PROYECTO : " MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA UBS EN LA LOCALIDAD DE LLUCANAYACU, DISTRITO
CAPTACIN
01
01.01
CAPTACIN
TRABAJOS PROVISIONALES
PARTIDA
01.01.01 CAMPAMENTO PROVISIONAL EN CAPTACIN
GRAFICO
ESPECIFICACIONES
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
UND
GLB
METRADO
PARCIAL GLB
METRADO
TOTAL GLB
1.00
1.00
01.02
TRABAJOS PRELIMINARES
PARTIDA
01.02.01 LIMPIEZA DEL TERRENO MANUAL
GRAFICO
ESPECIFICACIONES
N VECES
LARGO(m)
10.00
ANCHO(m) ALTO(m)
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
95.00
9.50
95.00
PARTIDA
01.02.02
GRAFICO
N VECES
LARGO(m)
10.00
ANCHO(m) ALTO(m)
9.50
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
95.00
95.00
01.03
MOVIMIENTO DE TIERRAS
PARTIDA
01.03.01
GRAFICO
N VECES
LARGO(m)
2
1
1
1
7.00
10.00
1.30
0.70
ANCHO(m) ALTO(m)
0.40
2.50
1.60
0.70
0.70
0.40
0.30
0.15
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
3.92
10.00
0.62
0.07
14.62
PARTIDA
GRAFICO
01.03.02
N VECES
LARGO(m)
10.00
ANCHO(m) ALTO(m)
9.50
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
95.00
95.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
0.45
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
0.45
0.45
PARTIDA
GRAFICO
N VECES
LARGO(m)
1.2
ANCHO(m) ALTO(m)
14.17
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
17.00
17.00
01.04
CONCRETO SIMPLE
PARTIDA
GRAFICO
N VECES
1
1
2
2
1
1
4
LARGO(m)
1.90
0.80
0.80
0.70
0.25
0.25
0.20
ANCHO(m) ALTO(m)
1.30
0.70
0.20
0.20
1.00
1.00
0.60
0.15
0.15
0.15
0.15
0.15
0.15
0.15
UND
M2
METRADO
PARCIAL M3
METRADO
TOTAL M3
0.37
0.08
0.05
0.04
0.04
0.04
0.07
0.69
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
1
LARGO(m)
10.00
ANCHO(m) ALTO(m)
0.50
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
5.00
5.00
01.05
CONCRETO ARMADO
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
# ELEM
LONG/PZA
2
1
1
2
1
2
2
2
1
1
1
36
46
40
10
13
6
6
5
5
46
10
2.51
2.21
1.10
6.92
8.92
1.92
1.40
0.85
1.10
1.62
8.92
1/4"
0.00
0.25
3/8"
31
0.56
1/2"
767.50
0.99
5/8"
0.00
1.55
TOTAL Kg
17.25
759.83
0.00
TOTAL Kg
777.07
LOSA DE BARRAJE
DIAMETRO
LONG TOTAL
PESO Kg/ml
PARTIDA
3/8"
ESPECIFICACIONES
N VECES
LARGO(m)
5/8"
180.72
101.66
44.00
138.40
115.96
23.04
16.80
8.50
5.50
74.52
89.20
GRAFICO
1/2"
ANCHO(m) ALTO(m)
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
BARRAJE
4
4
2
1
2
2
2
7.00
0.20
9.00
0.55
10.00
10.00
7.00
1.70
1.70
1.00
1.00
0.20
1.00
0.50
47.60
1.36
18.00
0.55
4.00
20.00
7.00
2
4
4
2
1
1.90
0.80
1.00
0.70
0.80
1.05
1.05
1.05
0.75
0.75
3.99
3.36
4.20
1.05
0.60
0.60
0.75
1.35
MUROS Y ALEROS
LATERALES
BARRAJE-PANTALLA
LATERALES
BARRAJE-PISO
BARRAJE-DENTELLON
MUROS-CIMIENTO
VLVULAS
MUROS LATERALES-CASETAS DE VALVULAS EXTERIOR
MUROS LATERALES-CASETAS DE VALVULAS INTERIOR
MUROS LATERALES-CASETAS DE VALVULAS INTERIOR
MUROS LATERALES-CASETAS DE VALVULAS EXTERIOR
113.06
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
BARRAJE
MUROS Y ALEROS
BARRAJE-PANTALLA
BARRAJE-PISO
BARRAJE-DENTELLON
MUROS-CIMIENTO
2
1
1
1
2
7.00
9.00
10.00
