Sie sind auf Seite 1von 4

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq.

ALBERTO ANTONIO ROJAS TORRES

Listado de Insumos
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y
GUZMAN DE HUNTER, AREQUIPA"

Obra
Sub Presupuesto

01 - CONSTRUCCION DE TALLERES 01

Cliente
Ubicacion

GOBIERNO REGIONAL DE AREQUIPA


HUNTER - AREQUIPA - AREQUIPA

IU Cdigo

Descripcin

Costo a :

Unidad

Abril - 2013

Cantidad

Precio

Parcial

823.03
6.27
7,240.88
3,432.77
4,912.10

17.69
15.22
16.08
13.79
12.43

14,559.40
95.43
116,433.35
47,337.90
61,057.40

MANO DE OBRA
47 00007
47 00032
47 00008
47 00009
47 00010

CAPATAZ
TOPOGRAFO
OPERARIO
OFICIAL
PEON

HH
HH
HH
HH
HH

239,483.48
MATERIALES
01 03432
02 00714
02 00708
02 00381
02 03790
02 00384
02 01680
02 01349
02 00703
02 00709
02 03638
02 03448
02 03637
02 03447
02 03792
03 02371
04 00055
04 00044
04 02557
04 00300
05 00003
05 01013
05 01356
05 00725
06 03820
06 02559
08 03750
10 03734
12 03576
12 03744
12 03735
12 03500
12 03407
12 02501
12 01298
12 03748
12 03473
12 01740
12 03620
12 03294
12 03635
17 00749
17 01479
17 02281
19 03742
19 03743
19 03791
19 03814
19 03821
21 00004
24 03727
24 01421
24 01545
24 00574
P.1/4

ACEITE PARA MOTOR SAE


ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO RECOCIDO # 8
CALAMINA 0.18 MM X 1.80 X 0.81 M
CANTONERIA DE ALUMIONIO ESTRIADO 2''X1 1/8''
CLAVOS PARA CALAMINA
CLAVOS PARA MADERA C/C 2 1/2"
CLAVOS PARA MADERA C/C 2"
CLAVOS PARA MADERA C/C 3"
CLAVOS PARA MADERA C/C 4"
PERNOS DE 1/4" x 2" CABEZA HEXAGONAL
TUBO DE ACERO INOX. DE 1 1/2" E=1.20mm
TUBO DE ACERO INOX. DE 1 1/4" E=1.20mm
TUBO DE ACERO INOX. DE 2" E=1.20 mm
VARILLA DE FIERRO LISO 1/2"
ACERO CORRUGADO FY=4200 KG/CM2 (GRADO 60)
ARENA FINA
ARENA GRUESA
THORGEL x 5KG
TIERRA DE CHACRA O VEGETAL
AGUA
PIEDRA CHANCADA DE 1/2" Y 3/4"
PIEDRA GRANDE DE 8"
PIEDRA MEDIANA (MX 3")
CABLE DE COBRE DESNUDO 25 mm2
CONECTORES PARA VAR. TIERRA
TABLERO TRIFASICO DE 40 POLOS
REGISTRO DE BRONCE DE 2"
ARTEFACTO FLUORECENTE 2X36W LED, INC
PORTA LAMP. Y REJILLA
ARTEFACTO FLUORECENTE HERMETICA 2X36W
LED, INC PORTA LAMP.
CAJA PASE GALV. 200x200x100 mm.
EQUIPO AUTONOMO DE LUZ EMERGENCIA/ DOS
LMPARAS DE 20W LED
INTERRUPTOR BAKELITA X 1 SWITCH
INTERRUPTOR BAKELITA X 2 SWITCH
INTERRUPTOR CONMUTACION SIMPLE
INTERRUPTOR TERMODIFERENCIAL 30 mA
INTERRUPTOR TERMOMAGNETICO 2x15A
INTERRUPTOR TERMOMAGNETICO 2x20A
INTERRUPTOR TERMOMAGNETICO 3x40A
PLACA PARA 02 SALIDAS DE TELEFONO MAGIC
TOMACORRIENTE DOBLE L/T TIPO LEVITON
LADRILLO K.K. DE ARCILLA 9X14X24 CM
LADRILLO P/TECHO DE 15x30x30 CM 8 HCOS.
LADRILLO PASTELERO 24 X 24 X 3 CM
CABLE NH-80, 2.5 mm2
CABLE NH-80, 4 mm2
CONDUCTOR TIPO N2XH 1x16 mm2
CONDUCTOR TIPO NH-80 1x2.5 mm2
CONDUCTOR TIPO NH-80 1x4 mm2
CEMENTO PORTLAND TIPO IP (42.5KG)
CERAMICA 20x30 CM.
CERAMICA ANTIDESLIZANTE 30x30 CM.
CERAMICA ANTIDESLIZANTE 40x40 CM.
CRUCETA

