Sie sind auf Seite 1von 4

MPP 601 SUPERVISORY SKILL

1. WRITE REPORTS

2. PLAN WORK
PROGRAMMES

3. PLAN THE
RESOURSES

4. PLAN
ADMINISTRATIVE
FUNCTION

5. PLAN TRAINING
PROGRAMME

PLAN THE FORMAT


REPORT

GATHER SCOPE OF
WORK

IDENTIFY THE
RESOURCESS

PLAN, AUTHORIZE
AND APPROVE
LEAVE

IDENTIFY NEEDS

GATHER ALL THE


FACT

PREPARE
STATEMENT OF
WORK

CATEGORIZE THE
RESOURCES INTO
MAN, MACHINE
AND MATERIAL

ANALYZE NEEDS

PREPARE DRAFT

IDENTIFY AND
ASSIGN
MANPOWER, MAN
HOURS AND
MATERIALS
REQUIRED

HANDLE
MANPOWER
HEALTH AND
MEDICAL
PROBLEMS

COMMUNICATE
AND REPORT

HANDLE
DISCIPLINARY
ISSUES AND
DELIVER FIRM AND
FAIR DECISION

ACQUIRE
RESOURCES SUCH
AS TRAINER AND
PLACE

EDIT THE REPORT

PREPAIR JOB/WORK
CARDS/DOCKETS/S
LIPS/REQUESTS/OR
DERS

INTERPRET
DOCUMENT AND
MANUAL

ENSURE CORRECT
USAGE OF SOURCE
DOCUMENTS AND
FORMS (LEAVE,
OVERTIME, TEC)

SELECT WORKERS
FOR TRAINING

ORGANIZE SOCIAL
FUNCTION

ARRANGE
MANPOWER FOR
REPLACEMENT

FINALIZES AND
PRESENT THE
REPORTS

SCHEDULE
TRAINING TIME

MPP 603 TESTING, ADJUSTING AND BALANCING OF AIR CONDITIONING


SYSTEM
1. CARRY OUT AND PERFORM
TESTING, ADJUSTING AND
BALANCING PROCEDURE
PERFORM TESTING
PROCEDURE

2. AIR SYSTEM

ADJUSTING ALL AIR


HANDLING SYSTEM

PERFORM ADJUSTING
PROCEDURE

PERFORM BALANCING

3. PROCEDURES AND REPORT


WRITING OF TAB
INSTRUMENT RECORD,
INCLUDING TYPES, SERIAL
NUMBER AND DATES OF
CALIBRATION
PREPARE A FINAL TESTING,
ADJUSTING AND BALANCING
REPORT

EQUALIZING DEVICES
SHALL BE ADJUSTED

FLOW ADJUSTING, VOLUME


CONTROL DEVICES SHALL
BE USED

BALANCING BETWEEN
RUNS, SUB MAINS, BRANCH
MAINS AND BRANCHES
SHALL BE ACCOMPLISHED
TOTAL AIR SYSTEM
QUANTITIES SHALL BE
VARIED

APPROVED SYSTEM FLOW


DIAGRAM SHALL BE
SUBMITTED
THE REPORT SHALL BE
CERTIFIED

MPP 603 TESTING, ADJUSTING AND BALANCING OF AIR CONDITIONING


SYSTEM

1. CARRY OUT AND PERFORM


TESTING, ADJUSTING AND
BALANCING PROCEDURE

PERFORM TESTING PROCEDURE

1.1.1
Interpret and check the design of air ducts in accordance with the specifications
required.
1.1.2
Insert preliminary data on test report forms.
1.1.3
Make test the air velocity using Pitot tube and Flow measuring hoods equipment in
air ducts.
1.1.4
Measure and record the airflow of each terminal device in the system without
adjusting any terminal outlet.
1.1.5
Measure and record system static pressures using annometer.
1.1.6
Measure and record all required outdoor air, mixed air and supply air drybulb and
wetbulb temperature using sling psychometer.
1.1.7
Measure and record all coil entering air and leaving air drybulb and wetbulb
temperatures using sling psychometer.
1.1.8
Verify correct fan rotations and speeds using tachometer.

PERFORM ADJUSTING PROCEDURE

PERFORM BALANCING

1.1.9
Measure and record final fan motor full load amperages and voltages using
amprobe meter.
1.1.10
Use an electronic manometer, inclined manometer or differential pressure gauge to
verify space pressure differentials with all HVAC and exhaust air systems operating and all
doors and openings closed.

Das könnte Ihnen auch gefallen