LIST OF CONTENTS
1.0
PLANT DETAILS
2.0
OBJECTIVE
3.0
PROPOSAL
4.0
SERVICES REQUIRED
5.0
SAFETY PERECAUTIONS
6.0
EMERGENCY PROCEDURE
7.0
8.0
METHOD
9.0
COMPLETION CRITERIA
10.0
APPENDICES
Sheet 1 of 12
Sheet 2 of 12
STATUS
PLANT DETAILS
500 MW Generator consists of the following components.
a. STATOR
Stator Frame
End Shields
Stator Core
Stator winding
Hydrogen coolers
b. ROTOR
Rotor Shaft
Rotor windings
Rotor Retaining Rings
Field Connections
c. BEARINGS
d. SHAFT SEALS
1.2
The two pole generator is designed with direct water cooling for
the stator winding, phase connectors and bushings and direct
Hydrogen cooling for rotor winding. Generator losses, such as
iron losses, windage losses and stray losses are also dissipated
through hydrogen. The generator frame is pressure resistant,
gastight and equipped with major components mentioned above.
The hydrogen coolers are arranged vertically inside the turbine
end stator end field.
Signatures
NTPC
BHEL
Sheet 3 of 12
STATUS
1.3
1.4
They are
1.5
ELP 50/42-30/16
588 MVA
500 MW
Current
16.166 KA
Voltage
21KV + 1.05KV
Speed
3000 RPM
Freqency
50HZ
Power Factor
0.85 (Lag)
Hydrogen Pressure
3.5 bar
340 V
4040 A
Signatures
NTPC
BHEL
Sheet 4 of 12
STATUS
OBJECTIVE
The objective is fill the generator with hydrogen to the rated
pressure and purity and to release it to unit operation.
3.0
PROPOSAL
The objective will be achieved through the following proposals.
3.1
3.2
Signatures
NTPC
BHEL
Sheet 5 of 12
STATUS
4.0
SERVICES REQUIRED
4.1
4.2
4.3
4.4
Availability of lighting/communication
4.5
5.0
SAFETY PRECAUTIONS
5.1
5.2
Signatures
NTPC
BHEL
Sheet 6 of 12
STATUS
5.3
5.4
6.0
EMERGENCY PROCEDURES
6.1
6.2
7.0
7.1
7.2
7.3
7.4
Stator winding filled with primary water and primary water tank
kept pressure less. All the valves closed in P.W. System.
All the instruments in gas system are mounted as per scheme.
7.5
7.6
Signatures
NTPC
BHEL
Sheet 7 of 12
STATUS
7.7
Vent valves provided in oil drain lines are closed viz., MKA21 AA
502, MKA 22 AA 502, MKA 23 AA 502, MKA 23 AA 512, MKA 24
AA 502.
7.8
Valves provided in gas impulse line for valve A1, A2 in seal Oil
system are opened.
7.9
Ensure that all the shut off valves are in closed condition.
7.10
Signatures
NTPC
BHEL
Sheet 12 of 12
STATUS
METHOD:
8.1
9.0
COMPLETION CRITERIA
Leakage test should be carried out for 72 hrs at 4 bar and
average air loss should be calculated. The permissible air loss for
a gas tight system is below 2.4m3 at N.T.P. / 24 Hrs.
If air loss is higher, checks should be carried out for detecting the
leakage areas.
10.0
APPENDICES
The following system drawings to be referred from O & M manual
Gas System
P.W. System
Seal Oil System
Generator Instrumentation Scheme
Waste Fluid System
Waste Gas System