GLN
KG
KG
PLN
M
KG
KG
KG
KG
KG
und
M
M
M
UND
KG
M3
M3
KG
M3
M3
M3
M3
M3
M
PZA
UND
PZA
UND

2.60
1,303.90
345.94
33.91
45.11
30.00
1.36
5.38
477.70
0.18
25.10
13.81
92.24
78.26
23.42
22,970.23
49.20
125.06
1.50
1.80
85.73
178.21
20.36
4.43
15.76
2.00
1.00
2.00
67.00

30.00
4.15
4.15
16.90
8.50
7.55
4.15
4.15
4.15
4.15
6.50
60.00
55.00
75.00
40.50
2.94
63.00
53.00
64.70
25.00
1.68
91.00
62.00
62.00
8.50
5.50
456.00
12.50
168.50

78.00
5,411.19
1,435.65
573.08
383.44
226.50
5.64
22.33
1,982.46
0.75
163.15
828.60
5,073.20
5,869.50
948.51
67,532.48
3,099.60
6,628.18
97.05
45.00
144.03
16,217.11
1,262.32
274.66
133.96
11.00
456.00
25.00
11,289.50

UND

16.00

175.90

2,814.40

UND
PZA

3.00
15.00

8.52
190.50

25.56
2,857.50

UND
UND
UND
UND
PZA
PZA
PZA
UND
UND
UND
UND
UND
M
M
M
M
M
BOL
M2
M2
M2
UND

7.00
6.00
2.00
3.00
6.00
4.00
1.00
5.00
24.00
11,615.14
3,860.88
6,552.00
1,785.88
588.03
336.63
26.40
13.21
2,797.27
16.27
24.32
62.48
1,069.78

8.90
10.56
15.50
154.00
45.80
45.80
134.52
18.91
11.60
0.98
2.90
2.10
1.95
3.45
17.15
1.95
3.45
20.35
24.50
25.90
25.40
0.15

62.30
63.36
31.00
462.00
274.80
183.20
134.52
94.55
278.40
11,382.84
11,196.55
13,759.20
3,482.47
2,028.70
5,773.20
51.48
45.57
56,924.44
398.62
629.89
1,586.99
160.47

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Listado de Insumos
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y
GUZMAN DE HUNTER, AREQUIPA"

Obra
Sub Presupuesto

01 - CONSTRUCCION DE TALLERES 01

Cliente
Ubicacion

GOBIERNO REGIONAL DE AREQUIPA


HUNTER - AREQUIPA - AREQUIPA

IU Cdigo
24 03728
24 01422
24 00464
26 00871
26 00704
26 03729
29 03443
30 00830
30 01358
30 03714
30 03442
30 03453
30 01424
30 03495
30 03437
30 01384
30 03444
30 01385
30 00718
34 01511
38 00006
39 03726
39 03722
39 03489
39 03724
39 03445
39 03488
39 01390
39 01543
39 03725
39 00820
39 03721
39 03723
43 01359
43 00712
43 00072
43 00063
43 00477
43 00711
43 00620
44 00719
44 00713
44 00705
45 00706
51 02297
51 03506
51 02295
51 02298
53 01353
54 00478
54 00090
54 00125
54 03433
56 03639
56 00737
60 01481
65 01447
65 03636
65 01498
68 03829
72 00929
72 01441
P.2/4

