de sobre tensin 12 10 kv - 10 ka
CONDUCTORES ACOMETIDAS
EXTERIORES BT POR DUCTOS
Suministro e instalacin de arreglo
de conductores por ducto 6(3#400) cu thhn+1#4/0(t)
Suministro e instalacin de arreglo
de conductores por ducto en 3#4/0
cu thhn+1#4(t)
Suministro e instalacin de arreglo
de conductores por ducto en
3#2/0+1#2/0 + 1#4(t) - cobre
aislado thhn
Suministro e instalacin de arreglo
de conductores por ducto en 3#2/0
cu thhn+1#6(t)
Suministro e instalacin de arreglo
de conductores por ducto 2(3#2/0
cu thhn) + 1#2(t)
Suministro e instalacin de arreglo
de conductores por ducto 2(3#2/0
cu thhn) + 1#4(t)
Suministro e instalacin de arreglo
de conductores por ducto en
3#2+1#2 cu thhn + 1#8(t)
Acometida trifasica por ducto en
cable de cobre aislado 3#4 cu
thhn+1#8(t)
Acometida trifasica por ducto en
cable de cobre aislado 3#8 +1#8
thhn+1#8(t)
Acometida trifasica por ducto en
cable de cobre aislado 3#6 +1#6
thhn+1#8(t)

UN
UN

2.00
2.00

UN

1.00

ML

60.00

ML

314.00

UN

1.00

UN

1.00

UN

1.00

UN

1.00

UN

1.00

JUEGO

6.00

UN

3.00

571,185.00
353,710.00

$
$

1,142,370.00
707,420.00

4,167,524.00

2,391.00

143,460.00

49,356.00

15,497,784.00

1,052,346.00

1,266,641.00

68,758,581.00

9,952,898.00

14,930,161.00

609,418.00

3,656,508.00

136,957.00

410,871.00

217,620,884.00

4,167,524.00

1,052,346.00
1,266,641.00

68,758,581.00
9,952,898.00
14,930,161.00

ML

146.00

ML

266.00

151,075.00

40,185,950.00

ML

84.00

125,427.00

10,535,868.00

ML

657.00

94,284.00

61,944,588.00

ML

89.00

186,256.00

16,576,784.00

ML

219.00

182,445.00

39,955,455.00

ML

219.00

60,623.00

13,276,437.00

ML

480.00

38,281.00

18,374,880.00

ML

161.00

20,710.00

3,334,310.00

ML

146.00

30,035.00

4,385,110.00

1,490,554.00

13.6
13,6,1
13,6,2
13,6,3
13,6,4
13,6,5
13,6,6
13,6,7
13,6,8
13,6,9
13,6,10
13,6,11
13,6,12
13,6,13
13,6,14
13,6,14
13,6,16
13,6,17
13,6,18
13,6,19
13,6,20
13,6,21
13.7
13,7,1
13,7,2
13,7,3
13,7,4

CONDUCTOR ACOMETIDAS EN
BT Y DUCTOS EN CASETAS
Tubo pvc 1 x 4" por placa o pared
Tubo pvc 1 x 3" por placa o pared
Tubo pvc 1 x 2" por placa o pared
Tubo pvc 1 x 1 1/2" por placa o
pared
Tubo pvc 1 x 1 1/4" por placa o
pared
Tubo pvc 1 x 1" por placa o pared
Tubo pvc 1 x 3/4" por placa o
pared
Tubera emt 1 x 3" - adosada
apared -incluye accesorios y
soportes
Tubera emt 1 x 2" - adosada
apared -incluye accesorios y
soportes
Tubera emt 1 x 1 1/2" - adosada
apared -incluye accesorios y
soportes
Tubera emt 1 x 1 1/4" - adosada
apared -incluye accesorios y
soportes
Tubera emt 1 x 1 " - adosada
apared -incluye accesorios y
soportes
Tubera emt 1 x 3/4 " - adosada
apared -incluye accesorios y
soportes
Suministro e instalacin de arreglo
de conductores por ducto 4(3#400 + 1#400 cu thhn)+1#4/0(t)
Suministro e instalacin de arreglo
de conductores por ducto 4(3#400 + 1#400 cu thhn)
Suministro e instalacin de arreglo
de conductores por ducto 2(3#2/0
cu thhn) + 1#2(t)
Suministro e instalacin de arreglo
de conductores por ducto 2(3#1/0
cu thhn) + 1#2(t)
Suministro e instalacin de arreglo
de conductores por ducto 3#1/0
cu thhn +1#6(t)
Suministro e instalacin de arreglo
de conductores por ducto en
3#4+1#4 cu thhn+1#8(t)
Suministro e instalacin de arreglo
de conductores por ducto en 3#4
cu thhn+1#8(t)
Suministro e instalacin de arreglo
de conductores por ducto 3#10 cu thhn+1#10(t)
BANCO DE DUCTOS Y
CMARAS DE INSPECCION
Cmara de inspeccin baja tensin
norma cs274 - incluye marco y
tapa
Cmara de inspeccin baja - media
tensin norma cs275 - incluye
marco y tapa
Cmara de inspeccin baja - media
tensin norma cs276 - incluye
marco y tapa
Banco de ductos 12x4" + 4x2" norma cs207 o similar

