Presupuesto
Presupuesto
1201008
Subpresupuest 001
CONSTRUCCION DEL PARQUE PRINCIPAL DEL ANEXO DE ESCOMARCA - DISTRITO DE LANGA
oCliente
Costo al
MUNICIPALIDAD DISTRITAL, DE LANGA
16/06/2015
Lugar
Item
Descripcin
01
OBRAS PROVISIONALES
Und.
Metrado
Precio S/.
Parcial S/.
20,356.50
01.01
und
2.00
01.02
glb
1.00
4,244.94
4,244.94
01.03
FLETE TERRESTRE
glb
1.00
15,500.00
15,500.00
02
305.78
OBRAS PRELIMINARES
6,568.69
02.01
m2
1,435.16
2.59
02.02
m2
298.60
9.55
03
611.56
MOVIMIENTO DE TIERRAS
3,717.06
2,851.63
23,705.19
03.01
m3
472.24
10.19
4,812.13
03.02
m3
138.50
49.82
6,900.07
03.03
m3
108.82
18.84
2,050.17
03.04
m3
631.74
13.05
8,244.21
m3
43.96
38.64
1,698.61
03.05
04
04.01
207,160.95
25,540.54
04.01.01
m2
477.07
12.63
6,025.39
04.01.02
m2
121.77
28.30
3,446.09
04.01.03
ENCOFRADO Y DESENCOFRADO
m2
115.00
42.93
4,936.95
04.01.04
272.62
8.78
2,393.60
04.01.05
JUNTAS ASFALTICAS
272.62
16.08
4,383.73
04.01.06
71.79
60.66
04.02
PISOS DE PARQUE
4,354.78
59,284.73
04.02.01
m2
293.37
12.63
3,705.26
04.02.02
m2
293.37
125.30
36,759.26
04.02.03
205.40
83.34
17,118.04
04.02.04
68.47
8.78
601.17
04.02.05
JUNTAS ASFALTICAS
68.47
16.08
1,101.00
04.03
VEREDAS
122,335.68
04.03.01
m2
371.11
12.63
4,687.12
04.03.02
m2
371.11
287.78
106,798.04
04.03.03
ENCOFRADO Y DESENCOFRADO
m2
40.22
42.93
1,726.64
04.03.04
223.51
36.80
8,225.17
04.03.05
JUNTAS ASFALTICAS
55.89
16.08
898.71
05
INSTALACIONES SANITARIAS
1,095.72
05.01
54.84
5.48
300.52
05.02
32.00
5.06
161.92
05.03
und
4.00
39.94
159.76
05.04
und
4.00
71.33
285.32
05.05
und
2.00
80.10
160.20
05.06
und
1.00
28.00
06
INSTALACIONES ELECTRICAS
06.01
und
06.02
06.03
und
06.04
06.05
FAROLA ESFERIOCA DE 70 W
CAJA PORTAMEDIDOR
06.06
07
07.01
1.00
139.26
139.26
240.00
10.67
2,560.80
14.00
107.41
1,503.74
und
1.00
821.09
821.09
und
14.00
260.99
3,653.86
und
1.00
50.00
VARIOS
CUNETAS
28.00
8,728.75
50.00
38,152.41
m3
11.28
480.72
5,422.52
07.02
BANCAS
und
14.00
280.00
3,920.00
07.03
PILETA ORNAMENTAL
und
1.00
17,000.00
17,000.00
07.04
und
2.00
310.50
621.00
07.05
m2
328.12
34.10
11,188.89
08
OTROS
'08.01
MITIGACION AMBIENTAL
'08.01.01
'08.02
'08.02.01
4,500.00
MITIGACION AMBIENTAL
GLB
1.00
3,000.00
GLB
1.00
1,500.00
3,000.00
1,500.00
310,268.21
31,026.82
15,513.41
SUBTOTAL
356,808.44
IGV (18%)
64,225.52
SUPERVISION (5%)
TOTAL PRESUPUESTO
SON :
QUINIENTOS SESENTA Y OCHO MIL CIENTO NOVENTA Y SIETE Y 31/100 NUEVOS SOLES
Fecha :
15,513.41
436,547.37
19/06/2015 11:18:18 AM
0.01
01
01.01
01.02
01.03
02
02.01
02.02
03
03.01
03.02
03.03
03.04
03.05
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
06.03
06.04
06.05
06.06
07
OBRAS
PROVISIONALES
CARTEL DE OBRA
DE 3.60X4.20
MOVILIZACION DE
MAQUINARIA Y
FLETE
HERRAMIENTAS
TERRESTRE
PARA LA OBRA
OBRAS
PRELIMINARES
NIVELACION
TRAZO Y
DEMOLICION EN
REPLANTEO
ESTRUCTURA
DE
PRELIMINAR
MOVIMIENTODE
DE8"
CONCRETO
TIERRAS
EXCAVACION
MASIVA A MAQUINA
ENRELLENO
TERRENO
COMPACTADO
CON
NORMAL
ACARREO
MATERIAL
DEY
RELLENO
CON
PRESTAMO
ELIMINACION
DE
TIERRA
DE CHACRA
DESMONTE
PROV.
