ENVIRONMENT
SYSTEM
CLIENT
: 200
DESCRIPTION
: Production Version
PREPARED BY
NAME
DATE
TEAM
: Production Planning
DATE
TEAM
: Production Planning
Page 1 of 9
Menu Path
T.Code
MM02
2. Input Data
1. Enter the Input parameters, which need to be given by the user during the testing of this
scenario.
2. Input the value for the fields and then if required, copy the screen shot of the input screen
after the table.
3. If the scenario has multiple screen inputs, which needs to be processed, repeat the step 2
for every screen.
2.1
Production version is maintained in MRP 4 & Work Scheduling View. Below is the screen
shot
Page 2 of 9
After selection of the views, provide the plant in which the material is maintained
Description of the
Field
Material
Plant
Press on
2.2
Nature of the
Field
Mandatory
Mandatory
Tab
Screen 1:
Click
button
Page 3 of 9
Page 4 of 9
Description of the
Field
Version ID
Version Text
Valid from
Valid to
Detailed planning
Task List Type
Nature of the
Field
Mandatory
Mandatory
Mandatory
Mandatory
4 Char
40 Char
Date
Date
Optional
N Routing
Group
Optional
Group Counter
Optional
Alternative BOM
Optional
BOM usage
Optional
Defined in Routing
Master
Defined in Routing
Master
Defined in BOM
Master
Defined in BOM
Master
Page 5 of 9
Planning data
Group & Group counter are keys defined in the Routing Master for the Material in the Plant.
Use the same Group & Group Counter so that the Routing is selected in this Production
version '1000'
Bill of Material
Alternative BOM if there are no. of BOMs then specify which BOM needs to selected.
BOM usage depending upon usage, one can specify for particular Production version,
which usage needs to be used.
After entry of Routing & BOM details, we can check for errors, if any.
Please click
Check for Status
Page 6 of 9
Status
The above status shows for error in relation to Routing & BOM details provided, such Group /
group counter / Alternative BOM / BOM usage.
Depending upon the correction in the above field, again do check
Following message will be displayed
Page 7 of 9
3. PROCESS GUIDELINES
While creation of Production order, one can specify which Production version needs to be selected,
so that correct BOM & Routing is assigned to Order
Follow procedure defined:In order creation screen, go to Functions Read PP master data
Page 8 of 9
Select the appropriate Production version, in same order creation screen, Master data tab, the
selected version will appear.
Page 9 of 9