Descripcin
LISTELO 20 x 8 CM.
PEGAMENTO P/CERAMICO 25 KG
PORCELANA
BISAGRA ALUMINIZADA CAPUCHINA 4" X 4"
BISAGRAS DE FIERRO DE 3"
CERRADURA TIPO PARCHE 2 GOLPES
ELECTRODOS DE TUNGSTENO
ADITIVO CURADOR DE CONCRETO
ADITIVO DESMOLDANTE DE MADERA
EXTIGUIDOR DE POLVO QUIMICO DE 12 KG
LAMINA DE SEGURIDAD P/VIDRIO
POLICARBONATO ALVEOLAR e=6mm INC.
ACCESORIOS
RODOPLAST 6mm
SEALES DE SEGURIDAD Y EVACUACION
(REFLECTIVOS)
SIKAFLEX 11 FC PLUS O SIMILAR
SILICONA x 300 ML VDR ALM
SOLDADURA TIG DE 1/16"
VIDRIO IMPORTADO INCOLORO 3mm
YESO DE 28 Kg
GASOLINA
HORMIGON
CAPACITACIN EN SEGURIDAD Y SALUD
COMEDOR PROVISIONAL P/PERSONAL
CORTAVIENTOS P/CASCO
ELABORACIN, IMPLEMENTACIN Y
ADMINISTRACIN DEL PLAN DE SEG
ESPONJA P/ PULIR INOX.
FRANELA
LIJA PARA MADERA
PAGO DE SERVICIO DE AGUA
SEALIZACIN TEMPORAL DE SEGURIDAD
SERVICIO ENERGIA ELECTRICA
SERVICIOS HIGIENICOS PROVISIONALES
P/PERSONAL
VESTUARIOS PROVISIONALES P/PERSONAL
ANDAMIO DE MADERA
BANNER DE 3.60m x 2.40 m
COLA SINTETICA
MADERA CEDRO
MADERA DE CEDRO CEPILLADO
PALO DE EUCALIPTO DE 5" x 4 m
REGLA DE MADERA
ESTACA DE MADERA
MADERA TORNILLO CEPILLADA
TRIPLAY DE 4'x8'x 6 mm
MADERA TORNILLO INC.CORTE P/ENCOFRADO
ANGULO 1"x1"x1/8" x6m. AREQUIPA
CAJA METALICA PRE FABRICADAS INC. TAPA
PLATINA DE FIERRO 1/2" x 1/2" x 6m
TEE 1"x1"x1/8" x6m. A. AREQUIPA
PETROLEO
BARNIZ
PINTURA ANTICORROSIVA
PINTURA LATEX SAT 1GL
SELLADOR DE PARED
PLANCHA ACERO 2"x1/4"
SOLDADURA CELLOCORD 1/8 "
TEKNOPOR DE 1" x 4' x 8'
CAJA DE CONCRETO PARA REGISTRO 0.60x0.30 M.
H=0.60 M.
MARCO CON TAPA DE 40 X 40 cm
NIPLE FG 1/2" x 1 1/4"
VARILLA DE COBRE D=3/4" X 2.40 m.
CINTA TEFLON
CODO PVC SAL 2" X 90

Costo a :

Unidad

Abril - 2013

Cantidad

Precio

Parcial

M
BOL
KG
UND
UND
UND
VAR
GLN
GLN
UND
M2
M2

16.27
36.37
17.95
52.00
7.53
10.00
43.01
60.94
60.94
2.00
128.44
35.32

15.50
16.90
6.30
12.40
4.50
75.50
20.00
45.00
45.00
150.00
45.22
37.80

252.19
614.65
113.09
644.80
33.89
755.00
860.20
2,742.30
2,742.30
300.00
5,808.06
1,335.10

M
PZA

16.29
10.00

3.50
18.50

57.02
185.00

UND
UND
VAR
P2
BOL
GLN
M3
GLB
GLB
UND
GLB

72.05
35.63
55.90
1,455.76
3.14
49.69
68.93
1.00
1.00
240.00
1.00

62.35
11.90
10.00
3.65
14.17
13.55
45.00
2,500.00
650.00
9.50
2,500.00

4,492.32
424.00
559.00
5,313.52
44.49
673.30
3,101.85
2,500.00
650.00
2,280.00
2,500.00

UND
M2
HJA
mes
GLB
MES
GLB

9.35
240.00
429.01
8.00
1.00
8.00
1.00

25.00
5.80
1.90
280.00
3,200.00
450.00
1,750.00

233.75
1,392.00
815.12
2,240.00
3,200.00
3,600.00
1,750.00

GLB
P2
UND
GLN
P2
P2
UND
P2
P2
P2
PLN
P2
PZA
PZA
PZA
PZA
GLN
GLN
GLN
GLN
GLN
und
KG
PLN
UND

1.00
402.47
1.00
16.33
0.30
2,142.32
2.00
48.71
6.63
874.72
24.00
9,330.99
26.91
1.00
10.09
6.73
150.00
17.36
0.10
81.89
191.55
5.65
42.41
10.33
1.00

800.00
4.20
350.00
30.25
7.65
8.60
23.00
3.85
3.36
4.86
42.00
4.35
29.40
15.00
12.00
29.40
15.00
36.20
32.00
54.00
13.00
65.50
15.50
16.50
50.42

