Beruflich Dokumente
Kultur Dokumente
LEVEL-1
POWER BLOCK
PB
LEVEL-2
GAS TURBINE BUILDING UNIT 1 PB-2
LEVEL-3
C4 , CA
LEVEL-4 (System) GT 3-1 Oil Drain Tank Space
BQ
Weight
Sheet No.
CODE
CODE
CODE
CODE
P-1
Area Code
Ton
%
PPSS-GT1-MECH-27
13100
1.
1
2
3
4
5
6
7
8
9
10
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C4
C4
C4
C4
C4
C4
C4
C4
C4
2.
12
13
14
15
16
17
18
19
20
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C4
C4
C4
C4
C4
C4
C4
C4
C4
3.
22
23
24
25
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
CA
CA
CA
CA
CA
CA
CA
CA
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
1.8.
1.9.
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
OHTC
Y-level, Water level,
Spanner, Measuring Tape
3.1.
3.2.
3.3.
3.4.
Preparation
Cleaning surface
Painting Work
Painting Inspection
Elevation:-3mm ~ 0mm
Location : 2mm
Elevation: 2mm
Location : 2mm
Carpenter Tools
Hydraulic Jack
Y-level, Water level,
Spanner, Measuring Tape
START
FINISH
START
FINISH
NUM.
DUR.
ACTUAL
NUM.
DUR.
RESOURCE
Mechanical
Manpower
Insulation
Manpower
painting
Manpower
Progress (%)
Plan
(Mandays)
Plan
Act
(Mandays)
Plan
Act
(Mandays)
Plan
Act
Weight
Actual
%
Weight
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
C4 X01
13100
CA X02
13100
CA X02
13100
CA X02
13100
CA X02
Painting
TOTAL
Drawing No.
MNS
Remarks
PLANNING
Installation
C4
C4
C4
C4
C4
C4
C4
C4
C4
21
Equipment/ Tools
ACTUAL
Preparation
C4
C4
C4
C4
C4
C4
C4
C4
C4
11
LEVEL-6
(Activity)
LEVEL-5
F-WBS
WBS Code
PC-WBS
Activity No.
LEVEL-3
G1-84886
- 1/1 -
[07/28/2015]