ML
ML
ML

80.00
45.00
8.00

34,236.00
33,755.00
17,096.00

$
$
$

2,738,880.00
1,518,975.00
136,768.00

ML

21.00

13,349.00

280,329.00

ML

65.00

11,495.00

747,175.00

ML

5.00

8,633.00

43,165.00

ML

5.00

7,605.00

38,025.00

ML

8.00

86,496.00

691,968.00

ML

6.00

40,064.00

240,384.00

ML

10.00

35,546.00

355,460.00

ML

12.00

32,410.00

388,920.00

ML

5.00

24,806.00

124,030.00

ML

5.00

20,500.00

102,500.00

ML

14.00

18,710,748.00

ML

33.00

42,583,629.00

ML

10.00

186,256.00

1,862,560.00

ML

65.00

145,974.00

9,488,310.00

ML

10.00

78,888.00

788,880.00

ML

12.00

46,365.00

556,380.00

ML

26.00

37,461.00

973,986.00

ML

8.00

15,260.00

122,080.00

UN

14.00

600,340.00

8,404,760.00

UN

37.00

983,694.00

36,396,678.00

UN

8.00

9,942,216.00

ML

75.00

20,292,600.00

1,336,482.00
1,290,413.00

1,242,777.00
270,568.00

13,7,5
13,7,6
13,7,7
13,7,8
13,7,9
13,7,10
13,7,11
13,7,12
13,7,13
13,7,14
13,7,14
13,7,16
13.8
13,8,1
13,8,2
13,8,3
13,8,4
13,8,5

13.9
13,9,1
13,9,2
13,9,3
13,9,4
13.10
13,10,1
13,10,2
13,10,3
13,10,4

Banco de ductos 10x4" + 2x2" norma cs207 o similar


Banco de ductos 8x4" + 2x2" norma cs207 o similar
Banco de ductos 6x4" + 4x2" norma cs207 o similar
Banco de ductos 4x4" + 4x2" norma cs207 o similar
Banco de ductos 4x4"+2x2"- norma
cs207 o similar
Banco de ductos 2x4"+4x2"- norma
cs207 o similar
Tubo pvc 4 x 2" - enterrado similar
norma cs207
Tubo pvc 3 x 2" - enterrado similar
norma cs207
Tubo pvc 2 x 2" - enterrado similar
norma cs207
Banco de ductos 4x6" - norma
cs207 o similar
Banco de ductos 2x4"- norma
cs207 o similar
Banco de ductos 4x4" - norma
cs207 o similar
SISTEMA DE ALUMBRADO
EXTERIOR
Red alumbrado publico por ducto
en cable de cobre aislado 3#8
thhhn +1#10(t)
Suministro e instalacin de arreglo
de conductores por ducto 2#10 cu thhn+1#10(t)
Red alumbrado publico por ducto
en cable de cobre aislado 2#10
thhhn +1#12(t)
Suministro e instalacin de poste
metlico de 9m con base y
aterrizaje para alumbrado publico
Suministro e instalacin de
luminaria cerrada sodio 70w-220v con fotoCelda y brazo
MALLA DE PUESTA A TIERRA
Suministro e instalacin de
electrodo de puesta a tierra 5/8 x
2.4 mts
Suministro e instalacin de cable
de cobre desnudo 2/0 (spt)
Suministro y aplicacin de
soldadura exotermica 114 gr incluye molde
Caja de inspeccin 30x30 con
marco y tapa - para puesta a tierra
Suministro e instalacin de tierra
artificial favigel, hidrogel, hidrosolta
INSTALACIONES INTERNAS
Salida para iluminacin en ducto
pvc -alambre de cobre thhn ( no
incluye luminarias)
Salida para interuptor sencillo en
ducto pvc -alambre de cobre thhn
incluye interuptor sencillo leviton
Salida para interuptor doble en
ducto pvc -alambre de cobre thhn
incluye interuptor doble leviton
Salida para interuptor conmutable
sencillo en ducto pvc -alambre de
cobre thhn incluye interuptor

