Various Infrastructure Projects ACCOMPLISHED

by Congressman Roque R. Ablan, Jr.


in support of the Program of President Gloria Macapagal-Arroyo
1. Improvement of Laoag International Airport (Special Allotment Release Order
with DPWH)
a) Construction of Terminal Building of the Laoag International Airport
(Arrival Area)
b) Construction of Runway Extension of the Laoag International Airport
c) Construction of Extension of Turn Around Pad at Runway 01, Laoag
International Airport
d) Construction of Concession Building, Laoag International Airport
e) Concreting of Vehicular Parking Area, Laoag International Airport
f) Concreting of access road from terminal building to the transmitter
facility
g) Installation of 7 Aircon Units at Laoag International Airport
h) Construction of Portable Cat Walk
AIRPORT ROAD LAOAG CITY

NAME OF PROJECT/LOCATION
1.

Concreting of Road and


Pavement infront of Laoag Airport,
Brgy. Gabu, Laoag City
2.
Allocate funds for additional
capital (SERVIAM)
3.
Const. of MPB Beside Laoag
Airport, Gabu
4.
Continuation of MPB Laoag
Airport Gabu

5.

Const. of MPB near Laoag


International Airport

1. Const. of Multi-Purpose Bldg. Brgy.


Gabu (Beside Laoag Airport
Terminal)

PROJECT
COST

SARO/SAA
NO.

DATED

1,000,000.00

A-01-03686

Oct. 16, 2001

200,000

A-05-04223

June 2006

150,000

A-05-04223

June 2006

350,000

A-06-02033

Completed

1,080,000

Unknown SARO

Completed

20,000.00