800.00
1,690.37
350.00
493.98
2.30
18,423.95
46.00
187.53
22.28
4,251.14
1,008.00
40,589.81
791.15
15.00
121.08
197.86
2,250.00
628.43
3.20
4,422.06
2,490.15
370.08
657.36
170.45
50.42

UND
UND
UND
UND
und

1.00
2.00
1.00
4.07
8.00

65.70
1.68
175.80
1.30
3.20

65.70
3.36
175.80
5.29
25.60

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Listado de Insumos
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y
GUZMAN DE HUNTER, AREQUIPA"

Obra
Sub Presupuesto

01 - CONSTRUCCION DE TALLERES 01

Cliente
Ubicacion

GOBIERNO REGIONAL DE AREQUIPA


HUNTER - AREQUIPA - AREQUIPA

IU Cdigo
72 01398
72 01732
72 02057
72 00498
72 01442
72 03502
72 01443
72 03733
72 01440
72 03503
72 03504
72 01404
72 01405
72 00185
74 03566
74 03408
74 03056
74 03567
74 03568
74 03572
74 03584
74 03611
74 02561
74 03736
74 03612
74 03609
74 03574
74 03610
74 03575
74 03586
74 03613
74 00232
77 03038
78 00187

Descripcin
CODO PVC SAP C-10 1/2"X90
CODO PVC SAP C-10 3/4"X90
CURVA PESADO PVC SAP P/INST. ELECT 1"
PEGAMENTO PARA PVC 1GL
RAMAL YEE SIMPLE PVC SAL DE 2"
TEE PVC SAP C-10 1/2" C/R
TUBERIA PVC SAL PARA DESAGUE DE 2"x3M
TUBERIA PVC SAL PARA DESAGUE DE 2"X3M
TUBERIA PVC SAL PARA DESAGUE DE 4"X3M
TUBERIA PVC SAP PRESION C-10 R. 1/2"X5M
TUBERIA PVC SAP PRESION C-10 R. 3/4"X5M
UNION DE PVC DE 1/2"
UNION DE PVC DE 3/4"
UNION UNIVERSAL FG 1/2"
CAJA OCTOGONAL GALV. 100x100x40mm
CAJA RECTANGULAR GALV. 100x55x50 mm.
CINTA AISLANTE
CONEXION A CAJA PVC SAP 20mm
CURVA PVC SAP INST. ELECTRICAS 20mm
CURVA PVC SAP INST. ELECTRICAS 25mm
CURVA PVC SAP INST. ELECTRICAS 40mm
CURVA PVC SAP INST. ELECTRICAS 50mm
TUB. PVC SAP P/INST. ELECT. DE 1" x 3M
TUBO PVC SAP E/C INST. ELECTRICAS 40mmx3m
TUBO PVC SAP E/C INST. ELECTRICAS 50mmx3m
TUBO PVC SAP-P INST. ELECTICAS 20mmx3m
TUBO PVC-SAP INST. ELECTRICAS 25mmx3m
UNION SIMPLE PVC SAP INST. ELECTRICAS 20mm
UNION SIMPLE PVC SAP INST. ELECTRICAS 25mm
UNION SIMPLE PVC SAP INST. ELECTRICAS 40mm
UNION SIMPLE PVC SAP INST. ELECTRICAS 50mm
UNION SIMPLE PVC-SEL 20 mm
SUMIDERO DE BRONCE DE 2"
VALVULA DE COMPUERTA 1/2"

Costo a :

Unidad
UND
UND
UND
GLN
UND
PZA
und
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
PZA
UND
UND
UND
UND
TUB
PZA
PZA
PZA
PZA
UND
UND
UND
UND
UND
PZA
UND

Abril - 2013

Cantidad

Precio

Parcial

8.00
8.00
1.00
1.91
8.00
8.00
3.20
3.22
3.15
2.98
2.56
1.26
0.85
2.00
98.00
49.00
25.34
296.00
253.69
1.58
1.11
4.99
3.00
3.33
15.29
432.82
4.99
5.38
5.04
3.31
15.33
78.00
2.00
1.00

1.20
2.15
1.62
92.90
4.68
1.70
7.10
12.50
14.20
11.80
13.00
1.68
1.68
1.68
3.50
3.30
2.50
1.50
0.85
0.95
1.35
1.75
6.72
7.50
7.85
5.80
5.95
1.10
1.25
1.45
1.65
0.85
5.30
19.71

9.60
17.20
1.62
177.44
37.44
13.60
22.72
40.25
44.73
35.16
33.28
2.12
1.43
3.36
343.00
161.70
63.35
444.00
215.64
1.50
1.50
8.73
20.16
24.98
120.03
2,510.36
29.69
5.92
6.30
4.80
25.29
66.30
10.60
19.71
381,964.71

