Sie sind auf Seite 1von 27

STANDARD CHECK LISTS

CONTROL & INSTRUMENTATION

VOLUME III

TECHNICAL SERVICES DEPARTMENT

BHARAT HEAVY ELECTRICALS LIMITED


(A Government of India Undertaking)
Power Sector Southern Region
474, Anna Salai, Nandanam, Chennai 600 035.

STANDARD CHECK LISTS


CONTROL & INSTRUMENTATION
CONTENTS

SL.NO

TITLE

1.

IGNITOR TRANSFORMER

2.

AUTO MANUAL STATION

3.

PUSH BUTTON MODULE

4.

ALARM ANNUNCIATION EQUIPMENT

5.

ELECTRONIC MODULES OF DDCMIS

6.

COLD JUNCTION BOX

7.

T/C AND CONNECTING CABLE

8.

PRESSURE / VACUUM SWITCH

9.

PRESSURE TRANSMITTER

CONTROL INSTRUMENTATION
STATION

STANDARD CHECK LIST

SHEET 1 OF 1

INSTRUMENT : IGNITOR TRANSFORMER

SCL REF: 1.16.1

SUPPLIER______________________________________________________________
MANUFACTURE ______________ TYPE ____________ SERIAL NO. _____________
RANGE ______________________ INPUT ____________ OUTPUT ______________
POWER SUPPLIES _________ VOLTS _________ AMPS ___________HZ ________
PLANT SYSTEM _______________________________ LOCATION ______________
N.T.P.C. TAG NO.
NO.

UNIT:
ACTIVITY

1.

Guarding & access must be safe & adequate for plant


operation & maintenance.

2.

Check that plant identification labels are correct to N.T.P.C.


nomenclature.

3.

Check that plant item is clean, undamaged and fitted as


specified in manufacturers instruction manual with
appropriate safety standard and check that paint work & the
box is undamaged.

4.

Check that mounting is mechanically secure.

5.

Check that cabling is adequate and cable glands etc.

6.

Check the works test certificate & retain the same.

7.

Check that voltage range is right and check termination of


cables for tightness.

8.

Check the grounding of the box.

REMARKS

REMARKS
CUSTOMER
SIGNATURE

BHEL
SIGNATURE

DATE:

CONTROL INSTRUMENTATION
STATION

STANDARD CHECK LIST

SHEET 1 OF 2

INSTRUMENT : AUTO MANUAL CONTROL STATION

SCL REF: 1.9.1

SUPPLIER______________________________________________________________
MANUFACTURE ______________ TYPE ____________ SERIAL NO. _____________
RANGE ______________________ INPUT ____________ OUTPUT ______________
POWER SUPPLIES _________ VOLTS _________ AMPS ___________HZ ________
PLANT SYSTEM _______________________________ LOCATION ______________
N.T.P.C. TAG NO.
NO.

UNIT:
ACTIVITY

1.

Check for safe and easy access.

2.

Check that type is according to instrument schedule.

3.

Check that station is correctly identified.

4.

Visual Inspect for.

REMARKS

a) Physical damage
b) Wiring Damage
c) Correct feruling at A/M station and terminal block.
5.

Check the instrument cable as per N.T.P.C drawing.

6.

Check for correct operation of manual raise / lower and auto


to manual transfer switches.

7.

Check Raise & lower voltage polarity taking into account


reverse or direct action.

REMARKS
CUSTOMER
SIGNATURE

BHEL
SIGNATURE

DATE:

CONTROL INSTRUMENTATION
STATION

STANDARD CHECK LIST

INSTRUMENT : AUTO MANUAL CONTROL STATION


N.T.P.C. TAG NO.
NO.

SHEET 2 OF 2
SCL REF: 1.9.1

UNIT:
ACTIVITY

8.

Check built-in % position indicator over entire range by


injection (0 10) volts.

9.

When fitted, check operation of load distribution / ratio /


desired valve potentiometer and associated indicator.

10.

Check all indicating lamp circuits.

REMARKS

REMARKS
CUSTOMER
SIGNATURE

BHEL
SIGNATURE

DATE:

CONTROL INSTRUMENTATION
STATION

STANDARD CHECK LIST

INSTRUMENT : PUSH BUTTON MODULES

SHEET 1 OF 1
SCL REF: 1.9.2

SUPPLIER______________________________________________________________
MANUFACTURE ______________ TYPE ____________ SERIAL NO. _____________
RANGE ______________________ INPUT ____________ OUTPUT ______________
POWER SUPPLIES _________ VOLTS _________ AMPS ___________HZ ________
PLANT SYSTEM _______________________________ LOCATION ______________
N.T.P.C. TAG NO.
DUTY

UNIT:

NO.

