Beruflich Dokumente
Kultur Dokumente
min. 1.50 m
min. 2.50 m
40
Front Elevation
60
15 Bulldog Grips
70
HRC Elevation
70
Details of CSM Tower
.................
12 3 Stirrups
10
16
20
25
10
40
WC Elevation
.................
Tower
Foundation
10
Erection Hook
13
3 Stirrups 10
11
Anchor Rods 25
65
150
100
150
300
Tower
Foundation
Hard
Rock
RCC diameter
Walkway Cable
20
14 Bulldog Grips
of Drum
Erection
Hook
Handrail Cable
20
Plan
View
Walkway Cable
Hard
Rock
Handrail Cable
65
Anchor Rods
Ribbed Tor steel 25mm
drill holes as shown in table
volume per hole = 0.002m3
Anchore Rods to be grouted
in cement mortar 1:1
100
65
50
Total
Required
Stirrups 10 mm
Volume Anchor Rods
Quantities
cutting bending weight S t a n d a r d
of Drum
25 mm
dia
kg/pc
nos length
Type of construction [m3]
[m3]
[nos]
[mm]
[mm]
[kg]
0.40*
8*
6*
2270
530
1.40
*for 2 Drums
Walkway
Cable 26
100
85
0.40
3370
880
2.08
or
Cable
32
Produced by
Chisel dressed
Stone Masonry 1:4
20Dcon 70 or
20Dcon106
Hammer dressed
Stone Masonry 1:6
10.27
Hammer dressed
Dry Masonry
2.02
Nepal
110
0.65
12
15.40
4150
1130
2.56
Concrete 1:3:6
0.41
Broken stones
11.13
diameter
Cement
[bags]
Concrete 1:2:4
125
1.80
Scale 1 : 50
of rod holes
10
26
32
5
6
15
20
Bank :
Span
Construction Drawing:
...........
Swiss Association for International Cooperation, in partnership with His Majestys Government of Nepal, funded and supported by the Swiss Government (SDC Nepal).
44