ENEXCAVACION
JARDINES
MOVIMIENTO DE
MANUAL EN
TIERRA
PISOS,
TERRENO NORMAL
PAVIMENTOS
(MURO
DE Y
PAVIMENTO
VEREDAS
CONTENCION)
RIGIDO
EN
BASE
CALZADA
GRANULAR E=0.20M
PAVIMENTO
RIGIDO DE
ENCOFRADO Y
CONCRETO
DESENCOFRADO
F'C=210KG/CM2
JUNTAS DE
E=25CM
CONSTRUCCION
CONJUNTAS
TECNOPOR
ASFALTICAS
MAPOSTERIA
PIEDRA ASENTADA
DE PARQUE
ENPISOS
CONCRETO
F'C=175KG/CM2
BASE
GRANULAR E=0.20M
PISO CON
ENCHAPE DE
SARDINELES
PIEDRA
TALLADA
DECORATIVOS
JUNTAS DE
PARQUE
CONSTRUCCION
CONJUNTAS
TECNOPOR
ASFALTICAS
VEREDAS
BASE
GRANULAR E=0.20M
CONCRETO
F'C=140KG/CM2
ENCOFRADO Y
E=10CM
DESENCOFRADO
SARDINELES DE
PIEDRA TALLADA
JUNTAS
ASFALTICAS
INSTALACIONES
SANITARIAS
TUBERIA PVC SAP
DE 3/4"
TUBERIA PVC SAP
DE 1/2"
SALIDAS PARA
AGUA DE 1/2"
LLAVE DE RIEGO
CON GRIFO DE 1/2"
VALVULA TIPO
GLOBO DE3/4"
CAJA PARA
MEDIDOR
INSTALACIONES
ELECTRICAS
CAJA DE PASE
DE FG"
CABLE
150x150x100
MM
ELECTRICO NYY
POSTE
2x6
MM2 METALICO
1 CUERPO 3' DE
H=TABLERO
2.50 M
GENERAL DE
FAROLA
DISTRI
BUCION
ESFERIOCA DE 70
CAJA
W
PORTAMEDIDOR
VARIOS
20,356.50
und
2.00
611.56
glb
1.00
4,244.94
glb
1.00
15,500.00
m2
1,435.16
3,717.06
m2
298.60
2,851.63
m3
472.24
#REF!
m3
138.50
6,900.07
m3
108.82
2,050.17
m3
631.74
8,244.21
m3
43.96
6,568.69
#REF!
1,698.61
207,160.95
25,540.54
m2
477.07
6,025.39
m2
121.77
3,446.09
m2
115.00
4,936.95
272.62
2,393.60
272.62
4,383.73
71.79
4,354.78
59,284.73
m2
293.37
3,705.26
m2
293.37
36,759.26
205.40
17,118.04
68.47
601.17
68.47
1,101.00
m2
371.11
4,687.12
m2
371.11
106,798.04
m2
40.22
1,726.64
223.51
8,225.17
55.89
122,335.68
898.71
1,095.72
54.84
300.52
32.00
161.92
und
4.00
159.76
und
4.00
285.32
und
2.00
160.20
und
1.00
28.00
und
1.00
139.26
#REF!