ACTIVITY

1.

Check that access is safe & essy. Inc. Lamp Replacement

2.

Check mount & location

3.

Check for correct labelling.

4.

Check cabling & wiring installation, numbering & ferruling.

5.

Check contact operation and lamp function of each button &


lamp.

6.

Check for correct working during plant operation.

REMARKS

REMARKS
CUSTOMER
SIGNATURE

BHEL
SIGNATURE

DATE:

CONTROL INSTRUMENTATION
STATION

STANDARD CHECK LIST

SHEET 1 OF 2

INSTRUMENT : ALARM ANNUNCIATION EQUIPMENT


SUPPLIER______________________________________________________________
MANUFACTURE ______________ TYPE ____________ SERIAL NO. _____________
RANGE ______________________ INPUT ____________ OUTPUT ______________
POWER SUPPLIES _________ VOLTS _________ AMPS ___________HZ ________
PLANT SYSTEM _______________________________ LOCATION ______________
1.

Check the Alarm Sequence


Audible
Alarm (1)

Audible Alarm (2)


(Ring back)

Off
Fast flashing
Fast flashing
Steady light
Fast flashing

Off
On
Off
Off
Off

Off
Off
Off
Off
On

Slow flashing

Off

On

Slow flashing
Off
Full functional
sequence check &
lamp test

Off
Off

Off
Off

Event Designation
1.
2.
3.
4.
5.
6.
7.
8.
9.

Normal
Alarm
Silence PB Pressed
Acknowledge PB pressed
Return to normal before
acknowledgement
Return to normal after
acknowledgement
Silence PB Pressed
Reset PB Pressed
Test PB Pressed

Visual Alarm

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C
SIGNATURE

BHEL
SIGNATURE

DATE

CONTROL INSTRUMENTATION
STATION

STANDARD CHECK LIST

SHEET 2 OF 2

INSTRUMENT : ALARM ANNUNCIATION EQUIPMENT


N.T.P.C. TAG NO.
2.

UNIT:

Check the Alarm Sequence : For group alarms, alarm reflash facility will be provided as
indicated bellow:
Event Designation
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11

Normal
Alarm Point - 1
Silence PB Pressed
Acknowledge PB pressed
Alarm Point - 2
Silence PB Pressed
Acknowledgement PB
Pressed
Return to normal (either or all)
before acknowledgement
Return to normal (either or all)
after acknowledgement
Silence PB Pressed
Reset PB Pressed

Audible
Alarm (1)

Audible Alarm (2)


(Ring back)

Off
Fast flashing
Fast flashing
Steady on
Fast flashing
Fast flashing
Steady on

Off
On
Off
Off
On
Off
Off

Off
Off
Off
Off
Off
Off
Off

Fast flashing

Off

On

Slow flashing

Off

On

Fast flashing
Off

Off
Off

Off
Off

Visual Alarm

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C
SIGNATURE

BHEL
SIGNATURE

DATE

CONTROL AND INSTRUMENTATION


STATION

STANDARD CHECK LIST

SHEET 1 OF 10

INSTRUMENT : ELECTRONIC MODULES OF DDCMIS

SUPPLIER_____________________________________________________
MANUFACTURE_____________TYPE________SERIAL NO.____________
RANGE______________________INPUT___________OUTPUT__________
POWER SUPPLIES___________VOLTS________AMPS________HZ_____
PLANT SYSTEM___________________________LOCATION____________

NO.

1.0

ACTIVITY

REMARKS

GENERAL WIRING, POWER SUPPLY


1. Ensure that the maxiterms connections and Past-on
connections are OK in the back plane. They should be
firm and loose strands should not touch any other
pins.
2. Ensure that no mix up between signal, shield and
O Wiring

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROL AND INSTRUMENTATION


STATION

STANDARD CHECK LIST

SHEET 2 OF 10

INSTRUMENT : ELECTRONIC MODULES OF DDCMIS


NO.