10.00
7.00
0.20
0.55
1.70
0.25
0.40
1.70
1.00
0.20
1.00
0.50
4.76
4.95
3.40
2.50
2.80
1
1
1
1
1.90
1.00
0.70
0.60
0.15
0.15
0.10
0.10
1.05
1.05
0.75
0.75
0.30
0.16
0.05
0.05
VLVULAS
MUROS-CASETAS DE VLVULAS-1
MUROS-CASETAS DE VLVULAS-2
MUROS-CASETAS DE VLVULAS-3
MUROS-CASETAS DE VLVULAS-4
18.96
01.06
REVOQUES
PARTIDA
GRAFICO
N VECES
2
4
4
LARGO(m)
ANCHO(m) ALTO(m)
7.00
1.00
0.60
1.70
0.80
0.60
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
23.80
3.20
1.44
28.44
01.07
N VECES
1
LARGO(m)
ANCHO(m) ALTO(m)
5.00
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
5.00
5.00
PARTIDA
GRAFICO
N VECES
TUBERIA DE LIMPIEZA
LARGO(m)
ANCHO(m) ALTO(m)
1.50
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
1.50
1.50
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
01.08
VARIOS
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
1
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
SUSTENTACION DE METRADOS
PROYECTO :
" MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA UBS EN LA LOCALIDAD DE
LLUCANAYACU, DISTRITO DE CHAZUTA-SAN MARTIN-SAN MARTIN"
LINEA DE CONDUCCION
02
02.01
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
PARTIDA
02.01.01 LIMPIEZA DEL TERRENO MANUAL
GRAFICO
ESPECIFICACIONES
N VECES LARGO(m) ANCHO(m) ALTO(m)
1
2144.29
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
2144.29
2,144.29
PARTIDA
GRAFICO
2144.29
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
2144.29
2,144.29
02.02
MOVIMIENTO DE TIERRAS
PARTIDA
02.02.01 EXCAVACION DE ZANJA MANUAL
GRAFICO
ESPECIFICACIONES
N VECES LARGO(m) ANCHO(m) ALTO(m)
1
2144.29
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
2144.29
2,144.29
PARTIDA
GRAFICO
02.02.02
ESPECIFICACIONES
2144.29
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
2144.29
2,144.29
PARTIDA
GRAFICO
2144.29
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
2144.29
2,144.29
PARTIDA
GRAFICO
2144.29
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
2144.29
2,144.29
02.03
614.41
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
614.41
614.41
PARTIDA
GRAFICO
1529.88
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
1529.88
1,529.88
PARTIDA
GRAFICO
2144.29
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
2144.29
2,144.29
02.04
02.04.01
VLVULAS DE PURGA
TRABAJOS PRELIMINARES
PARTIDA
02.04.01.01 LIMPIEZA DEL TERRENO MANUAL
GRAFICO
ESPECIFICACIONES
N VECES LARGO(m) ANCHO(m) ALTO(m)
1
1.00
1.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
1.00
1.00
PARTIDA
GRAFICO
1.00
1.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
1.00
1.00
02.04.02
MOVIMIENTO DE TIERRAS
PARTIDA
02.04.02.01 EXCAVACION PARA CAJAS
GRAFICO
ESPECIFICACIONES
N VECES LARGO(m) ANCHO(m) ALTO(m)
1
0.60
0.60
0.80
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
0.29
0.29
PARTIDA
GRAFICO
02.04.02.02
ESPECIFICACIONES
2.40
0.80
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
1.92
1.92
PARTIDA
GRAFICO
0.29
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
0.35
0.35
02.04.03
CONCRETO SIMPLE
