Beruflich Dokumente
Kultur Dokumente
MODULOS
UNIDAD
DESCRIPCION
NRO DE
MOD.
Nro
AREA X
UND
AREA
PARCIAL M2
31.91
31.91
Almacen
15.59
15.59
Area de Investigacion
31.91
31.91
Direccion de Produccion
15.75
15.75
Prestacion de Servicios
15.75
15.75
Humanidades
15.59
15.59
Lengua y literatura
15.75
15.75
Deposito
15.74
15.74
Pasillo de Circulacion
AMBIENTES
FECHA
30.04.13
MUROS Y
CIRCULAC.
AREA FINAL
M2
PRIMER PISO
MODULOS 1 ACADEMICO
ADMINISTRATIVO
PABELLON DE OFICINAS
ACADEMICO
ADMINISTRATIVAS
243.60
63.00
Muros y columnas
1
22.60
SEGUNDO PISO
266.40
15.75
15.75
20.46
20.46
20.29
20.29
31.90
31.90
Educacin Virtual
31.91
31.91
Educacin Virtual
19.58
19.58
31.90
31.90
Pasillo de Circulacion
63.00
Muros y columnas
SUMATORIA POR MODULO
31.60
17
329.80
180.20
PRIMER PISO
MODULOS 2
ADMINISTRATIVO
PABELLON DE OFICINAS
ADMINISTRATIVAS
99.18
15.75
15.75
Almacn
16.08
16.08
Unidad Planificacin
15.83
15.83
Unidad de Abastecimiento
15.83
15.83
Pasillo de Circulacion
25.65
Muros y columnas
1
10.05
SEGUNDO PISO
137.55
20.45
20.45
20.78
20.78
Estadstica e Informtica
15.75
15.75
Prestacin de Servicios
15.75
15.75
Pasillo de Circulacion
25.65
Muros y columnas
MODULO 3 ESCALERAS
PABELLON ESCALERAS
510.00
39.16
10
136.22
100.51
PRIMER PISO
33.15
33.15
236.73
33.15
SEGUNDO PISO
39.05
39.05
39.05
72.20
72.20
226.90
PABELLON A ACADEMICO
ADMINISTRATIVO
PABELLON B
ADMINISTRATIVO
AMPLIACION DE VEREDAS
PATIOS CENTRO
EXPERIMENTAL
OBRAS
COMPLEMENTARIAS
CERCOS
VEREDAS DE PROTECCION
CASETA DE CONTROL Y
GUARDANIA
CERCO PERIMETRICO
15.93
15.93
Deposito
10.44
10.44
Comedor
42.16
42.16
S:S:H:H (comedor)
4.55
4.55
25.15
25.15
Sala de Profesores
25.01
25.01
SS.HH.
7.17
7.17
S.H
2.69
2.69
S.H. Minusvalidos
4.11
4.11
Aula
50.59
50.59
Muros y columnas
11
187.80
187.80
39.10
Aulas
52.82
105.65
SS.HH.
