ACTIVITY SCHEDULE FOR BRIDGE CONSTRUCTION

DAYS
S. No. Activities Time
10 20 30 40 50 60
PLANNING
1 Mobilization and Data Collection

2 Reconnaissance Survey.

3 Inception Report

SURVEYS
1 Detailed Topographic Survey

2 Soil Survey

3 Material Investigation

4 Condition Survey

5 Hydrological Survey

6 Enviromental Impact Study

7 Traffic Data / Assessment

8 Report

PRELIMINARY ENGINEERING
DESIGN
1 Road Geomateric Design

2 Pavement Design

3 Road Drainage

4 Structures

5 Land Acquisition Plans

6 Preliminary Design

DETAILED ENGINEERING
1 Drawing Preparation

2 Engineer's Estimate

3 Tender Documents
PERSONNEL SCHEDULE
Sr. Name Designation DAYS
KEY STAFF 10 20 30 40 50 60
1 Mushtaq Ahamd Team Leader

2 Shaukat Ali Ayub Bridge Design Specialist

3 Muhammad Zahid Khan Principal Design Engineer

4 Niaz Mohammad Hydrological Specialist

5 Sharif Ullah Senior Hydrologist

6 Naseer Mohammad Khan Geotech Specialist

7 Amir Syed Muhammad Principal Geotechnical Engineer

8 Muhammad Karim Khan Transportation Specialist

9 Gul Sayed Senior Highway Design Engr.

10 Shahzad Afzal Khan Enviromental Specialist

11 Habib Ullah Khan Contract Specialist

12 Abdul Haq Khan Principal Quantity Engineer

SUPPORT STAFF
13 Babar Khan Admin Manager

14 Niaz Muhammad Khan Chief Surveyor

15 Zain Ul Wahab Surveyor

16 Muhammad Tanveer Surveyor

17 Shafiq Ahmad Surveyor

18 Hamayun Khan Surveyor

19 Iftikhar Abbass CAD Mapping Specialist

20 Raheel Aziz CAD Operator

21 Shahazd Saddiqui CAD Operator

22 Faisal Saddiqui CAD Operator

23 Irfan Abbass CAD Operator

24 Abid Latif Material Supervisor

25 Iftikhar Ullah Lab Technician

26 Shahid Ahmad Lab Technician

27 Shaffiq Ahmad Lab Technician