PLN Tanjung Priok GFPPEP

LEVEL-1
POWER BLOCK
LEVEL-2
GAS TURBINE BUILDING 1
LEVEL-3
LEVEL-4 (System) GT 3-1 Generator Gas Dryer

PB
PB-2
C6 , CA

BQ
Weight
Sheet No.

CODE
CODE
CODE
CODE

P-3

Area Code

Ton
%
PPSS-GT1-MECH-19

13100

1.

1
2
3
4
5
6
7

PB
PB
PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2
PB-2
PB-2

C6
C6
C6
C6
C6
C6

9
10
11
12
13
14
15
16
17
18
19

PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2

C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6

21
22
23
24

2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
1.10.
2.11.
3.

PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2

CA
CA
CA
CA

CA
CA
CA
CA

Check & marking Centerline of foundation floor


Chipping at foundation floor & box out
Cleaning foundation
Setting packer plate
Curing time
Alignment inspection of packer plate

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

C6 X03

Y-level, measurer

13100

C6 X03

Chain Block, sling, OHTC


Spanner

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

C6 X03

13100

CA X02

13100

CA X02

13100

CA X02

13100

CA X02

Hammer Drill
Y-level, measurer

Elev. : -3mm ~ 0mm


Location : 5mm

Equipment on Position
Install Found. Bolt & Nut hang at the Foot Plate Equip.
Check CL & EL. Of Equipment
Alignment Inspection of Equipment
Installing for Formwork
Grouting Foundation
Curing Time
Remove formwork
Check alignment (CL & EL.) After Grouting
Tightening for Anchor Bolt
Inspection Equipment After Grouting

Y-level, measurer
Carpenter Tools
Mixer Grout

Y-level, measurer
Spanner
Y-level, measurer

Elev. : 2mm
Location : 2mm

Elev. : 2mm
Location : 2mm

MNS

FINISH

START

FINISH

NUM.

DUR.

NUM.

DUR.

RESOURCE
Mechanical
Manpower

Insulation
Manpower

painting
Manpower

Progress (%)
Plan

(Mandays)
Plan
Act

(Mandays)
Plan
Act

(Mandays)
Plan
Act

Weight

Actual

Weight

Painting
3.1.
3.2.
3.3.
3.4.

Preparation
Cleaning surface
Painting Work
Painting Inspection

TOTAL

Drawing No.

START

ACTUAL

Installation

C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6

20

Remarks

PLANNING

20%
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.

2.

Equipment/ Tools

ACTUAL

Preparation

C6
C6
C6
C6
C6
C6

LEVEL-6
(Activity)

LEVEL-5

F-WBS

WBS Code

PC-WBS

Activity No.

LEVEL-3

GT 3-1 Generator Gas Dryer


PLANNING

AL87657

- 1/1 -