EQUIPO
37 03483
37 03478
37 03490
37 03476
37 01371
37 03485
37 03493
37 01381
37 03481
37 03482
37 00005
37 03479
37 03494
37 03487
37 03484
37 03480
37 03477
37 03486
37 03492
37 03491
48 01482
48 02247
48 00828
48 03446
48 00471
48 01382
49 00039
49 01512
49 00036
P.3/4

CAMISA MANGA LARGA DENIM


CARETA TRANSPARENTE PARA ESMERILAR
CASCOS BLANCO (P.TECNICO)
CASCOS TIPO JOCKEY DE PLASTICO
CEPILLADORA
CHALECO REFLECTIVO
CHALECO REFLECTIVO (P.TECNICO)
CIZALLA P/FIERRO CONST. HASTA 1"
GUANTES DE CUERO REFORZADO
GUANTES DE JEBE
HERRAMIENTAS MANUALES
LENTES DE SEGURIDAD
LENTES DE SEGURIDAD (P.TECNICO)
MALLA DE SEGURIDAD X 1.00 MTS
PANTALON DENIM
PROTECCION DE OIDOS TIPO TAPON
RESPIRADOR CONTRA POLVO
ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO
ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO
(P.TECNICO)
ZAPATOS DE SEGURIDAD P/ELECTRICISTA
ANDAMIO METAL TABLAS-ALQUILER
CAMION PLATAFORMA 4x2 122 HP 8 TON.
CIZALLA P/CORTE DE FIERRO
MAQUINA DE SOLDAR PARA PROCESO TIG
SIERRA CIRCULAR
SOLDADORA ELECT. MONOF. ALTERNA 295 AMP.
CAMION VOLQUETE 4x2 140-210 HP 6 M3.
MEZCLADORA CONCRETO TROMPO 8 HP 9 P3
PLANCHA COMPACTADORA VIBRAT. 4.0 HP

UND
UND
PZA
PZA
HM
UND
UND
UND
UND
UND
%MO
UND
UND
RLL
UND
UND
UND
PAR
PAR

240.00
240.00
6.00
240.00
27.79
240.00
6.00
4.24
240.00
240.00

26.00
18.00
16.00
12.00
5.46
47.00
65.00
5.00
9.90
10.50

240.00
6.00
24.00
240.00
240.00
240.00
240.00
6.00

7.50
45.60
85.00
38.00
2.50
3.00
50.00
350.00

6,240.00
4,320.00
96.00
2,880.00
151.73
11,280.00
390.00
21.20
2,376.00
2,520.00
6,782.24
1,800.00
273.60
2,040.00
9,120.00
600.00
720.00
12,000.00
2,100.00

PAR
EST
HM
HM
HM
HM
HM
HM
HM
HM

2.00
89.98
80.00
724.11
22.36
27.81
46.12
44.76
155.35
74.00

130.00
0.46
145.00
2.69
10.00
4.62
8.50
100.84
10.00
11.80

260.00
41.39
11,600.00
1,947.86
223.60
128.48
392.02
4,513.60
1,553.50
873.20

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Listado de Insumos
Obra

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y


GUZMAN DE HUNTER, AREQUIPA"

Sub Presupuesto

01 - CONSTRUCCION DE TALLERES 01

Cliente
Ubicacion

GOBIERNO REGIONAL DE AREQUIPA


HUNTER - AREQUIPA - AREQUIPA

IU Cdigo
49 00383
49 01357
49 01458

Descripcin
TEODOLITO
VIBRADOR DE CONCRETO 4 HP 2.40"
WINCHE DE DOS BALDES (350KG)M.E. 3.6HP

Costo a :

Unidad
HM
HM
HM

Abril - 2013

Cantidad

Precio

Parcial

6.36
98.97
30.27

10.00
7.00
12.00

63.60
692.79
363.24
88,364.05

COSTO DIRECTO
GASTOS GENERALES
GASTOS DE SUPERVISION
GASTOS DE LIQUIDACION

7.40 %
3.30 %
1.80 %

COSTO TOTAL PRESUPUESTAL


Son : SETECIENTOS NOVENTA Y OCHO MIL QUINIENTOS TREINTA Y OCHO CON 77/100 NUEVOS SOLES

P.4/4

709,812.24
52,526.11
23,423.80
12,776.62
798,538.77

Das könnte Ihnen auch gefallen