PARTIDA
02.04.03.01 SOLADO E=4"
GRAFICO
ESPECIFICACIONES
0.60
0.60
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
0.36
0.36
PARTIDA
GRAFICO
02.04.03.02
ENCOFRADO Y DESENCOFRADO
ESPECIFICACIONES
0.90
0.60
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
2.16
2.16
PARTIDA
GRAFICO
4.16
0.60
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
4.99
4.99
02.04.04
1.00
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
1.00
1.00
PARTIDA
GRAFICO
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
02.05
02.05.01
VLVULAS DE AIRE
TRABAJOS PRELIMINARES
PARTIDA
02.05.01.01 LIMPIEZA DEL TERRENO MANUAL
GRAFICO
ESPECIFICACIONES
N VECES LARGO(m) ANCHO(m) ALTO(m)
1
1.00
1.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
1.00
1.00
PARTIDA
GRAFICO
1.00
1.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
1.00
1.00
02.05.02
MOVIMIENTO DE TIERRAS
PARTIDA
02.05.02.01 EXCAVACION PARA CAJAS
GRAFICO
ESPECIFICACIONES
N VECES LARGO(m) ANCHO(m) ALTO(m)
1
0.55
0.55
0.60
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
0.18
0.18
PARTIDA
GRAFICO
02.05.02.02
ESPECIFICACIONES
2.20
0.60
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
1.32
1.32
PARTIDA
GRAFICO
0.18
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
0.22
0.22
02.05.03
CONCRETO SIMPLE
PARTIDA
02.05.03.01 SOLADO E=4"
GRAFICO
ESPECIFICACIONES
0.55
0.55
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
0.30
0.30
PARTIDA
GRAFICO
02.05.03.02
ENCOFRADO Y DESENCOFRADO
ESPECIFICACIONES
0.60
0.40
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
0.96
0.96
PARTIDA
GRAFICO
3.03
0.55
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
3.33
3.33
02.05.04
1.00
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
1.00
1.00
PARTIDA
GRAFICO
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
02.06
02.06.01
PASES AEREOS
TRABAJOS PRELIMINARES
PARTIDA
GRAFICO
5.00
5.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
150.00
150.00
PARTIDA
GRAFICO
02.06.01.02
ESPECIFICACIONES
5.00
5.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
150.00
150.00
02.06.02
MOVIMIENTO DE TIERRAS
PARTIDA
GRAFICO
02.06.02.01
ESPECIFICACIONES
TORRE
CAMARA
4.00
4.00
3.50
3.50
4.00
4.00
3.50
3.50
3.00
3.00
2.50
2.50
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
144.00
144.00
91.88
91.88
471.75
PARTIDA
GRAFICO
02.06.02.02
ESPECIFICACIONES
TORRE
CAMARA
288.00
210.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
288.00
210.00
498.00
PARTIDA
GRAFICO
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
-2.70
-37.80
288.00
183.75
-52.50
378.75
PARTIDA
GRAFICO
93.00
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
111.60
111.60
02.06.03
CONCRETO SIMPLE
PARTIDA
02.06.03.01 SOLADO E=4"
GRAFICO
ESPECIFICACIONES
ZAPATAS
3.00
3.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
54.00
54.00
02.06.04
CONCRETO ARMADO
PARTIDA
02.06.04.01 ACERO DE REFUERZO FY=4200KG/CM2
LONGITUDES
GRAFICO
ESPECIFICACIONES
N VECES
# ELEM
LONG/PZA
12
6
6
20
6
26
2.90
6.05
1.70
5/8"
217.80
ZAPATA
COLUMNAS