ML

75.00

215,899.00

16,192,425.00

ML

10.00

192,184.00

1,921,840.00

ML

86.00

171,579.00

14,755,794.00

ML

77.00

137,024.00

10,550,848.00

ML

25.00

120,264.00

3,006,600.00

ML

74.00

101,672.00

7,523,728.00

ML

68.00

54,342.00

3,695,256.00

ML

445.00

49,544.00

22,047,080.00

ML

221.00

46,015.00

10,169,315.00

ML

85.00

139,683.00

11,873,055.00

ML

14.00

110,615.00

1,548,610.00

ML

16.00

104,897.00

1,678,352.00

ML

576.00

15,302.00

8,813,952.00

ML

640.00

13,087.00

8,375,680.00

ML

70.00

11,323.00

792,610.00

UN

35.00

65,904,580.00

UN

61.00

534,972.00

32,633,292.00

UN

6.00

128,480.00

770,880.00

ML

70.00

40,732.00

2,851,240.00

UN

26.00

46,936.00

1,220,336.00

UN

4.00

168,073.00

672,292.00

KG

200.00

12,607.00

2,521,400.00

UN

65.00

53,080.00

3,450,200.00

UN

17.00

52,932.00

899,844.00

UN

2.00

70,265.00

140,530.00

UN

8.00

61,853.00

494,824.00

1,882,988.00

13,10,5
13,10,6
13,10,7

13,10,8

13,10,9
13,10,1
0
13,10,1
1
13,10,1
2
13,10,1
3
13,10,1
4
13,10,1
4
13,10,1
6
13,10,1
7
13,10,1
8
13.11
13,11,1

13,11,2

13,11,3

13,11,4
13,11,5
13,11,6
13,11,7

conmutable sencillo
Salida para toma doble con polo a
tierra gfci, en ducto pvc -alambre
de cobre thhn incluye toma GFCI
Salida para toma doble con polo a
tierra en ducto pvc -alambre de
cobre thhn incluye toma
Salida para toma bifasica 220v-20a
en ducto pvc -alambre de cobre
thhn incluye toma
Salida para secador de manos
bifasica 220v-20a en ducto pvc alambre de cobre thhn incluye
aparato
Salida para toma trifasica 220v-20a
en ducto pvc -alambre de cobre
thhn incluye toma
Suministro e instalacin de
luminaria fluorescente hermetica
2x54w - t5 - balastro electrnico
multi tensin
Salida iluminacin -antiexplosion no incluye luminaria - ducto imc alambre cobre - incluye accesorios
Salida interptor sencillo antiexplosion - en ducto imc alambre cobre - incluye accesorios
- incluye interuptor
Salida toma doble -antiexplosion en ducto imc -alambre cobre incluye accesorios - incluye toma
leviton
Salida Acometida 220v antiexplosion - en ducto imc alambre cobre - incluye accesorios
- no incluye toma
Arrancador directo 220v -contactor
3hp - 220v
Suministro e instalacin luminaria
seguridad 2x32w - t8
Salida telefonica en ducto pvc cable telefonico 2p - incluye toma
telefonica leviton
Strip telefonico de 50p - no incluye
obra civil , incluye regletas
telefonicas, marcacin y
configuracin
TABLEROS Y BREAKERS
Suministro e instalacin de Tablero
3f de 24 ctos con espacio
totalizador - con puerta y chapa barras de tierra y neutro
Suministro e instalacin de Tablero
3f de 18 ctos con espacio
totalizador - con puerta y chapa barras de tierra y neutro
Suministro e instalacin de Tablero
3f de 12 ctos con espacio
totalizador - con puerta y chapa barras de tierra y neutro
Suministro e instalacin de breaker
enchufable monopolar de 14 o 20
a
Suministro e instalacin de breaker
enchufable bipolar de 20 a 40 a
Suministro e instalacin de breaker
enchufable tripolar de 20 a 50 a
Suministro e instalacin de breaker

