245/bag
450/cubic
780/cubic
13/pc.
110/lght
360/lght
172/lght
135/lght.
1050/box
980/ box
950/box
1100.00/box
60/roll
1900/kilo
750.00/liter
5,000
1,041,250.00
96,750.00
195,000.00
39,650.00
38,500.00
108,000.00
51,600.00
47,250.00
6,300.00
5,880.00
3,800.00
3,300.00
21,000.00
9,500.00
7,500.00
5,000.00
260/pc
58,500.00
260/pc
63,700.00
260/pc
8,320.00
260/pc
11,960.00
260/pc
13,000.00
500/lght.
300/lght.
4,000.00
4,800.00
350/sheet
125/lght.
160/lght.
90/lght.
5/pc.
300/box
35,000.00
56,250.00
14,400.00
9,000.00
2,500.00
90,000.00
350/sheet
17,500.00
-PACKAGE
WATER CLOSET @4 SETS @25,000
LAVATORY
SOAP HOLDER
FAUCET
TISSUE PAPER HOLDER
SHOWER HEAD
SHOWER VALVE
SHOWER FAUCET
TOWEL BAR
LIGHTING ACCESSORIES
60sets, PINLIGHTS 4'
Specialized lightings ( lump Sum)
DOOR (lump sum)
-DINING AREA/KITCHEN
ROOFING (Lump Sum)
LONGSPAN HI-RIB ROOFING
BENDED ACCESSORIES
TEKSCREW @ 4.50
DOUBLE SIDED INSULATION
2x6x6 m TUBULAR
SPAN 45 PURLINS
WATER PROOFING
PAINTING(lump sum)
DAVIES PONDO PRIMER PAINT
INTERIOR PAINTS
EXTERIOR PAINTS
WATERPROOFING
15000
60,000.00
360/set
35,000
21,600.00
35,000.00
35,000
-
35,000.00
-
50,000
-
40,000
-
50,000.00
40,000.00
-
30,000
40,000
-
30,000.00
40,000.00
-
30/pc
950/roll
360/sht
65/layon
60/pc
1,050
980
950
1,500.00
3,800.00
3,600.00
6,500.00
4,225.00
1,050.00
980.00
950.00
450/pc
350/pc
2,250.00
1,050.00
35,000
-
35,000.00
-
TOTAL PHP.
2,441,715.00
PHP.
40,000.00
PHP.
2,481,715.00
TOTAL PHP.
450,000.00
PHP.
80,000.00
3,011,715.00
SUMMARY:
I. STRUCTURAL FOUNDATION
II. ARCHITECTURAL FINISHING
III. ELECTRICAL
IV. PLUMBING
V. MECHANICAL
VI. DRAINAGE WORKS
VII. SITE CLEARING WORKS
VIII. GRILL WORKS
IX.CONTENGENCIES
X.LABOR COST
XI.SUPERVISION/DESIGN FEE
XII. FINAL PROJECT CONST. COST
PREPARED BY:
APPROVED BY:
1,680,280.00
540,530.00
50,000.00
40,000.00
30,000.00
40,000.00
25,905.00
35,000.00
40,000.00
450,000.00
80,000.00