LEVEL-1
POWER BLOCK
PB
LEVEL-2
GAS TURBINE BUILDING UNIT 1 PB-2
LEVEL-3
C4 , CA
LEVEL-4 (System) Vapor Extractor FL +3440
BQ
Weight
Sheet No.
CODE
CODE
CODE
CODE
P-21
Area Code
Ton
%
PPSS-GT1-MECH-17
13100
1.
1
2
3
4
5
6
7
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C4
C4
C4
C4
C4
C4
9
10
11
12
13
14
15
16
17
18
19
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
22
23
24
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
2.10.
2.11.
6.
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
CA
CA
CA
CA
CA
CA
CA
CA
Equipment on position
Install found. bolt & nut hanging at the base plate of Equip.
Check centerline & elevation of equipment
Grouting of Anchor Bolt
Install formwork
Grouting Foundation
Curing time
Remove formwork
Check alignment (centerline & elevation) after grouting
Tightening anchor bolt
Inspection equipment after grouting
Elevation : 2mm
Locattion : 2mm
Elevation : 2mm
Locattion : 2mm
MNS
ACTUAL
RESOURCE
Mechanical
Manpower
START
FINISH
START
FINISH
NUM.
DUR.
NUM.
DUR.
Insulation
painting
Manpower
Progress (%)
Manpower
Plan
(Mandays)
(Mandays)
(Mandays)
Plan
Plan
Plan
Act
Act
Act
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
CA X02
13100
CA X02
13100
CA X02
13100
CA X02
1
-
Painting
3.1.
3.2.
3.3.
3.4.
Preparation
Cleaning surface
Painting Work
Painting Inspection
TOTAL
Drawing No.
PLANNING
Installation
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
20
21
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
2.
Remarks
ACTUAL
Weight
Actual
%
Weight
Preparation
C4
C4
C4
C4
C4
C4
Equipment/ Tools
F-WBS
WBS Code
LEVEL-6
(Activity)
LEVEL-5
PC-WBS
Activity No.
LEVEL-3
PLANNING
96
-
AL87656
- 1/1 -
[07/28/2015]