PROJECT DEPARTMENT

PIPE LOG
Location

: TELUK EMPANGAN
PROPOSED 350MM AB3P PIPE

CHAINAGE

EXC. DEPTH

Sheet No. :
Date
:

SKETCHED DRWG.

TRECH EXCAVATION

1.2

: TELUK EMPANGAN

1
1/25/2015

a) Depth < 1.8 m


b) Depth > 1.8 m < 3.0 m
c) Road Cutting
d) Track/Gravel/Earth Road
e) Concrete Surface
f) Cross Hedges/Fences/Wall
g) Road Kerb
h) Under water earth drain
i) Under concrete drain/culvert
j) In rock
k) Unsuitable Material

3
0
0
m
m
A
B
3
P
pi
p
e

m
m
m
sq.m
sq.m
sq.m
m
sq.m
sq.m
cu.m
cu.m

216

REINSTATEMENT ROAD

a) Sand Filling
b) Crusher Run
c) Binder Course
d) Wearing Course
e) Milling/Resurfacing
f)Thermoplastic Line Marking

cu.m
sq.m
sq.m
sq.m
sq.m
m

sq.m

SITE CLEARANCE

S/
V

cu.m
cu.m
sq.m
sq.m
cu.m

1m x
100
mm
MS
Pipe

FILLING

DIA.(mm)

350

L (m)

204

EXPOSE PIPE & SPECIAL

100mm MS pipe

T
e
e

3
5
0
m
m
x
1
0
0
m
m

nos
nos

TURFING

Top Soil (50mm)


Turfing

NOS

m
D
J

Approved Material
Sand
Laterite (150mm)
Sand Bedding
Concrete

PIPE

AB3P

1m
x
100
mm
MS
Pipe

cu.m
cu.m
cu.m

100
mm
Duck
Foot
Bend

BULK EXCAVATION

All material
Rock
Compact material

nos

sq.m
sq.m

sq.m
Foo
t
Ben
d

1m
x
10
0m
m
MS
Pip
e

Middle

nos
100mm collar

PILING

nos

100mm pillar hydrant

nos

100mm ND. DF sluice valve

nos

100mm ND X 95 deg

nos

nos

100m
m
Duck
Foot
Bend

1m x
100
mm
MS
Pipe

nos
nos
1m x
100m
m MS
Pipe

S/
V

nos
nos

3
5
0
m
m
x
1
0
0
m
m
Te
e

nos
D
J

mm
m
m
nos
nos
sq.m
nos

350x100mm offtake tee

Kayu Bakau
Type of Pile
Size
Length (Initial)
Length (Extention)
Join Welding
Cut Pile (1m)
Linatex Rubber
MS Strap
Prepared By :

nos

T
e
e

1
0
0
m
m

3
5
0
m
m

S
/
V
D
J
sq.m

CHIPPING

nos

100mm dresser joint

1m
x
100
mm
MS
Pip
e

Set

100
mm
Duc
k

SPECIAL / FITTINGS
CHAMBER
Type

nos
nos
nos

350 mm AB3P
pipe
Checked and Approved By :

B
9
0

nos
Verified By :

PROJECT DEPARTMENT
PIPE LOG
Location

: TELUK EMPANGAN
PROPOSED 30OMM AB3P PIPE

CHAINAGE

EXC. DEPTH

Sheet No. :
Date
:

SKETCHED DRWG.

TRECH EXCAVATION

1.2

: TELUK EMPANGAN

3
5
0
350mm x
300mm
AB3P
Tapper

1m x
300mm
AB3P

m
m

a) Depth < 1.8 m


b) Depth > 1.8 m < 3.0 m
c) Road Cutting
d) Track/Gravel/Earth Road
e) Concrete Surface
f) Cross Hedges/Fences/Wall
g) Road Kerb
h) Under water earth drain
i) Under concrete drain/culvert
j) In rock
k) Unsuitable Material

D
DJ

4m

J
2m

B45
1.5m
0.5
m
B4
5

sq.m

SITE CLEARANCE

1.5
m B45

BULK EXCAVATION

All material
Rock
Compact material

cu.m
cu.m
cu.m

PIPE

DIA.(mm)