22.28
22.28
39.10
PRIMER PISO
PABELLON DE AULAS
Cocina
148.75
Muros y columnas
226.90
20.82
127.92
54.30
20.82
148.75
108.84
108.84
108.84
Patio y Veredas
870.27
870.27
870.27
979.11
979.11
Caseta de control
10.09
10.09
10.09
Guardiania
17.25
17.25
17.25
54.30
27.34
211.16
27.34
211.16
AREA REQUERIDA m
2255.32
697.0 m
2255.3 m
2952.3 m
Creacin y equipamiento del pabelln administrativo y del centro de aplicacin de educacin bsica de la Facultad de Educacin en la Ciudad Universitaria de la Universidad Nacio
327.44
ALTERNATIVA 01
UNIDADES MODULOS
N DE
MODULOS
ESPECIALIDAD
PARCIAL
OBRAS INTERIORES
MODULO 1 ACADEMICO ADMINISTRATIVA
433,563.75
ESTRUCTURAS
193,200.75
ARQUITECTURA
103,523.63
INST. ELECTRICAS
115,107.00
INST. SANITARIAS
MODULOS 2 ADMINISTRATIVO
1
ESTRUCTURAS
89,679.24
ARQUITECTURA
48,053.23
INST. ELECTRICAS
53,429.96
INST. SANITARIAS
MODULO 3 ESCALERAS
10,087.66
61,379.03
ESTRUCTURAS
27,351.17
ARQUITECTURA
14,655.70
INST. ELECTRICAS
16,295.54
INST. SANITARIAS
3,076.62
192,889.71
ESTRUCTURAS
85,953.76
ARQUITECTURA
46,056.99
INST. ELECTRICAS
51,210.36
INST. SANITARIAS
MODULO B ACADEMICO DEL CENTRO EXPERIMENTAL
21,732.38
201,250.09
9,668.59
126,452.10
ESTRUCTURAS
56,348.44
ARQUITECTURA
30,193.44
INST. ELECTRICAS
33,571.81
INST. SANITARIAS
6,338.41
OBRAS EXTERIORES
VEREDAS FROTACHADAS Y BRUADAS
4,724.75
ARQUITECTURA
EXPERIMENTAL
SARDINELES Y RELLENO DE ARENA EN AREA DE JUEGO
AREA VERDE
75,723.52
ARQUITECTURA
CENTRO EXPERIMENTAL
75,723.52
6,438.27
ARQUITECTURA
1
6,438.27
15,366.90
ARQUITECTURA
CERCO PERIMETRICO DEL CENTRO EXPERIMENTAL
4,724.75
15,366.90
281,355.85
ESTRUCTURAS
253,029.65
ARQUITECTURA
28,326.20
OBRAS COMPLEMENTARIAS
CASETA DE CONTROL
8,577.93
ESTRUCTURAS
3,822.42
ARQUITECTURA
2,048.18
INST. ELECTRICAS
2,277.36
INST. SANITARIAS
GUARDIANIA
429.97
14,664.66
ESTRUCTURAS
6,534.73
ARQUITECTURA
3,501.53
INST. ELECTRICAS
INST. SANITARIAS
CABLEADO ESTRUCTURADO (INTERNET)
S/.
17,500.00
1,439,886.55
ESTUDIOS
EXPEDIENTE TECNICO (5%CD)
735.07
17,500.00
INST. ESPECIALES
COSTO DIRECTO (CD)
3,893.33
S/.
43,196.60
S/.
86,393.19
S/.
215,982.98
S/.
143,988.65
PARCIAL
S/.
1,929,447.98
IMPREVISTOS (5%)
S/.
96,472.40
S/.
86,825.16
PARCIAL 2
S/.
2,112,745.53
IGV (18%)
S/.
380,294.20
PRESUPUESTO TOTAL
S/.
2,493,039.73
A 01
%
100.00%
378.83
44.56%
202.99
23.88%
225.70
26.55%
42.61
5.01%
100.00%
44.56%
23.88%
26.55%
5.01%
100.00%
44.56%
23.88%
26.55%
5.01%
100.00%
44.56%
23.88%
26.55%
5.01%
100.00%
44.56%
23.88%
26.55%
5.01%
100.00%
100.00%
S/.
100.00%
100.00%
100.00%
0.02
99.66
119.52
33.2
112.31
112.31
0.755
0.90545455
0.25151515
0.85083333
0.85083333
2.24
1.6912
40.22 36.4173818
27.74 6.9770303
20.1
17.10175
22.62
19.24585
79.73
265.76
15.39
236.72
0.60401515
2.01333333
0.11659091
1.79333333
174.23 105.23756
27.8 55.9706667
258.31 30.1165977
35.83 64.2551333
72.78 0.55136364
189.75
1.4375
1665.92 12.6206061
403.26
222.3429
65.8
94.5875
4.04 50.9872485
2.85 0.02159091
43.83 0.33204545
99.29 0.75219697
287.81 6.21407955
58.59 19.4545432
4.04 3.03887576
379.68 2.87636364
6.28 0.04757576
92.04 264.740509
4.04 0.19220606
100.00%
100.00%
100.00%
100.00%
89.93%
10.07%
100.00%
44.56%
23.88%
26.55%
5.01%
100.00%
44.56%
23.88%
998.571032
26.55%
5.01%
100.00%
100.00%
588.58 4.45893939
155.79 1.18022727
185.79
1.4075
5.9 26.3077424
11.66
13.76145
14.66
20.63395
231.09 1.75068182
155.79 1.18022727
187.79 1.42265152
13.79 24.1419023
3.45 4.07178409
5.75 8.18024621
97.097075
8.4
3101.532
1,439,886.55
369.23
MODULOS
COSTOS
OBRAS INTERIORES
OBRAS EXTERIORES
OBRAS COMPLEMENTARIAS
ESTUDIOS
EXPEDIENTE TECNICO (5%CD)
SUPERVISION (6% CD)
GASTOS GENERALES (15% CD)
UTILIDADES (10% CD)
PARCIAL
IGV (18%)
EQUIPAMIENTO
IMPREVISTOS
PLAN DE MANEJO AMBIENTAL
1,015,534.67
383,609.29
40,742.59
S/.