ACTIVITY

REMARKS

3. Earthing practice is as per EDN drawings and electronic


earth/protective earth are separately maintained as per
EDN Product Standard SN0001 or that issued specific to
the Project.
4. 70BL02/70BL03 cable connections are firm.
5. Cooling fan direction is okay so that the air drawn from
bottom is thrown upwards. Ensure all the fans (3 per
rack) are working allright.
6. Protective doides in the back plane PCB (DN, DI, CK,
ADR & Z) are healthy.
7. Module connections are clean and pins are not shorting
especially, near the 70BLO1 cover. Addresses are set
correctly and links/switches are in the right position as
per O & M Manuals.
8. Ensure that 24 V DC power supply (Incoming) at the
terminals of the individual panels.
Nominal Voltage :
Variation
Ripple

24V DC

22.5V to 30 V (At panel Input)


:

0. 1V RMS Peak to Peak

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROL AND INSTRUMENTATION


STATION

STANDARD CHECK LIST

SHEET 3 OF 10

INSTRUMENT : ELECTRONIC MODULES OF DDCMIS

NO.

ACTIVITY

REMARKS

9. Ensure proper distribution of power supplies to TF


(Release), TQ (Ack), TL (Lamp Test), SOB Inter panel
connections and synchronisation signal wiring to
FV01s from diagnositc station as per relevant
documents.
10. Ensure proper distribution of supply to individual racks
from XT382 module in all panels
11.Alter termination of cables in the panel ensure blocking
of holes in the bottom plates by glands or mortar.
12. Always ensure that EPROMS are properly labelled
with revision numbers mentioned thereon. Check for
correct polarity of EPROM placements in their
designated locations.
13. Dust accumulation inside the panel to be removed.
B. INPUT MODULES
1. Alarm signal should not appear in healthy state.
2. Ensure diagnostics is working under conditions of wire
break, short circuit, supply failure etc.
3. Appropriate compensating resistors are used in case of
EA04 modules. (Between pins 17 and 19).

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROL AND INSTRUMENTATION


STATION

STANDARD CHECK LIST

SHEET 4 OF 10

INSTRUMENT : ELECTRONIC MODULES OF DDCMIS


ACTIVITY
4.

External resistors are to be mounted across field contacts


wired to 70EB03 modules wherever required.

5.

Ensure correct switch settings for each module.

6.

The input signal should be free from the following


disturbances (to be checked with a CRO in case of
malfunction).

7.

i.

50Hz line disturbances

ii.

Process disturbances

iii.

Contact bounces

Verify the connections of signals and US/Z according to


the sensor requirement.
In case the disturbances are there, suitable methods are
to be used to suppress the noise. (Eg., Checking the
shield of cables for grounding at the source, twisting of
cables).

C. OUTPUT MODULES
1.

Alarm signal should not appear in healthy state.

2.

Diagnostic responses like module failure, missing PCB


response are to be checked.

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROL AND INSTRUMENTATION


STATION

STANDARD CHECK LIST

SHEET 5 OF 10

INSTRUMENT : ELECTRONIC MODULES OF DDCMIS


ACTIVITY
D. DRIVER CONTROL MODULE
1.

Ensure that correct application of EPROM is put properly


with correct polarity.

2.

Handle the EPRPOMs with care and store them in anti


static tubes.

3.

Power Supply is reaching A/M


buttons/Lamps in control room etc.,

4.

Interface signals are ok.


i.

stations,

Push

Check back signals from torque/limit switch/Position


feedbacks.

ii.

Command outputs through Relays/E/P convertor


Actuator.

5.

Module is not in Simultation mode.

6.

The protection logic is in order for all the outputs.

7.

The output telegrams are all OK.

8.

Diagnostic Information
conditions.

is

proper

for

various

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

fault

CONTROL AND INSTRUMENTATION


STATION

STANDARD CHECK LIST

SHEET 6 OF 10

INSTRUMENT : ELECTRONIC MODULES OF DDCMIS


ACTIVITY
9.

Ensure correct drive control standard functions are


programmed, line number 0400 onwards and mode
selection etc.,

10. In case of 70AS06 module, ensure feedback transmitter is


properly terminated, grounding of the valve position,
feedback cable should be strictly avoided.
11.

Check hardwired protection if provided, is properly


terminated.

12. Ensure calibration of 70AS06 output with load (4-2mA/


0-10V)
E. PROCESSOR MODULE
1.

Correct version of firmware is used as per relevant


document.

2.

Application EPROMs with correct application programme


numbers are used.

3.

Parameters are set according to the scheme using


70SK06 or using Diagnositc station.

4.

Fault annunciations are all right under all fault conditions.