AB3P

300

CHAMBER
Set

sq.m

Middle

nos

7.5

m
m

sq.m

nos
nos
SPECIAL / FITTINGS

100mm collar joint

nos

100mm x 45 deg bend

nos

300x100mm offtake tee

nos

300mm dresser joint

nos

350 x 300mm tapper

nos

nos
nos

nos

mm
m
m
nos
nos
sq.m
nos

nos
nos
nos
nos
nos
nos
nos
nos
nos

Checked and Approved By :

L (m)

66

2
5
0

PILING

Kayu Bakau
Type of Pile
Size
Length (Initial)
Length (Extention)
Join Welding
Cut Pile (1m)
Linatex Rubber
MS Strap
Prepared By :

NOS

sq.m
sq.m

CHIPPING

cu.m
sq.m
sq.m
sq.m
sq.m
m

100mm ms pipe

TURFING

Type

76

EXPOSE PIPE & SPECIAL

cu.m
cu.m
sq.m
sq.m
no

Top Soil (50mm)


Turfing

m
m
m
sq.m
sq.m
sq.m
m
sq.m
sq.m
cu.m
cu.m

REINSTATEMENT ROAD

a) Sand Filling
b) Crusher Run
c) Binder Course
d) Wearing Course
e) Milling/Resurfacing
f)Thermoplastic Line Marking

FILLING

Approved Material
Sand
Laterite (150mm)
Sand Bedding
Concrete

2
1/25/2015

Verified By :

PROJECT DEPARTMENT
PIPE LOG
Location

: TELUK EMPANGAN
Proposed 250mm AB3P pipe (A1)

CHAINAGE

EXC. DEPTH

Sheet No. :
Date
:

SKETCHED DRWG.

1.8

: TELUK EMPANGAN

B45

3
0
0
m
m

sq.m
1m MS

BULK EXCAVATION

cu.m
cu.m
cu.m

1m x 300mm
AB3P

A
B
3
P

FILLING

TURFING

Top Soil (50mm)


Turfing

DJ

cu.m
cu.m
sq.m
sq.m
no

1m MS
B45

Approved Material
Sand
Laterite (150mm)
Sand Bedding
Concrete

a) Sand Filling
b) Crusher Run
c) Binder Course
d) Wearing Course
e) Milling/Resurfacing
f)Thermoplastic Line Marking

152

cu.m
sq.m
sq.m
sq.m
sq.m
m

PIPE

DIA.(mm)

NOS

L (m)

AB3P

250

54

EXPOSE PIPE & SPECIAL

100mm ms pipe

m
nos

300mm x
250mm
AB3P Tapper

All material
Rock
Compact material

m
m
m
sq.m
sq.m
sq.m
m
sq.m
sq.m
cu.m
cu.m

REINSTATEMENT ROAD

A
B
3
P
SITE CLEARANCE

TRECH EXCAVATION

a) Depth < 1.8 m


b) Depth > 1.8 m < 3.0 m
c) Road Cutting
d) Track/Gravel/Earth Road
e) Concrete Surface
f) Cross Hedges/Fences/Wall
g) Road Kerb
h) Under water earth drain
i) Under concrete drain/culvert
j) In rock
k) Unsuitable Material

2
5
0
m
m

3
1/25/2015

nos
nos

sq.m
sq.m

sq.m
SPECIAL / FITTINGS

CHAMBER
Type

Set

Middle

100mm collar joint

nos

100mm x 45 deg bend

nos

100mm dresser joint

nos

300 x 250mm tapper

nos

nos

sq.m

CHIPPING

nos

PILING

Kayu Bakau
Type of Pile
Size
Length (Initial)
Length (Extention)
Join Welding
Cut Pile (1m)
Linatex Rubber
MS Strap
Prepared By :

nos

nos

mm
m
m
nos
nos
sq.m
nos

nos
nos
nos
nos
nos
nos
nos
nos
nos

Checked and Approved By :

Verified By :

B45

250mm AB3P
1m MS

1m MS

300mm AB3P

1m MS

B45