REFURBISHMENT PROCESS PRE-REQUIREMENTS AND PROCESS
There are some Prerequisites that need to be done before
creating refurbishment order.......
Refurbishment is always done for a Material, so even if you
are doing refurbishment for your material or machine, it must have a material master with Split Valuation.
Split Valuation means Splitting condition of your
material.......for PM mostly used Valuation Category is Condition based in which different valuation types like Old, Refurbished & New are used.
Settlement Profile for Refurbishment order should have
Material as default object type as Refurbishment order should always settle to Material. Then only Refurbishment will happen. If you want to get it serialized also then serial no. settings is to be done at material level. 1. Process for refurbishment is as follows.... 2. Dismantle Your Equipment / Material & put it back into store by movement type 202. 3. Create a Refurbishment Order - Mention the condition of equipment in Refurbishment sub screen.(means u r upgrading ur material from which condition to which condition through refurbishment) 4. Issue the material from the store for your Order by movement type 261. 5. Do the operations. 6. Deliver the material back into the store using movement type 262 or 101. 7. See the status of order; it should have material delivered status. 8. Now you can close your order as per other maintenance orders. PROCESS:
1)First create asset as an Equipment(with serial number) which is
installed in Functional location. 2)Dismantled the equipment. 3)Do MIGO(Goods receipts against other with 202 movement type)--So stock will be generated. 4)Transfer material to Vendor(Movement type 541) 5) Receipt material from vendor (Movement type 542) 6) Create Refurbishment order. 7) Enter the external operation (Control key PM03),PR will be generated 8)Convert PR to PO. Accept Entry sheet. 9)Goods receipt for refurbishment( IW8W) 10) Confirm the Order.