5.

Diagnostic EPROM reading facility is enabled or not.

6.

Processor numbers are correctly set (In the windows


provided in the front plate of the module) when there is
more than one processor module in a local bus.

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROL AND INSTRUMENTATION


STATION

STANDARD CHECK LIST

SHEET 7 OF 10

INSTRUMENT : ELECTRONIC MODULES OF DDCMIS


ACTIVITY
7.

Program End statement is programmed after the user


programme in all processor modules.

8. In case of 70PR05 modules configured in hot standby


mode, ensure that the inter processor data transfer address
range is beyond the last service address used in 70BK02
module.
F. COMMUNICATION MODULE
1.

Ensure wiring is OK between


XV7713/70FA01.

70BK02, 70FV01 nad

2.

All the modules inside XV7713/70FA01 are placed


properly.

3.

RC circuit is soldered and placed properly at the


beginning and at the end of the Intra Plant Bus Cable.
(XV/FA Boxes).

4.

IP bus is terminated properly in all the panels with proper


lugs. Ensure that coaxial cables are laid and terminated
as per the relevant guidelines.

5.

To reduce disturbances, ensure that the IPB cable is


earthed at more points. (Multiple earthing).

6.

In case 70BK02b is used with 70FV01A ensure proper


modifications are done as per Manual .

7.

Alarm signal should not appear in any of the 70BK02 and


70FV01 modules.

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROL AND INSTRUMENTATION


STATION

STANDARD CHECK LIST

SHEET 8 OF 10

INSTRUMENT : ELECTRONIC MODULES OF DDCMIS


ACTIVITY
8.

In 70BK02 modules ensure that line numbers 0016 and


0017 are programmed with DF02 and 03FF respectively
to enable EPROM reading facility from Diagnostic Station.

9.

In 70BK02 modules ensure that word marshall


programme, starting from line number 0400, the BK
numbers are called in the ascending order, as otherwise
the module will not function.

10. Ensure earthining link is soldered in all XV modules.


11.

After IPB is commissioned, check the changeover


operation of redundant Intra Plant Bus trafic directors
(70FV01).

G. DIAGNOSTIC STATION/SOE STATION


1.

Ensure that correct version of firmware is loaded in


70SK33 module in proper locations.

2.

In the 70SK33 module in which application program is


loaded no RAMs shall exist in any of the sockets.

3.

Ensure that there are no extra RAMs/EPROMs/PROMs


exist in any module.

4.

The operation of the DC/DC Convertor modules are OK


and the outputs are within permissable limits.

5.

Check the inter connection cables/FKB for SOE operation.

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROL AND INSTRUMENTATION


STATION

STANDARD CHECK LIST

SHEET 9 OF 10

INSTRUMENT : ELECTRONIC MODULES OF DDCMIS


ACTIVITY
6.

Ensure that no Diagnostic/SOE station modules (Micro


computer modules) are inserted/pulled out in power-on
conditions.

7.

Ensure that the word 02 is marshalled to 01 in diagnostic


station as this synchronization word is used in all the P13
local buses.

8.

Ensure that a 70BK01 module is provided in Diagnostic


station with address 01 and the pin 13 of this module is
hardwired to all 70FV01 modules (Pin 95) to enable all
70FV01 modules to float 01 address and at the same time
to have synchronism in flashing of lamps on the desk Pin
95 of 70BK02 modules is hardwired to all 70KB10
modules (if exist -- Pin 61) to enable them to start the milli
second counter at the same time.

9.

Ensure that the 70BV05 module cycle time is selected as


20mS in both diagnostic station and the SOE station.

10. When both SOE and Diagnositc Station are supplied for a
project, programme SOE as the MASTER and the
Diagnostic station as SLAVE.
11.

Marshall the words 02,03, FE from SOE station into


Diagnostic station.

12. Program the words 02, 03, FE of SOE station in all IPBs.
Use either 70SK06 or Diagnostic station so that the listing
is sorted.
13. Ensure that the SOE command word is transmitted to all
stations wherever 70EB10 modules are located.

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROL AND INSTRUMENTATION


STATION

STANDARD CHECK LIST

SHEET 10 OF 10

INSTRUMENT : ELECTRONIC MODULES OF DDCMIS


ACTIVITY

14. Check the jumper settings and correct installations of


RAM, PROM, application EPROMs, Firmware EPROMs
as per Manual.
15. Refer to Annexure 2 for typical printer settings and printer
cable connections.

