Beruflich Dokumente
Kultur Dokumente
Prepared by:
Samsung
Health &Safety
Introduction to SCFT
Day 1
SCFT Requirements
Preparations for SCFT
Physical Site Check
Drive Test
Lunch break
XCAL Demonstration
Hands on exercises
Good to know
Keep your mobile phone in the silent mode during the session
Need to sign attendance sheet at the start and end of each day
At the end of each training post test will be conducted
Schedule
Day
Time
Session
Topic
10.00am to 1.00pm
1st
Introduction to SCFT
1.30pm to 6.00pm
2nd
10.00am to 1.00pm
1st
1.30pm to 6.00pm
2nd
10.00am to 1.00pm
1st
Day 1
Day 2
Day 3
2nd
10.30am to 1.00pm
1st
1.30pm to 6.00pm
2nd
Day 4
Agenda
Health & Safety Requirements
Introduction to SCFT
What is SCFT
Overview of SCFT Process
SCFT Workflow
Roles & Responsibilities
SCFT Requirements
Lead time
Tools
TSSR Review
eNB Parameter Review
Drive Route
Checklists
Agenda (2)
Physical Site Check
Measurements of height, azimuth, tilt
Drive Test
Types of tests
Tools required
Measurements & parameters
Safety Equipment
Sr. No.
Required Tools
Photo
Use of tools
Safety Belts
Safety Shoes
Hand Gloves
Its keeping your hands safe, And its used for gri
p and dexterity.
Helmets
Introduction to SCFT
(((
(((
EMF Survey
SOLPAR
Scope
No
Pass
Adjust Antenna
Parameter
Yes
Drive Test
No
Pass
Change system or
physical parameter
Yes
Analysis
No
Pass
Yes
SCFT Workflow
Extend support to circle SCFT Team for their minor & critical issues.
Interact with Samsung on Progress Management: Daily, Weekly,
Monthly basis.
SCFT Team Management and site allocation to RF Engineers,
Technicians, Riggers & Car drivers.
Validation of drive routes, discussion of issues, site performance
analysis
Support field team for troubleshooting and any other support
during SCFT activity
Prepare the RF Database and data backup of all drive related tests
and provide to Samsung
Extend support to field team for their minor & critical issues
Rigger will make corrections on site and inform Drive Test Engineer
Drive Test Engineer will configure the Smart S4 mini as per defined
test scenarios
Drive Test Engineer will save the log file. In case of handoff fail, bad
RSRP, call drop etc., inform respective teams immediately
Summary
Strictly follow all the health & safety guidelines
SCFT verifies the availability and desired performance of a site
SCFT involves physical & parameter check of eNodeB, corrections if needed,
followed by a drive test around the site
SCFT team consists of an RF engineer, DT engineer, Rigger and Car driver with
well-defined roles and responsibilities for all
Quiz
You find that the antenna azimuth is incorrect. You will _________
Correct it, log and report the error and then proceed with drive test
Proceed with the drive test and report it later
Cancel the drive test
SCFT Requirements
Tools Required
Sr.No
Tool Name
Description
Specification
Vehicle with AC
Power inverter
DC to AC
Over 500W
Compass
Tilt Measure
Camera
7
8
Spanner
Adjustable spanner
1 set
10
Tool kit
1 set
Maintain performance check records with history as per the attached sheet
Appendex-Smart DM
performance management.xls
TSSR Review
eNB Parameter
Verification
from LSM-R
Drive Route
Checklist
Simulation
(Coverage Statistics
RSRP)
TSSR (Continued)
Satellite &
Vector maps
Site drawing
map
Panoramic
pictures
Satellite map: Pre analysis for service area. Google earth snapshots of actual locations and
populated areas
Vector Map: Refer during drive test.
DT Engineer will take clutter pictures starting from North- Zero Degree at every 30
Degrees
Helps understand the clutter with respect to antenna azimuth
TSSR (Continued)
For each sector, take pictures of the antenna mounting
Antenna mounting
obstruction &
photographs
TSSR Review
eNB Parameter
Verification
from LSM-R
Drive Route
Checklist
Service Affecting
Alarms
Site down
High drop Rate
Low Tx Power
GPS Alarm
Tx Power is transmitted power from eNB station, measured Watts or dBm. Typical
value is 10W or 40dBm
Tx Power
Connectivity
Type of backhaul connectivity like fiber or microwave
Backhaul ATP completed
Back Haul
Site Name
Address
GPS
Lat
Sr.No.