UN

2.00

92,281.00

184,562.00

UN

62.00

61,639.00

3,821,618.00

UN

14.00

100,512.00

1,407,168.00

UN

2.00

393,416.00

786,832.00

UN

3.00

106,129.00

318,387.00

UN

51.00

223,899.00

11,418,849.00

UN

4.00

410,399.00

1,641,596.00

UN

1.00

447,633.00

447,633.00

UN

6.00

448,168.00

2,689,008.00

UN

1.00

445,226.00

445,226.00

UN

1.00

1,731,003.00

UN

4.00

665,316.00

2,661,264.00

UN

4.00

58,587.00

234,348.00

UN

1.00

456,818.00

456,818.00

UN

2.00

450,041.00

900,082.00

UN

2.00

380,188.00

760,376.00

UN

3.00

329,400.00

988,200.00

UN

26.00

14,239.00

370,214.00

UN

17.00

25,570.00

434,690.00

UN

5.00

56,056.00

280,280.00

UN

1.00

154,984.00

154,984.00

1,731,003.00

13,11,8
13,11,9
13,11,1
0
13,11,1
1
13,11,1
2

13,11,1
3

13,11,1
4

13,11,1
4

13,11,1
6

13,11,1
7
13,11,1
8

13,11,1
9

13,11,2
0
13,11,2
1
13,11,2
2
13,11,2
3
13,11,2
4
13.12

industrial regulable tripolar 3x(2840)a - 25 ka


Suministro e instalacin de breaker
industrial regulable tripolar 3x(3550)a - 25 ka
Suministro e instalacin de breaker
industrial regulable tripolar 3x(4463)a - 25 ka
Suministro e instalacin de breaker
industrial regulable tripolar 3x(5680)a - 25 ka
Suministro e instalacin de breaker
industrial regulable tripolar 3x(112
- 160)a - 40 ka
Tablero control, operacin y
proteccin a motores - incluye
contactores - gabinete - breker
industrial - breaker riel y
accesorios ( - Tablero tp-dar)
Tablero control, operacin y
proteccin a motores - incluye
contactores - gabinete - breker
industrial - breaker riel y
accesorios ( - Tablero tp-elv )
Tablero control, operacin y
proteccin a motores - incluye
contactores - gabinete - breker
industrial - breaker riel y
accesorios ( Tableros tp-brl-1-2 tp-brl-3-4 )
Tablero control, operacin y
proteccin a motores - incluye
contactores - gabinete - breker
industrial - breaker riel y
accesorios ( Tableros tp-bl4 )
Tablero control, operacin y
proteccin a motores - incluye
contactores - gabinete - breker
industrial - breaker riel y
accesorios ( Tableros tp-bl1 - tpbl2 - tp-bl3 )
instalacin Tablero caseta
deshidratador lodos tp-dhl - (
suministrado junto a los equipos)
Tablero de proteccin y control
sopladores - 440 v - (tp-s440)
Sistema de medicin de oxgeno
disuelto, marca hach cuyas
caractersticas tcnicas principales
son (2) controlador-analizador
modelo sc 100 .- rango de
operacin de cero a 20 pm.rango
de temperatura de cero a
100c.tres rels electromecnicos
tipo spdt
Tablero general de Acometidas a
440
Tablero de proteccin a 220v - (
tp-tbb) - incluye transformador seco
baja - baja
Tablero Banco de condensadores
a 440 - (tp-bc)

UN

1.00

154,984.00

154,984.00

UN

1.00

154,984.00

154,984.00

UN

1.00

151,098.00

151,098.00

UN

1.00

402,141.00

402,141.00

UN

1.00

4,191,717.00

UN

1.00

9,006,831.00

UN

2.00

3,048,668.00

UN

1.00

4,264,583.00

UN

3.00

12,735,972.00

UN

1.00

302,626.00

UN

1.00

238,225,041.00

UN

1.00

80,927,229.00

UN

1.00

32,193,968.00

UN

1.00

14,864,198.00

UN

1.00

18,530,564.00

transferencia automtica

UN

1.00

47,330,714.00

planta de emergencia

UN

1.00

539,731,643.00

CERTIFICACIONES REPLANTEOS - MANIOBRAS

4,191,717.00

9,006,831.00

1,524,334.00

4,264,583.00

4,245,324.00

302,626.00
238,225,041.00

80,927,229.00

32,193,968.00
14,864,198.00
18,530,564.00
47,330,714.00
539,731,643.00

13,12,1

3,644,841.00

3,061,890.00

1,898,622.00

1,688,830.00

14,269,342.00

1,554,547.00
2,004,378,970.00

14.1

$
14. SUMINISTRO E INSTALACIN DE EQUIPOS DE TRATAMIENTO
TRATAMIENTO PRELIMINAR

14,1,1*

Canaleta Parshall Fibra de vidrio

13,12,2
13,12,3
13,12,4
13,12,5
13,12,6

Certificacin retie
Maniobras en lnea viva o
desconexin de circuito
Derechos de energizacin y
revisin proyecto a pagar a el
operador de red
Dosto por montaje e instalacin de
medidor a pagar al operador de red
Diseo elctrico - aprobacin ante
operador de red
Replanteo redes de bt y mt