II. FIELD CONNECTIONS


1.

Ensure signal/shields are properly terminated to avoid


interference.

2.

Ferrules to be provided for all used cable cores in junction


boxes and unused cable entries used to be plugged.

I. FLAME SCANNER
1.

Ensure that proper jumper selections are made in the


power supply module, depending on the UPS voltage
available. (110V AC or 230V AC) These settings are to be
made after taking the module out of the rack.

2.

Do not remove or insert any module under Power-on


conditions.

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROLS & INSTRUMENT


STATION

STANDARD CHECK LIST

SHEET 1 OF 2

INSTRUMENT : Cold Junction reference box

SUPPLIER_____________________________________________________________
MANUFACTURER_____________ TYPE _____________ SERIAL NO. ___________
RANGE_____________ INPUT_____________ OUTPUT_______________________
POWER SUPPLIES_________ VOLTS_____________ AMPS _______ HZ _________
PLANT SYSTEM_____________________ LOCATION__________________________

TAG NO.

UNIT
ACTIVITY
1. Check for any physical damages of the components
mounted in the above box.
2. Check that the box nameplate and tag no. as per approved
product specification.
3. Check the base plate is fixed in to a IP 55 FRP Enclosure.
4. Check the power supply terminals are suitable for receiving
power supply as per envisage in contract.
5. Check the cable entry & cable gland size and suitable for
receiving incoming power supply cable and signal cable.
6. Ensure the wiring connection are done as per wiring
diagram.
7. Check and ensure all TB and cable glands are tight
Defective & Omission Continuation Overleaf

REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROLS & INSTRUMENT


STATION

STANDARD CHECK LIST

SHEET 2 OF 2

INSTRUMENT : Cold Junction reference box


TAG NO.

UNIT
ACTIVITY
8.

Check all grounding terminals are tight.

9.

Ensure healthiness of special insulator provided for the


Reference Thermo couple & RTD are mounted in the box.

10. Check all LED indicates the status as specified in the


wiring diagram.
11.

Check healthiness of Thermocouple and RTD elements


with proper polarity and colour code.

12. Check the function of incoming power supply isolation


MCB.

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

ELECTRICAL
STATION :
STANDARD CHECK LIST
PLANT AREA : DC POWER CABLE

SHEET 1 0F 1
REF NO: E.

UNIT NO. ______________________________ PANEL. NO. __________________


BOARD TITLE _________________________ CIRCUIT TITLE __________________
MODULE TYPE ______________________ SERIAL NO. ______________________
MANUFACTURER ______________________ SUPPLIER ______________________
CONTRACTOR / MANUFACTURER _______________________________________
TYPE __________________________________ RATING _____________________
CONTROL CIRCUIT VOLTAGE : _________________________________________
NO.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Activity

Remarks

Polarity checked
Cable gland checked for correct size and fixing
Correct cable no. tagged ot cable. Note no. and check routing
Termination replaced after test and checked for tightness.
Check against the cable schedule and confirm that the cable is of the
correct size, no. of cores, rating and construction
Check that the cable is clearly and permanently identified with the
correct no. at both ends.
Check the continuity and IR of each core to Earth and confirm that the
ferrule nos. at both ends of each core and correct.
If practicable, check that the cable is correctly routed and supported
throughout its length and is undamaged.
Check that the armour and gland are bonded and earthed where
applicable.
Where isulated gland plates are used, check the IR of the gland and
armour, disconnecting the one point of earth for the test.

Defective & Omission Continuation Overleaf


REMARKS
N.T.P.C.

BHEL

SIGNATURE

SIGNATURE

DATE

CONTROL & INSTRUMENTATION


STATION
STANDARD CHECK LIST
INSTRUMENT: THERMOCOUPLE ELEMENT & CONNECTING CABLE

SHEET 1 OF 2
SCL REF: 1.3.4

SUPPLIER_____________________________________________________
MANUFACTURE_____________TYPE________SERIAL NO.____________
RANGE______________________INPUT___________OUTPUT__________
POWER SUPPLIES___________VOLTS________AMPS________HZ_____
PLANT SYSTEM___________________________LOCATION____________
TAG NO.

UNIT:

NO.
ACTIVITY
1.
Check access for maintenance and safety.
2.

REMARKS

Check identification labels and check for correct


nomenclature. Compare with instrument schedule.

3.

Check that the instrument is clean and free from


damage

4.