PARTIDA
DIAMETRO
LONG TOTAL
1/4"
265.20
3/8"
0
1/2"
696.00
PESO Kg/ml
0.25
0.56
0.99
1.55
TOTAL Kg
66.30
0.00
691.82
338.03
TOTAL Kg
1096.15
1/4"
ESPECIFICACIONES
217.80
0.30
0.60
5/8"
265.20
GRAFICO
1/2"
696.00
5.00
5.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
18.00
36.00
54.00
PARTIDA
GRAFICO
ESPECIFICACIONES
ZAPATA
TORRE
CAMARA
3.00
0.30
2.50
0.50
3.00
0.60
2.50
0.50
0.70
5.00
1.40
0.30
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
37.80
5.40
52.50
0.45
96.15
02.06.05
REVOQUES
PARTIDA
GRAFICO
ESPECIFICACIONES
2.75
1.80
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
29.70
29.70
02.06.06
116.30
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
116.30
116.30
PARTIDA
GRAFICO
ESPECIFICACIONES
53.70
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
53.70
53.70
02.06.07
VARIOS
PARTIDA
GRAFICO
ESPECIFICACIONES
69.70
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
209.10
209.10
PARTIDA
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
1.00
2.04
2.20
2.48
2.84
3.32
3.92
4.60
5.36
6.28
7.28
8.40
9.60
59.32
PARTIDA
0.50
0.51
0.55
0.62
0.71
0.83
0.98
1.15
1.34
1.57
1.82
2.10
2.40
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
0.50
1.02
1.10
1.24
1.42
1.66
1.96
2.30
2.68
3.14
3.64
4.20
4.80
29.66
SUSTENTACION DE METRADOS
PROYECTO :
" MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALCION DEL SISTEMA UBS, EN LA LOCALIDAD DE
LLUCANAYACU, DISTRITO DE CHAZUTA-SAN MARTIN-SAN MARTIN"
SEDIMENTADOR
03
03.01
SEDIMENTADOR
TRABAJOS PRELIMINARES
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
13.80
ALTO(m)
5.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
69.00
69.00
PARTIDA
GRAFICO
03.01.02
ESPECIFICACIONES
N VECES
LARGO(m)
ANCHO(m)
13.80
ALTO(m)
5.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
69.00
69.00
03.02
MOVIMIENTO DE TIERRAS
PARTIDA
03.02.01 EXCAVACION DE ZANJA MANUAL
GRAFICO
ESPECIFICACIONES
N VECES
1
-0.5
-0.5
1
2
LARGO(m)
8.70
7.60
0.65
2.80
0.35
ANCHO(m)
2.50
2.50
2.50
1.15
2.50
ALTO(m)
1.30
0.45
0.60
1.40
0.40
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
28.28
-4.28
-0.49
4.51
0.70
28.72
PARTIDA
GRAFICO
03.02.02
ESPECIFICACIONES
N VECES
1
LARGO(m)
ANCHO(m)
13.80
ALTO(m)
5.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
69.00
69.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
69.00
ALTO(m)
0.10
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
6.90
6.90
PARTIDA
GRAFICO
N VECES
2
1
2
LARGO(m)
8.70
2.80
0.35
ANCHO(m)
0.50
0.50
0.50
ALTO(m)
1.30
1.40
0.40
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
11.31
1.96
0.14
13.41
PARTIDA
GRAFICO
N VECES
1.2
LARGO(m)
ANCHO(m)
15.31
ALTO(m)
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
18.37
18.37
03.03
CONCRETO SIMPLE
PARTIDA
GRAFICO
N VECES
LARGO(m)
1
1
ANCHO(m)
7.70
1.80
ALTO(m)
1.50
0.65
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
11.55
1.17
12.72
03.04
CONCRETO ARMADO
PARTIDA
GRAFICO
LONG/PZA
LONGITUDES
3/8"
1/2"
31
2
2
5
5
5
5
5
5
5
8
2
5
4
1.85
0.90
1.05
1.20
1.40
1.15
