Sie sind auf Seite 1von 20

TYPHOON GLENDA

DAMAGED ASSESSMENT
July 17, 2014

A. CLEARING OPERATION
Manpower
Equipment Fuel

Php.
Php.

1,810,042.80
550,000.00

B. DAMAGE STRUCTURES
1. Market Mall (roofing / lighting)
2. Covered Court (Champaca/St. Benedict)
3. DOJ Building
4. Teatro

Php. 6,000,000.00
Php. 2,400,000.00
Php.
300,000.00
Php.
300,000.00

C. ROADS / SIDEWALK (potholes)

Php. 3,000,000.00

D. RIP-RAP

Php. 5,000,000.00
Php. 19,360,042.80

E. DAMAGE POLE
1. Meralco pole
2. Government pole
3. PLDT

14
1
6

B.SOLIVEN NANGKA

SHALE ST., PARANG

DRAGON ST., SAN ROQUE

BANABA COR. BALIMBING

TYPHOON MARIO
DAMAGED ASSESSMENT
August 19, 2014
REPAIR & MAINTENANCE PROJECTS
Project Title / Description
1. Repair / Rehab of Existing Dilapidated Sidewalk,
Curbs & Gutter @ Various Streets within Marikina City
2. Sectional Blocking Repair of Various Streets
within Marikina City
3. Patching of Cold Mixed @ Various Streets
within Marikina City
4. Asphalt Overlay @ Various Streets within
Marikina City
5. Replacement of Fiber Glass Roof of Market Zone
@ Kap. Venciong St., Sto. Nino, Marikina City
6. Repair of Multi-Purpose Gymnasium Affection by Typhoon
Glenda @ St. Benedict Subd., Nangka, Marikina City
7. Sectional Blocking Repair of Rancho 1 gate, Rancho Ave.,
Concepcion 2, Marikina City
8. Repair / Maintenance of Vehicle

Project Cost
Php. 1,499,917.62
Php. 1,999,765.88
Php.

499,910.25

Php.

699,122.23

Php. 1,805,496.31
Php. 1,805,699.04
Php. 412,341.29
Php. 1,000,000.00

Php. 9,722,252.62

CLEARING OPERATION
C-5 BY PASS ROAD

43

C-5 BY PASS ROAD

44

SM TERMINAL PARKING
MARCOS HIGH WAY

45

BALUBAD /
BAYABAS ST., NANGKA

46

ALONG KABAYANI ROAD, BALUBAD


NANGKA
47

ROAD DIKE
TUMANA

48

50

DOA PETRA

51

TUMANA

52

Das könnte Ihnen auch gefallen