240.00
2,560.80
und
14.00
1,503.74
und
1.00
821.09
und
14.00
#REF!
und
1.00
50.00
38,152.41
07.01
CUNETAS
m3
11.28
07.02
BANCAS
und
14.00
3,920.00
und
1.00
17,000.00
und
2.00
621.00
07.03
07.04
PILETA
ORNAMENTAL
PEDESTAL PARA
HASTA DE
BANDERAS
5,422.52
07.05
08
'08.01
'08.01.01
'08.02
'08.02.01
SEMBRADO DE
GRASS Y PLANTAS
OTROS
MITIGACION
AMBIENTAL
MITIGACION
AMBIENTAL
EQUIPOS DE
SEGURIDAD
EQUIPOS DE
INDIVIDUAL
SEGURIDAD
INDIVIDUAL
m2
328.12
11,188.89
#REF!
GLB
1.00
#REF!
GLB
1.00
#REF!
01
OBRAS PROVISIONALES
01.01
und
2.00
305.78
01.02
glb
1.00
4,244.94
01.03
FLETE TERRESTRE
glb
1.00
15,500.00
02
OBRAS PRELIMINARES
02.01
m2
1,435.16
2.59
02.02
m2
298.60
9.55
m3
472.24
10.19
03.02
m3
138.50
49.82
03.03
m3
108.82
18.84
03.04
m3
631.74
13.05
03.05
m3
43.96
38.64
03
03.01
04
04.01
MOVIMIENTO DE TIERRAS
04.01.01
m2
477.07
12.63
04.01.02
m2
121.77
28.30
04.01.03
ENCOFRADO Y DESENCOFRADO
m2
115.00
42.93
04.01.04
272.62
8.78
04.01.05
JUNTAS ASFALTICAS
272.62
16.08
71.79
60.66
04.01.06
04.02
PISOS DE PARQUE
04.02.01
m2
293.37
12.63
04.02.02
m2
293.37
125.30
04.02.03
205.40
83.34
04.02.04
68.47
8.78
JUNTAS ASFALTICAS
68.47
16.08
04.02.05
04.03
VEREDAS
04.03.01
m2
371.11
12.63
04.03.02
m2
371.11
287.78
04.03.03
ENCOFRADO Y DESENCOFRADO
m2
40.22
42.93
04.03.04
223.51
36.80
04.03.05
JUNTAS ASFALTICAS
55.89
16.08
5.48
05
INSTALACIONES SANITARIAS
05.01
54.84
05.02
32.00
5.06
05.03
und
4.00
39.94
05.04
und
4.00
71.33
05.05
und
2.00
80.10
05.06
und
1.00
28.00
1.00
139.26
06
INSTALACIONES ELECTRICAS
06.01
und
06.02
06.03
und
06.04
06.05
FAROLA ESFERIOCA DE 70 W
06.06
CAJA PORTAMEDIDOR
07
07.01
240.00
10.67
14.00
107.41
und
1.00
821.09
und
14.00
260.99
und
1.00
50.00
m3
11.28
480.72
VARIOS
CUNETAS
07.02
BANCAS
und
14.00
280.00
07.03
PILETA ORNAMENTAL
und
1.00
17,000.00
07.04
und
2.00
310.50
07.05
m2
328.12
34.10
GLB
1.00
3,000.00
GLB
1.00
1,500.00
08
OTROS
'08.01
MITIGACION AMBIENTAL
'08.01.01
'08.02
'08.02.01
MITIGACION AMBIENTAL
EQUIPOS DE SEGURIDAD INDIVIDUAL
EQUIPOS DE SEGURIDAD INDIVIDUAL
20,356.50
611.56
4,244.94
15,500.00
6,568.69
3,717.06
2,851.63
23,705.19
4,812.13
6,900.07
2,050.17
8,244.21
1,698.61
207,160.95
25,540.54
6,025.39
3,446.09
4,936.95
2,393.60
4,383.73
4,354.78
59,284.73
3,705.26
36,759.26
17,118.04
601.17
1,101.00
122,335.68
4,687.12
106,798.04
1,726.64
8,225.17
898.71
1,095.72
300.52
161.92
159.76
285.32
160.20
28.00
8,728.75
139.26
2,560.80
1,503.74
821.09
3,653.86
50.00
38,152.41
5,422.52
3,920.00
17,000.00
621.00
11,188.89
4,500.00
3,000.00
1,500.00