Check that the instrument is installed as per drawings,


manufacturers instructions, plant requirements, NTPC
and Indian Standards.

DEFECTS & COMMISSIONS COTINUATION OVERLEAF

REMARKS
N.T.P.C.
SIGNATURE

BHEL
SIGNATURE

DATE:

CONTROL & INSTRUMENTATION


STATION
STANDARD CHECK LIST
INSTRUMENT: THERMOCOUPLE ELEMENT & CONNECTING CABLE

SHEET 2 OF 2
SCL REF: 1.3.4

TAG NO.
DUTY

UNIT:

NO.
ACTIVITY
5.
Check manufactures certificate. Check material type

REMARKS

and batch number and cheek the connection polarity.


6.

Check the compensating cable for correct type, polarity


and installation as in step 4.

DEFECTS & COMMISSIONS COTINUATION OVERLEAF

REMARKS
N.T.P.C.
SIGNATURE

BHEL
SIGNATURE

CONTROL & INSTRUMENTATION


STATION
STANDARD CHECK LIST
INSTRUMENT: PRESSURE /VACCUM SWITCH

DATE:

SHEET 1 OF 2
SCL REF: 1.5.2

SUPPLIER_____________________________________________________
MANUFACTURE_____________TYPE________SERIAL NO.____________
RANGE______________________INPUT___________OUTPUT__________

POWER SUPPLIES___________VOLTS________AMPS________HZ_____
PLANT SYSTEM___________________________LOCATION____________
TAG NO.

UNIT:

NO.
ACTIVITY
1.
Check that access for maintenance is safe and

REMARKS

adequate.
2.

Check that mounting and connection is satisfactory.

3.

Check that the instrument is clean & undamaged.

4.

Check that the type and range of switch fitted is as pet


the instrument schedule.

5.

Check that the labeling is correct.

6.

Check that the pipework installation is satisfactory and


that the tapping point is correct.

DEFECTS & COMMISSIONS COTINUATION OVERLEAF

REMARKS
N.T.P.C.
SIGNATURE

BHEL
SIGNATURE

CONTROL & INSTRUMENTATION


STATION
TEST PROCEDURE
INSTRUMENT: PRESSURE TRANSMITER

TAG NO.
NO.

DATE:

SHEET 1 OF 2
SCL REF: 1.5.5

UNIT:
ACTIVITY

REMARKS

1.

Test equipment required


1.1 pressure source with standard test gauge Accuracy
0.25%
1.2 multi range meter, MA & V, Accuracy +-0.1%.

2.

Check calibration of test equipment.

3.

Connect pressure source to transmitter and connect


meter in the output.

4.

Check the output ant 20% intervals up & down by


varying the input pressure accordingly.
Record the results on standard calibration sheet I.15.1.
allow for head corrections if necessary.

5.

Reconnect pressure & Electrical connections.

6.

Check calibration of test equipment.

DEFECTS & COMMISSIONS COTINUATION OVERLEAF

REMARKS
N.T.P.C
SIGNATURE

BHEL
SIGNATURE

CONTROL & INSTRUMENTATION


STATION
TEST PROCEDURE
INSTRUMENT: PRESSURE TRANSMITER
TAG NO.

DATE:

SHEET 2 OF 2
SCL REF: 1.5.5

UNIT:

NO.
ACTIVITY
7.
Head correction: should be applied at the rate of 0.1
kg/cm2/meter of height of transmitter above or below
tapping point where the process medium is water. In
the case of transmitters of range<50 kg/cm 2 a more

REMARKS

accurate head correction should be calculated.


8.

Acceptable errors.
Maximum error+-0.5%Fsd. Unless otherwise stated in
the contract specification or manufacturers literature.

DEFECTS & COMMISSIONS COTINUATION OVERLEAF

REMARKS
N.T.P.C
SIGNATURE

BHEL
SIGNATURE

CONTROL & INSTRUMENTATION


STATION
STANDARD CHECK LIST
INSTRUMENT: PRESSURE /VACCUM SWITCH

TAG NO.

DATE:

SHEET 2 OF 2
SCL REF: 1.5.2

UNIT:

NO.
ACTIVITY
7.
Check cable support, glanding, cable number and core
number are satisfactory.
8.

Check calibration using TP I.5.2

REMARKS

DEFECTS & COMMISSIONS COTINUATION OVERLEAF

REMARKS
N.T.P.CSIGNATURE

BHEL
SIGNATURE

DATE: