Abstract:
SHIPYARD PLANNING:
Is the area planned to be enlarged by way of Should be after sales service to the consumers
reclamation? be undertaken by the firm itself or should firm
itself or should firm enter into some agreement
Ideal Shipyard Layout should manifest: with other firm for this important responsibility?
Site Planning is very Important as the when the
• Free flow of Materials (no bottlenecks). plant becomes too large, certain diseconomies
may set in. Sheer size of plant may cause
The Advantages in fully agreeing stand at: bottlenecks in the production process. The
movement of men and materials inside the
• Uniform work Load plant may become more costly. Transportation
• Shorter ship build cycle. costs outside the yard may also become
• Economies in Construction practices. excessive.
BUILDING ALTERNATIVES:
A) Building berth :
1) Low initial cost
2)No shelter from weather
A crude layout, i.e. the basis that requires 3) High cranes requirement
adjustment and rearrangement to obtain the 4)Launching costs are high
final layout configuration is to be planned. 5) Possibility of structural damages
Establishing the rates of the desired closeness during launch
between all the facilities is a laborious process.
It is a subjective approach, which requires B) Building Dock:
minimum background and experience about 1) High Initial cost
the activities to be implemented within the 2) No shelter from weather
projected facilities. The flows of materials, 3)Access may be hard
personnel and information were taken into 4) lower cranes requirement
consideration. 5) lower possibility of damage during
launching
Milestone
Event Construction Activity
Execution
of Preparations of Approved
Contract drawings
Preparations of Production
drawings
Steel
Cutting Preparation for Production
Prefabrication and block assembly
Keel
Laying Block assembly
Hull Erection
Launching Testing and commissioning
•Equipment Modules:
–Three-dimensional, self-supporting, self-
erecting assemblies of equipment, mounted on
foundations or temporary skids
–Everything in a module is tested and
operational: only the external connections
remain
Completion and
testing:
FAILURE OBSERVED AND IMPROVEMENT
REQUIREMENTS IN GREENFIELD
SHIPYARDS IN INDIA:
2. Yard Infrastructure:
Block Construction:
13. Block Assembly:
Block assembly is seen as an opportunity
to reduce the work content at the
construction point.
BLOCK SHIP-CONSTRUCTION
STRATEGIES Block construction, common for large vessels,
also is used for some smaller ones. Blocks can
Until about 1950, ships were generally built vary in size from approximately 50 tons for
piece by piece (similar to a building site), an small vessels to up to 400 tons for large
approach with a very low investment cost, vessels such as very large crude carriers
minimum crane requirements, and small-scale (VLCCs).
transport. Today, the piece-by-piece approach
is rarely used, except in undeveloped Block construction has advantages that are
countries, where the labour cost is low, and in more dramatic than those for assemblies:
developed countries for some small craft and higher productivity and, therefore, lower labour
one-of-a-kind ships. costs. But blocks also entail disadvantages:
the need for highly accurate assembly, a larger
Shipbuilders have recognized the advantages investment cost in facilities, and a very high
of building larger portions of ships in covered reliance on control of accuracy and on on-time
production facilities, then assembling those delivery of materials.
portions in a dry dock or on a slipway.
As larger numbers of similar ships are built,
standardization, repetition, and automation
lead to economies of scale and production
efficiencies, and, in turn, to lower costs and
reduced schedules. But, as the size of the
modules built in production facilities grows,
more investment is needed for larger cranes
and transporters, and much more attention is
required for configuration control to maintain
the build tolerances between the modules.
Assembly Construction
Narayana Prakash,
C.Eng,F.I.E(I),M.I.Mar.E.(I).
Project Manager,
G.T.R.Campbell Marine Consultants, Ltd.