A

SEE SCHED.
T.O.P
MID
DL E

PO

HIG
HE
ST
PO
INT

INT

SEE SCHED.
T.O.R.S

SEE SCHED.
T.O.R.S

TOP OF TANK

GENERAL NOTES:

TOP OF TANK

1.0 ALL DIMENSIONS ARE IN MILIMETERS (mm),


OTHERWISE NOTED.
2.0 ALL STRUCTURAL STEEL SHAPES, PLATES
FY = 250 Mpa
BARS ASTM A36
FY = 240 Mpa
PIPES ASTM A53
TUBES ASTM A500 FY = 269 Mpa
FY = 250 Mpa
ASTM A501
OR

750

3.0 BAY SIZE FOR SCAFFOLDING NOT TO EXCEED


1.80METERS , UNLESS OTHERWISE NOTED.
4.0 CAPACITY OF DIA. O 48.3 X 3.2 mm THICK PIPE
CONSIDERED 40 KN IN COMPRESSION FOR
UNSUPPORTED LENGTH OF 1.5 m.
5.0 MAXIMUM LIFT HEIGHT = 1.5 m.
200

6.0 LIVE LOAD CONSIDERED = 1.50 KN/m2

SEE SCHED.
T.O.F.S (4rth)

BOTTOM OF TANK

7.0 CONCRETE DENSITY = 25 KN/m3

8.0 SELF WEIGHT OF FORM WORK = 0.50 KN/m2

ST
PO
IN

SEE SCHED.
T.O.F.S (4rth)

LO

WE

9.0 DESIGN OF WHITE WOOD & PLYWOOD AND


ITS SHUTTERING IS THE RESPONSIBILITY OF
CONTRACTOR.
10. PROVISION OF BRACING AND TYING OF
TUBES SHOULD BE THE RESPONSIBILITY
OF CONTRACTOR AS PER SITE CONDITION.

11. PORTIONS / AREAS NOT COVERED BY


SCAFFOLDINGS SHOULD BE SUPPORTED
BY THE CONTRACTOR AS PER SITE.

SCAFFOLDING LEGEND:

.......... UNIVERSAL HEAD (U-HEAD)


SHOWN IN PLAN

.......... DROPHEAD SHOWN IN PLAN


.......... STEELPROPS SHOWN IN PLAN
.......... HORIZONTAL LEDGERS (SOLID
LINE) SHOWN IN PLAN

SEE SCHED.
T.O.T.S(3rd)

.......... SCAFFOLD TUBES (HIDDEN


LINE) SHOWN IN PLAN

DLE

.......... H20 TIMBER BEAM

.......... ADJUSTABLE U-HEAD

MID

HE
HIG

SEE SCHED.
T.O.T.S(3rd)

PO

ST
PO
IN

INT

.......... ADJUSTABLE DROPHEAD


(RAISED POSITION)

SB(350x800)

.......... ADJUSTABLE DROPHEAD


(STRUCK POSITION)
.......... ADJUSTABLE BASE JACK

OPEN

.......... CUPLOCK FOR STD & LEDGER

50

x8
0

0)

OPEN

OPEN

.......... CANTILEVER FRAME

SB(350x800)

SB
(3

.......... BEAM BRACKET


200

SEE SCHED.
T.O.S.S(2nd)

SEE SCHED.
T.O.S.S(2nd)

.......... STEEL PROP ELEVATION

LO

WE

ST

PO

INT

.......... VERTICAL STANDARD

FORMWORK-SCAFFOLDING-PROPS

CONSULTANT:

L
VA ON
O
R
PP UCTI
A
OR NSTR
F
O
UED OR C
S
IS T F
NO

CLIENT:

SEE SCHED.
T.O.F.S (1st)

SEE SCHED.
T.O.F.S (1st)

AL OFOQ CO.

HIG

HE

MID

ST

DLE

PO

PO

INT

INT

PROJECT:

ELEVATED TANK

OPEN

OPEN
DRAWING TITLE:

200

SEE SCHED.
F.G.L

SEE SCHED.
F.F.L

TP
OIN

SCAFFOLDING PLAN & SECTION

DRAWN BY :

LO
W

ES

SCALE :

COMPACTED
SOIL

COMPACTED
SOIL

RRL

SECTION B
DESIGNED BY :

SCAFFOLDING PLAN

SEE SCHED
B.O.R
EX.L
SEE SCHED

TECHNICAL DEPT.

RAFT FOOTING

AS SHOWN

DATE :

28 FEBRUARY 2015

RAFT FOOTING

CHECKED BY :

SECTION A

DWG.NO:

ENGR. AA SAIF

TECHNICAL MANAGER :

ENGR. AA SAIF

SCR-0215-17

SHEET NO :

1 OF 1