1.25
1.90
1.05
7.25
2.45
1.85
1.60
2.00
229.40
7.20
8.40
12.00
14.00
5.75
6.25
19.00
5.25
72.50
39.20
14.80
8.00
32.00
4
4
2
2
2
1
1
2
5
3
4
3
5
4
3
27
8.55
4.10
2.00
2.00
2.00
2.00
2.65
2.00
171.00
49.20
16.00
12.00
20.00
8.00
7.95
108.00
2.30
32.20
1.30
36.40
1/4"
0.00
0.25
3/8"
934.50
0.56
1/2"
0.00
0.99
5/8"
0.00
1.55
TOTAL Kg
0.00
523.32
0.00
TOTAL Kg
523.32
C
D
E
F
G
H
I
DIAMETRO
LONG TOTAL
PESO Kg/ml
GRAFICO
# ELEM
4
4
4
2
2
1
1
2
1
2
2
4
1
4
PARTIDA
N VECES
N VECES
4
4
4
2
2
2
2
2
4
LARGO(m)
7.70
0.35
0.35
1.20
1.20
1.20
1.20
1.80
0.50
ANCHO(m)
ALTO(m)
1.35
0.60
0.65
0.60
0.65
0.45
2.00
1.40
1.40
5/8"
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
41.58
0.84
0.91
1.44
1.56
1.08
4.80
5.04
2.80
60.05
PARTIDA
GRAFICO
N VECES
2
2
2
1
1
1
1
1
2
1
1
LARGO(m)
7.70
0.35
0.35
1.20
1.20
1.20
1.20
1.80
0.50
7.70
1.80
ANCHO(m)
1.10
0.60
0.65
0.60
0.65
0.45
2.00
1.40
1.40
1.50
0.65
ALTO(m)
0.15
0.15
0.15
0.15
0.15
0.10
0.15
0.15
0.15
0.15
0.15
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
2.54
0.06
0.07
0.11
0.12
0.05
0.36
0.38
0.21
1.73
0.18
5.81
03.05
REVOQUES
PARTIDA
GRAFICO
N VECES
2
2
2
2
2
2
1
1
2
1
2
2
1
LARGO(m)
7.40
0.20
0.20
0.15
0.45
0.80
0.80
6.50
0.70
0.40
0.50
1.50
0.50
ANCHO(m)
ALTO(m)
1.10
0.40
0.45
1.50
1.50
1.50
1.50
1.50
6.60
1.50
1.40
1.40
1.50
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
16.28
0.16
0.18
0.45
1.35
2.40
1.20
9.75
9.24
0.60
1.40
4.20
0.75
47.96
03.06
N VECES
1
LARGO(m)
3.00
ANCHO(m)
ALTO(m)
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
3.00
3.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
10.70
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
10.70
10.70
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
6.00
6.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
1
LARGO(m)
ANCHO(m)
ALTO(m)
UND
GLB
METRADO
PARCIAL GLB
METRADO
TOTAL GLB
1.00
1.00
SUSTENTACION DE METRADOS
PROYECTO :
" MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALCION DEL SISTEMA UBS, EN LA LOCALIDAD DE LLUCANAYACU,
DISTRITO DE CHAZUTA-SAN MARTIN-SAN MARTIN"
FILTRO LENTO
04
04.01
FILTRO LENTO
TRABAJOS PRELIMINARES
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
7.00
ALTO(m)
7.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
49
49.00
PARTIDA
GRAFICO
04.01.02
ESPECIFICACIONES
N VECES
LARGO(m)
1
1
1
ANCHO(m)
5.70
1.15
1.00
ALTO(m)
7.40
1.80
3.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
42.18
2.07
3.00
47.25
04.02
MOVIMIENTO DE TIERRAS
PARTIDA
GRAFICO
04.02.01
ESPECIFICACIONES
N VECES
LARGO(m)
1
1
1
ANCHO(m)
5.90
1.15
1.00
7.60
1.80
3.00
ALTO(m)
3.68
0.775
3.68
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
164.79
1.60
11.03
177.42
PARTIDA
GRAFICO
04.02.02
ESPECIFICACIONES
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
47.25
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
47.25
47.25
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
47.25
ALTO(m)
0.10
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
4.73
4.73
PARTIDA
GRAFICO
N VECES
2
2
