Sie sind auf Seite 1von 2
| How to Install Valve & Caution to Take 1.Make sure that you instal strainer infront of differential pressure control valve to prevent contaminant from getting into the valve 2.Maintain sufficient distance between valves to avoid water turbulence 3. Install By-Pass Line for maintenance and management 4.Check the arrow direction of valve body so that its installed the same direction as water flow. 5. Install pressure pipe in the front side (return pipe) or the backside (supply pipe) of ferential pressure control valve with more than 5 times of distance of pipe diameter 6. Attach ball valve to connection of pressure pipe and lock it 7 Install supply pressure pipe atthe top of dlaphragm case and return pressure pipe at the bottom £8, Close manual valve atthe front and back of differential pressure control valve and open bypass valve. Conduct freshing several times ‘9. After freshing, close bypass valve and slowly open manual valve 10. Slowly open ball valve of supply and return pressure pipe atthe same time. Open drain valve attached tothe top and bottom of diaphragm case, and close the top valve first and then the bottom valve when water is drained out 11, Check operation and differential pressure. Start to use if they fine. you supply water with only one vale of pressure pipe ope. it canimpose heavy oad on diaphragm and ether parts So make sure you open both return ball vale and supply ball valveo pressure pipe [ How to Install Valve & Caution to Take {not requested otherwise, ferential pressure i set at CO7MPa when delivered 2. fyou want to adjust differential pressure to respond to changed, conditions foliow the steps illustrated below. ‘a. 0pen all valves inside circulation piping and operate pump. Read the differential pressure of supply and return, Loosen the bolt (Smm) placed on spring head. «Spin the nut dockwise or counterclockwise while looking at supply and return pressure to set the differential pressure you want. Lock the bolt (Smm) after setting the differential pressure to prevent arbitrary adjustment by others. SESE ET Make suretoflly comprehend the flowing caution inhaling the product so that product may display it performance. ".Donot apply impact ont 2Avoid any place with ust or humid when storing it 3,A speci attention should be pad so that any impurtis are ntinseted int the product «4When attaching tonto a pipe the location shoul be fee of and or debris while ‘point of gske should be ao cleaned up Sit should be installed on place easy to access for epaie The structure, dimensions and materials may by changed without any prior notice for theimprovement of performance o Manda Topi seat cen song Top sate Dtragm ase soins Daag Pte cent Daprogm Busing st ae ieee Daptrogn cae York Canesten Stuting Box racing et Toptange lockout > cone sea Sor body | How 8 Fix problems in Differential pressure Control Valve Operation Problem Cause Pressure pipe bal valve islocked Pressure pipe isnot propery laid Pressure pipe is clogged Valve does NotOperate | Valves installed ina wrong direction Diaphragm is damaged Differential pressure does not decrease even after loosening adjusting nut Differential Solution Slowly open the valve ater Checking See How to Install Valve Re-install after checking the arrow Reinstall the Valve Diaphragm is damaged ifindieator does not work when draining out water through supply air pin ‘with supply ball valve closed and return ball valve open. pressure ishigh orlow not rise even ater ‘Check diaphragm Differential pressure does fastening adjusting nut [Maintenace Tips 1.Locking after checking gate valve Main valve locking 2, Pressure pipe ball valve locking 3.Slonly loosening after checking height ofthe spring specified 4. Separating the pressure pipe 5. Loosening after checking the height of indicator’ stamp thread 6.Slowly loosening stuffing nut box Stop disassembly if water continuously flows 7.Checking and replacing the packing and everselyasembiing it 1. Checking and locking gate valve 2. Pressure pipe ball valve locking 3. Checking and slowly loosening the height of spring specified 4. Separating the pressure pipe 5. Loosening after checking the height of indicator’ stamp thread 6. Disassembling the actuator Tits rusty excessively, it should bbe ground with soft sand paper 8 Replace Oring and assembling it

Das könnte Ihnen auch gefallen