1.00 m
1.00 m
LONGITUDINAL BARS SPACED
AT 200 MM O.C.C.
12 mm O
LIFT BARS
MANHOLE
MANHOLE
1.50 m
MANHOLE
4'' O x 4'' O
UPVC PIPES
PIPES SHALL BE INSTALLED AS PER PLAN ANY REGULATION OR REVISION SHALL HAVE
PRIOR. APPROVAL FROM THE ARCHITECT, ENGR. OR MASTER PLUMBER WHO DESIGNED
THE PLANS.
4'' O x 4'' O
UPVC PIPES
0.60 m
12 mm O
LIFT BARS
12 mm O
LIFT BARS
0.60 m
0.10 m
0.10 m
0.40 m
0.10 m
0.10 m
0.60 m
LEGEND
0.10 m
SV
10 mm HORIZONTAL BARS
SPACED EVERY THIRD LAYER
OF C.H.B
INLET
0.90 m
DIGESTIVE CHAMBER
FIRST
LEACHING
CHAMBER
10 mm VERTICAL BARS
SPACED AT 200 mm O.C.C.
SECOND
LEACHING
CHAMBER
SEPTIC TANK
0.10 m
0.35 m
AIR SPACE
0.60 m
0.30 m
OUTLET TO CANAL
GT
GREASE TRAP
FB
FLOOR DRAIN
CB
CATCH BASIN
WATER METER
SHOWER
LUNETA PARK
CO
FAUCET
PAGAS ST.
FB
FOOT BATH
BONIFACIO ST.
THE
SITE
ACLO ST.
4.00 m
SEWER SYSTEM
0.05 m
CLEAN OUT
0.10 m
LAV. LAVATORY
0.20 m
WATER CLOSET
WATER LINE
LOCATION MAP
0.30 m
CB
CB
CB
CB
CONNECT TO FIRST FLOOR
(WATER LINE)
SEPTIC TANK
WC
CB
CB
CB
CB
LAV.
CB
CB
C.O.
CONNECT TO SECOND FLOOR
(WATER LINE)
CB
CB
CB
CB
C.O.
CB
CB
CB
C.O.
CB
LAV.
SEPTIC TANK
LAV.
CB
F
F
CB
CB
C.O.
CB
CB
CB
CB
CB
CB
STUDENT:
EXERCISE:
PROJECT TITLE:
SPEED
EVALUATED BY:
O
CHN
1969
1975
OL OG
Y
1955
UR
G AO C IT
R I G A O ST A
L L E GE
TE
SU
CO
SCALE 1:100
SCALE 1:100
ISOMETRIC DIAGRAM
NEATNESS