UN

1.00

UN

1.00

UN

1.00

UN

1.00

UN

1.00

UN

1.00

3,644,841.00
3,061,890.00
1,898,622.00
1,688,830.00
14,269,342.00
1,554,547.00

SUBTOTAL

14,1,2
14,1,3
14,1,4
14,1,5
14.2
14,2,1
14,2,2
14.3
14,3,1
14.4
14,4,1

14,4,2
14.5
14,5,1

14,5,2
14.6
14,6,1
14,6,2
14,6,3

Suministro e instalacin de
Militamices Estndar SPECO
modelo GCP 701 o Similar
Suministro e instalacin de
Clasificador de arenas SPECO
modelo DS 1000 o Similar
Suministro e instalacin de
Compuerta de 0.80 m, H Vstago:
1,22 con manija manual
Suministro e instalacin de
Compuerta de 1.00 m, H Vstago:
1,22 con manija manual
SISTEMA DE AIREACIN
DIFUSA
Sopladores Roots Dresser de 140
HP
Difusores Burbuja Fina SSI AFTS
3100 91 MM
SEDIMENTADOR
Suministro e instalacin de
Barredor para clarificador de 23 m
de dimetro
CASETA DE CLORACIN
Suministro e instalacin de
Sistema de cloro gaseoso con
intercambio Automtico, Mosquera
I Q= 216 L/S , Concentracin: 5
ppm o similar
Suministro e instalacin de
Equipos Para Automatizacin
Dosificacin Cloro o similar
BOMBEO DE LODOS
Suministro e instalacin de Bomba
sumergible 4", 3 HP, 28,5 l/s, H=
6,0 m, con Gua de izamiento para
bomba, o similar
Suministro e instalacin de Bomba
sumergible 2", 1 HP, 4.9 l/s, H= 5,0
m, con guia de izamiento para
bomba, o similar
DESHIDRATACIN DE LODOS
Suministro e instalacin de
decantador centrifuga ALDEC 45 o
similar.
Suministro e instalacin de Bomba
de alimentacin de lodos de
cavidad progresiva
Suministro e instalacin de Tanque
de dosificacin y mezcla de

UN

2.00

UN

2.00

UN

1.00

UN

2.00

UN

2.00

UN

4.00

UN

750.00

UN

3.00

UN

1.00

UN

1.00

UN

9.00

UN

6.00

UN

1.00

UN

2.00

UN

1.00

9,695,841.00
134,707,579.00
48,990,843.00
27,787,652.00
29,856,230.00

120,013,300.00
548,100.00

351,000,000.00

135,384,289.00

62,036,890.00

18,553,889.00

4,582,000.00

331,990,623.00
17,564,547.00
42,013,098.00

19,391,682.00

269,415,158.00

48,990,843.00

55,575,304.00

59,712,460.00

480,053,200.00

411,075,000.00

1,053,000,000.00

135,384,289.00

62,036,890.00

166,985,001.00

27,492,000.00

331,990,623.00

35,129,094.00

42,013,098.00

14,6,4
14,6,5
14,6,6
14,6,7
14,6,8

polmero
Suministro e instalacin de Bomba
de dosificacin de polmero de
cavidad progresiva
Suministro e instalacin de
Tanques espesador de lodos con
motoreductor y aspas
Tolva metlica de lodos capacidad
de 10 m3
Escalera metlica 45 acceso a
centrifuga
Escalera metlica tipo gato

UN

2.00

UN

2.00

UN

1.00

UN

1.00

UN

1.00

SUBTOTAL
ARRANQUE Y PUESTA EN
15.1
mes
MARCHA PTAR
SUBTOTAL
SUBTOTAL PROYECTO
ADMINISTRACIN
IMPREVISTOS
UTILIDAD
TOTAL COSTO OBRA
REVISIN, ACTUALIZACIN Y AJUSTE DE
DISEOS 1.5%
TOTAL EJECUCIN CONTRATO DE OBRA

3.00

10,430,835.00
192,390,755.00
44,051,000.00
12,992,000.00
5,481,000.00

18,753,212.00

17%
3%
5%

20,861,670.00

384,781,510.00

44,051,000.00

12,992,000.00

5,481,000.00

3,666,411,822.00

56,259,636.00

$
$
$
$
$
$

56,259,636.00
14,247,404,589.00
2,422,058,780.13
427,422,137.67
712,370,229.45
17,809,255,736.25

267,138,836.04

18,076,394,572.29