LARGO(m)
ANCHO(m)
6.70
8.30
0.50
0.50
ALTO(m)
3.68
3.68
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
24.62
30.50
55.13
PARTIDA
GRAFICO
N VECES
LARGO(m)
1.2
ANCHO(m)
ALTO(m)
122.29
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
146.75
146.75
04.03
CONCRETO SIMPLE
PARTIDA
GRAFICO
N VECES
1
1
1
LARGO(m)
5.70
1.15
1.00
ANCHO(m)
7.40
1.80
3.00
ALTO(m)
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
42.18
2.07
3.00
47.25
04.04
CONCRETO ARMADO
PARTIDA
GRAFICO
LONG/PZA
3.90
1.40
3.90
3.90
1.40
5.00
3.90
1.40
3.90
7.10
3.90
1.40
3.90
3.50
2.30
1.65
29.00
37.00
48.00
15.00
48.00
15.00
23.00
10.00
8.00
6.00
7.00
23.00
17.00
16.00
6.00
4.00
8.00
6.00
7.30
5.60
1.80
1.80
2.90
1.80
7.30
2.65
2.30
7.10
2.80
1.00
1.00
1.75
0.60
2.10
1.40
3.90
1/4"
0.00
0.25
3/8"
2639.70
0.56
1/2"
658.90
0.998
5/8"
0.00
1.552
TOTAL Kg
0.00
1478.23
657.58
TOTAL Kg
2,135.81
G
H
I
DIAMETRO
LONG TOTAL
PESO Kg/ml
PARTIDA
# ELEM
12.00
12.00
10.00
11.00
11.00
16.00
17.00
17.00
15.00
16.00
9.00
9.00
7.00
16.00
6.00
10.00
1
1
1
2
1
1
1
3
1
1
1
1
1
8
1
1
1
8
GRAFICO
N VECES
2
2
2
2
2
6
2
2
2
4
1
1
1
2
1
1
3/8"
PAREDES
CAMARA DE DISTRIBUCION
Y ALIVIO
CAMARA DE DESAGUE
N VECES
6
4
2
2
4
6
2
8
2
4
LARGO(m)
ANCHO(m)
4.00
6.60
6.60
1.80
0.30
1.05
3.00
0.75
1.15
1.00
5/8"
78.00
85.80
30.80
480.00
132.60
47.60
117.00
454.40
35.10
12.60
27.30
112.00
13.80
16.50
211.70
207.20
86.40
54.00
139.20
27.00
167.90
79.50
18.40
42.60
19.60
23.00
17.00
224.00
3.60
8.40
11.20
187.20
1/2"
93.60
33.60
ALTO(m)
3.30
3.30
0.55
0.55
0.55
0.55
3.30
3.30
1.80
0.15
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
79.20
87.12
7.26
1.98
0.66
3.47
19.80
19.80
4.14
0.60
224.03
PARTIDA
GRAFICO
CAMARA DE DESAGUE
CIMENTACION
N VECES
3
2
1
1
2
3
1
4
1
2
1
1
1
2
1
1
1
LARGO(m)
4.00
6.60
6.60
1.80
0.30
1.05
3.00
0.75
1.15
1.00
5.70
7.40
7.40
2.05
2.05
1.15
6.60
ANCHO(m)
0.20
0.25
0.10
0.10
0.10
0.10
0.225
0.15
0.15
1.45
7.40
1.30
2.35
1.20
1.40
1.80
0.40
ALTO(m)
3.30
3.30
0.55
0.55
0.55
0.55
3.30
3.30
1.80
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
7.92
10.89
0.36
0.10
0.03
0.17
2.23
1.49
0.31
0.44
6.33
1.44
2.61
0.74
0.43
0.31
0.40
36.19
04.05
REVOQUES
PARTIDA
GRAFICO
N VECES
4
4
2
4
2
2
2
8
8
2
2
LARGO(m)
4.00
3.00
6.40
1.04
1.00
0.50
0.30
0.75
0.50
1.36
2.40
ANCHO(m)
ALTO(m)
3.30
3.30
0.60
0.60
0.60
0.60
0.60
3.30
3.30
3.30
0.60
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
52.80
39.60
7.68
2.50
1.20
0.60
0.36
19.80
13.20
8.98
2.88
149.59
04.06
LARGO(m)
ANCHO(m)
ALTO(m)
2.00
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
2.00
2.00
PARTIDA
GRAFICO
N VECES
1
LARGO(m)
ANCHO(m)
ALTO(m)
16.00
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
16.00
16.00
PARTIDA
04.06.03 CODO DE PVC SAL 4"x90
GRAFICO
ESPECIFICACIONES
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
3
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
3.00
3.00
04.07
CARPINTERA METLICA
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
04.08
MATERIAL FILTRANTE
PARTIDA
GRAFICO
N VECES
2
