Sie sind auf Seite 1von 3
Aled aciuaitly jlall A 4c National Gas & Indust. Co. L.P.Gas Tanks Installation Instructions & Terms The Best Choice of Gas Supply, Comfortability & Safty Customer Services 920009911 ©) WWW.gasco.com.sa info@gasco.com.sa 1-the Horizontal Distance between tank and buildings or holes or direct sparks sources uch as power breaker, water pump, air-conditioner and indirect sources such as lighting keys, electric lamps, ventilation fans and between tanks with each other as shown in the following table: = 2 nd r) a 5 i 2 3 é He 0 IF F a) i Pi 5 Pa} of a i RB & |e ry 4 iy is a Zo . < o 868 ce ry oy be] is | 5 ce ig Fy | BiG ao Es Fy ae 4 i F 8 | a 5 Pelee lege ze fH || fd . te | tee gz Less than 500 filled in the 3 = = 6 1.5 - same location 500 - 1000 3 3 - 6 3 1 1001 - 2000 3 3 a 6 3 1 2001 - 7500 75 75 75 | 7.5 75 1 7501 - 100000 15 15 15 15 15 2 100001- 270000 15 23 23 23 15 2 *Distances shown above are measured form safety valve & filling group 2-Itis not allowed absolutely to install tanks inside or above occupied building. 3-Recessions shortage required in item (1) can be compensated through building blank wall made of noninflammable materials with dimensions achieving the required recession after getting aproved from GASCO. 4-\t is not allowed to install tanks outside fences except in case of building separate room for tank roofed with noninflammable grid and make good ventilation. 5-Tanks assigned for use above ground level may not be installed in low places allowing accumulation of gas or any inflammable liquids. 6-Tank may be installed in recessions less than those stated in item (1) regarding holes and indirect spark sources if higher than the level of the highest point in the tank by min. distance (2) meter. 7-It is necessary to make earthing joint for tanks capacity of 2001 liters and more for protection against static power charges accumulation on their bodies. 8-Ground on which tank is installed should be solid “ concrete or tile ” and in case of installing the tank in dusty area, it is necessary to make concrete base for tank its dimensions are tank length x diameter and with height of 10 cm. 9-Distance separating between tank body and its adjacent wall should not be less than 10 cm. 10- Itis not allowed to make any ceilings over tanks whose height is less than 3 meters also such ceilings should be made of noninflammable materials and under ceiling should be opened fully from all sides and possible elimination. 11- Tank Location must be is nearst from the outside door to give us more advantage to installation, filling and maintenance 12- It is necessary to select tank location so that to enable connection of filling hose without need to passing inside the building in narrow passages whose width less than 1.5 meters. 13- It is necessary to remove all inflammable materials such as dry grasses, plastic, rubber and wooden materials existing within the limits of recessions contained in item (1) 14- It is not allowed to buried the tanks unless they are assigned for this purpose. 16- It is necessary to take into consideration instructions related to buried tanks installation and installation and buying process shall be made by supervision of tank supplier. 16- The liquid gas filing hose should not pass through rooms and buildings. 17- Diameters of gas laying in homes should not be less than that shown in the following table Peas couneu a We suggest to study every case separatly. 18- Low pressure regulator to be fixed in output pressure not more than 35 ml bar (0,5 pound / sq inch) on home tanks if laying length is more than 20 meters and temperatures average over the year is not less than 20, however if laying lengths increased more than 20 meters or temperature average decreased over the year than 20, first phase high pressure regulator should be installed along with installing low pressure second phase regulator at the end of each laying in vertical position prior entering the building. 19- Buildings inside gas pressure should not be more than 1,378 bar (20 pounds / sq inch) 20- Gas laying shall be inspected after completion of their installation by compressed with air up to 3.5 bar (50 pounds / sq inch) for one hour and observing pressure stability thereafter and using water and soap foam to detect any leakages. 21- Gas laying to be pained with yellow color as well as spigots and to show gas flow direction in the pipes in arrows along with installing spigot at each gas output or branch to closed when necessary.

Das könnte Ihnen auch gefallen