43,196.60
S/.
86,393.19
S/. 215,982.98
S/. 143,988.65
S/. 1,929,447.98
S/. 347,300.64
S/. 183,297.56
S/.
96,472.40
S/.
86,825.16
PRESUPUESTO TOTAL
S/. 2,643,343.73
FASES
ETAPAS
Nov-13
Dec-13
Jan-14
Etapa 1
01 Expediente tecnico
FASE II
INVERSION
02
03
04
05
06
07
08
09
Etapa 2
Proceso de Contratacion
Ejecucin de Obras
Equipamiento
Supervisin
Gastos Generales
Utilidades
Imprevistos
Plan de Manejo Ambiental
X
X
Nov-13
02
03
04
05
06
07
08
09
Dec-13
Jan-14
50%
50%
Etapa 2
Proceso de Contratacion
Ejecucin de Obras
Equipamiento
Supervisin
Gastos Generales
Utilidades
Imprevistos
Plan de Manejo Ambiental
CRONOGRAMA
MESES
Feb-14
100%
15%
15%
15%
15%
15%
15%
10 Operacin y Mantenimiento
FASES
ETAPAS
Nov-13
Etapa 1
01 Expediente tecnico
FASE II
INVERSION
ETAPAS
Etapa 1
01 Expediente tecnico
X
X
X
X
X
10 Operacin y Mantenimiento
FASES
FASE II
INVERSION
CRONOGRAMA
MESES
Feb-14
02
03
04
05
06
07
08
09
Etapa 2
Proceso de Contratacion
Ejecucin de Obras
Equipamiento
Supervisin
Gastos Generales
Utilidades
Imprevistos
Plan de Manejo Ambiental
Dec-13
S/.
25,485.99
Jan-14
S/.
CRONOGRAMA
MESES
Feb-14
25,485.99
S/. 254,859.92
S/.
15,291.60
S/.
38,228.99
S/.
25,485.99
S/.
14,470.86
S/.
13,023.77
CRONOGRAMA
MESES
Mar-14
X
X
X
X
X
X
X
Apr-14
May-14
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AOS
1914-1925
10 aos
CRONOGRAMA
MESES
Mar-14
Apr-14
May-14
AOS
1914-1925
TOTAL
100%
25%
35%
40%
35%
35%
35%
35%
35%
25%
25%
25%
25%
25%
CRONOGRAMA
MESES
Mar-14
Apr-14
25%
60%
25%
25%
25%
25%
25%
May-14
100%
100%
100%
100%
100%
100%
100%
100%
100%
AOS
1914-1925
TOTAL
S/.
S/. 424,766.53
50,971.98
S/. 594,673.14
S/. 424,766.53
S/. 1,699,066.13
S/.
73,319.02
S/. 109,978.53
S/.
183,297.56
S/.
25,485.99
S/.
35,680.39
S/.
25,485.99
S/.
101,943.97
S/.
63,714.98
S/.
89,200.97
S/.
63,714.98
S/.
254,859.92
S/.
42,476.65
S/.
59,467.31
S/.
42,476.65
S/.
169,906.61
S/.
24,118.10
S/.
33,765.34
S/.
21,706.29
S/.
94,060.59
S/.
21,706.29
S/.
30,388.81
S/.
21,706.29
S/.
86,825.16