Sie sind auf Seite 1von 1

SPECIFICATIONS

SPACED AT 200 mm O.C.C.


2.00 m

1.00 m

1.00 m
LONGITUDINAL BARS SPACED
AT 200 MM O.C.C.

LONGITUDINAL BARS SPACED


AT 200 MM O.C.C.

ALL PLUMBING WORKS INCLUDED HERE IN SHALL BE EXECUTED ACCORDING TO THE


LATEST EDITION OF THE PHILIPPINE PLUMBING CODE. THE NATIONAL BUILDING CODE
AND THE RULES AND REGULATION OF MUNICIPAL OR CITY.

12 mm O
LIFT BARS

MANHOLE

MANHOLE

1.50 m

MANHOLE

ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND MUST APPROVED


TYPE OF PARTICULAR LOCATION AND INTENDED PURPOSE.
ALL PIPES PASSING THRU WALLS OR FLOORS SHALL HAVE BE PROPERLY CORRECTED
AGAINST BREAKAGE.

4'' O x 4'' O
UPVC PIPES

PIPES SHALL BE INSTALLED AS PER PLAN ANY REGULATION OR REVISION SHALL HAVE
PRIOR. APPROVAL FROM THE ARCHITECT, ENGR. OR MASTER PLUMBER WHO DESIGNED
THE PLANS.

4'' O x 4'' O
UPVC PIPES

CATCH BASIN PLAN

SEPTIC TANK PLAN


0.60 m

0.60 m

12 mm O
LIFT BARS

12 mm O
LIFT BARS

0.60 m

0.10 m

0.10 m

0.40 m

0.10 m

0.10 m

0.60 m

LEGEND
0.10 m

SV

10 mm HORIZONTAL BARS
SPACED EVERY THIRD LAYER
OF C.H.B

INLET

0.90 m

DIGESTIVE CHAMBER

FIRST
LEACHING
CHAMBER

10 mm VERTICAL BARS
SPACED AT 200 mm O.C.C.

SECOND
LEACHING
CHAMBER

SEPTIC TANK

0.10 m

0.35 m

AIR SPACE

0.60 m

0.30 m

GREASE TRAP PLAN

OUTLET TO CANAL

GT

GREASE TRAP

FB

FLOOR DRAIN

CB

CATCH BASIN

WATER METER

VTR VENT THRU ROOF

SHOWER

LUNETA PARK

CO

FAUCET

PAGAS ST.

FB

FOOT BATH

BONIFACIO ST.

THE
SITE

ACLO ST.

4.00 m

SEWER SYSTEM

0.05 m

CLEAN OUT

0.10 m

LAV. LAVATORY
0.20 m

CATCH BASIN SECTION

WATER CLOSET

WATER LINE

LOCATION MAP

SEPTIC TANK SECTION

0.30 m
CB

CB

CONNECT TO SECOND FLOOR


(WATER LINE)

CB

NOT DRAWN TO SCALE

CB
CONNECT TO FIRST FLOOR
(WATER LINE)

CONNECT TO SECOND FLOOR


(WATER LINE)

SEPTIC TANK

WC

GREASE TRAP SECTION

CONNECT TO FIRST FLOOR


(WATER LINE)

CB

CB

CB

CB

CONNECT TO FIRST FLOOR

LAV.
CB

CB

C.O.
CONNECT TO SECOND FLOOR
(WATER LINE)

CB

CONNECT TO FIRST FLOOR


(WATER LINE)

CONNECT TO SECOND FLOOR


(SOLID WASTE PIPE)

CONNECT TO SECOND FLOOR

CONNECT TO FIRST FLOOR


(SOLID WASTE LINE)

CB

CB

CB
C.O.

CB

CB

CB

C.O.

CB
LAV.

SEPTIC TANK

LAV.
CB

F
F

CB

CB

C.O.

CB

CB

CB

CB

CB
CB

FROM THE WATER SOURCE


(SMWD)

GROUND FLOOR WATERLINE AND DRAINAGE PLAN

STUDENT:

EXERCISE:

PROJECT TITLE:

SPEED

EVALUATED BY:

O
CHN

1969

1975

OL OG
Y

PROPOSED TWO STOREY


RESIDENTIAL BUILDING

OCAMPO, MARY KRISTELLE L.

1955

UR

G AO C IT

R I G A O ST A

L L E GE

TE

SU

CO

SCALE 1:100

SCALE 1:100

SECOND FLOOR WATERLINE AND DRAINAGE PLAN

FROM THE WATER SOURCE


(SMWD)

ISOMETRIC DIAGRAM

NEATNESS
LEGIBILITY

ARCH. MARLON C. SOLLOSO

BSCE - 3A

STARTED:

FINISHED:

ACCURACY

INSTRUCTOR

RATING

Das könnte Ihnen auch gefallen