Lon
Alpha
Beta
Gamma
NEID
PCID
Cell ID
10001
10002
10003
eNB CGI
768
769
770
TAC
H0002
H0002
H0002
EARFCN
38800
38800
38800
0.5
0.5
0.5
37
37
37
TM3
TM3
TM3
4x4
4x4
8
9
10
11
TSSR Review
eNB Parameter
Verification
from LSM-R
Drive Route
Checklist
Major
Road
Minor
Road
One lane
Important road
that leads from
one town or city
to another
TSSR Review
eNB Parameter
Verification
from LSM-R
Drive Route
Checklist
Site ID
Address
GPS
Lat
Sr.No.
1
2
3
List
Antenna Azimuth
Antenna M-Tilt
(Physical measurement)
Antenna E-Tilt
(Electrical from LSM-R)
Lon
Alph
a
Beta
120
240
Gamma
Antenna Height
35
35
35
Building Height
30
30
30
ACE
ANT
XXD
W-1765i-V
T
ACE
ANT
XXD
W-1765i-V
T
ACE ANT
XXDW-17-65i-VT
RF layout verification
Yes/N
o
Yes/N
o
Yes/No
Yes/N
o
Yes/N
o
Yes/No
10
Obstruction
(if yes, picture require)
Yes/N
o
Yes/N
o
Yes/N
o
Yes/N
o
Yes/No
Yes/No
Site Name
Address
GPS
Lat
Sr.No.
Lon
Alpha
Beta
Gamma
NEID
PCID
Cell ID
10001
10002
10003
eNB CGI
768
769
770
TAC
H0002
H000
2
H0002
EARFCN
38800
38800
38800
VSWR
0.5
0.5
0.5
37
37
37
10
TM4
TM4
TM4
11
4x4
4x4
4x4
Site Name
Address
GPS
Lat
Sr.No.
List
Antenna Azimuth
Antenna Azimuth
(Free available range)
Tower Height
Building Height
5
6
7
Antenna M-Tilt
(Physical measurement)
Antenna M-Tilt
(Free available range)
Antenna E-Tilt
(Electrical from LSM-R)
10
11
Backhaul Connectivity
Lon
Alpha
Beta
Gamma
No
OK
Yes
Contact RJIL/RAN
Core team for the
resolution
Resolved
Yes
Yes
No
OK
Yes
Start testing
No
OK
Yes
Contact concern
RJIL for the
resolution
Yes
Resolved
Yes
No
OK
Yes
Start testing
Summary
Perform regular testing of drive-test UEs
Preparations for SCFT consist of TSSR review, eNB parameter verification from
LSM-R, availability of drive route and checklists. Before proceeding to the site
make sure you have these
TSSR gives details about eNB physical parameters such as antenna height,
azimuth, tilt, pictures of obstruction, site drawings and map views
LSM-R parameters include details such as VSWR, Tx power and PCI
Ensure FTP and backhaul connectivity before proceeding to site
Cover all sectors during the drive
Quiz
VSWR is obtained from the _________
TSSR
LSM-R
Either
Drive Test
Stationary Test
(for each sector)
Moving Test
FTP Download
FTP Upload
Ping Test
VoLTE call
In case of call drop, handover failure, etc. stop the call and find out the
probable cause before proceeding further
Possible problems that may arise during drive test: UE disconnection, GPS
problems, FTP server issues
Field Issues
If the drive test fails, check the system parameters & check the
alarms from LSM-R
Check the FTP server: Capture detailed information like ping, call
test and call the server engineer
Repeat the field test if alarms clear from LSM-R and DM kit is
working fine
Ping Test
DL Throughput
Ensure that the UE is successfully attached to the LTE network
Start an FTP download with a file of size 50MB with a single FTP thread
Verify that the file has been downloaded successfully, record the throughput
and stop the logging
UL Throughput
Ensure that the UE is successfully attached to the LTE network
Start an FTP upload with file of size 25MB with a single FTP thread
Verify that the file has been uploaded successfully, record the
throughput and stop the logging
Do the drive test around the site, clock-wise and anti-clock-wise to check both way Intrahandover
If no proper route is available for checking Intra-handover, do a walk test around the site
Drive test for each sector is mandatory to check the coverage of cells and Inter handover
with neighbor cells
If there is any issue related to access (e.g. construction, road closed) please provide proper
justification with snapshot (Date and time should be mentioned on Photo)
Min
Average
Max
DL Throughput
2 Mbps
20 Mbps
40 Mbps
UL Throughput
256 Kbps
--
4 Mbps
RSRP
-108 dBm
--
--
SINR
20 dB
--
--
Legend
Summary
eNB physical check involves checking azimuth (note free range), tilt, antenna
height, tower height
Quiz
Average DL throughput should be at least ____
4 Mbps
20 Mbps
40 Mbps
XCAL on S4 Mini
smooth
remove
Bluetooth
previous
Bluetooth
pairing
request
window appears on both
devices
Press OK on both devices