DESIGN CALCULATION SHEET OF

AIR RECEIVER TANK

Doc. No

: ENG-CAL-001

Revision : 1
Sheet
: 43 of 47

15. Inspection Opening Analysis

According to UG 46 (f) 3-4

All
in.mm)
(900or
mm)
shall
have a manhole,
except that those whose shape or use makes one im
6 vessels
in. (100 over
mm 36
150
twoI.D.
equal
openings
of
equivalent area.

When handholes or pipe plug opening are permitted for inspetion opening in a place of manhole, one hand hole
opening shall be in each head or in the shell near head
Result

The Acces & Inspection Nozzle (H1 & H2) use as inspection opening

ENG-CAL-001
43 of 47

anhole, except that those whose shape or use makes one impracticable shall

d for inspetion opening in a place of manhole, one hand hole or one pipe plug