LARGO(m)
4.00
ANCHO(m)
3.00
ALTO(m)
1.20
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
28.80
28.80
PARTIDA
GRAFICO
N VECES
2
LARGO(m)
3.32
ANCHO(m)
2.26
ALTO(m)
0.08
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
1.20
1.20
PARTIDA
GRAFICO
N VECES
4
LARGO(m)
3.32
ANCHO(m)
2.26
ALTO(m)
0.08
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
2.40
2.40
PARTIDA
GRAFICO
N VECES
2
LARGO(m)
3.32
ANCHO(m)
2.26
ALTO(m)
0.08
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
1.20
1.20
PARTIDA
GRAFICO
N VECES
2
LARGO(m)
4.00
ANCHO(m)
ALTO(m)
3.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
24.00
24.00
PARTIDA
GRAFICO
N VECES
2
LARGO(m)
4.00
ANCHO(m)
3.00
ALTO(m)
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
24.00
24.00
SUSTENTACION DE METRADOS
" MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALCION DEL SISTEMA UBS, EN LA LOCALIDAD DE
LLUCANAYACU, DISTRITO DE CHAZUTA-SAN MARTIN-SAN MARTIN"
PROYECTO :
RESERVORIO DE FERROCEMENTO
05
05.01
GRAFICO
ESPECIFICACIONES
N VECES
1
LARGO(m)
ANCHO(m)
20.99
ALTO(m)
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
20.99
20.99
PARTIDA
05.01.02
GRAFICO
N VECES
1
LARGO(m)
ANCHO(m)
20.99
ALTO(m)
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
20.99
20.99
05.02
MOVIMIENTO DE TIERRAS
PARTIDA
05.02.01
GRAFICO
N VECES
1
1
LARGO(m)
ANCHO(m)
20.99
9.55
0.30
ALTO(m)
0.31
0.30
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
6.47
0.86
7.33
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
1
LARGO(m)
ANCHO(m)
20.99
ALTO(m)
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
20.99
20.99
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
1
LARGO(m)
ANCHO(m)
12.63
ALTO(m)
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
12.63
12.63
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
1
LARGO(m)
ANCHO(m)
8.36
ALTO(m)
0.31
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
2.58
2.58
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
1.2
LARGO(m)
4.75
ANCHO(m)
ALTO(m)
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
5.71
5.71
05.03
CONCRETO SIMPLE
PARTIDA
GRAFICO
N VECES
1
LARGO(m)
ANCHO(m)
12.63
ALTO(m)
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
12.63
12.63
PARTIDA
GRAFICO
UND
M3
METRADO
TOTAL M3
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
METRADO
PARCIAL M3
9.55
0.30
0.30
0.86
PERIMETRO=D
PERIMETRO=11.80ML
0.86
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
12.63
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
12.63
12.63
PARTIDA
GRAFICO
N VECES
LARGO(m)
20.39
ANCHO(m)
ALTO(m)
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
20.39
20.39
05.04
CONCRETO ARMADO
PARTIDA
GRAFICO
ESPECIFICACIONES
PERIMETRO=D
Pared
PERIMETRO=D
Pared
Cpula:
Cpula:
N VECES
1
1
1
1
AREA=x(a^2 + h^2)
AREA=x(a^2 + h^2)
LARGO(m)
ANCHO(m)
9.42
10.68
7.85
9.68
ALTO(m)
2.60
2.60
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
24.50
27.77
7.85
9.68
69.81
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
# ELEM
1
1
1.00
42.00
32.36
1.70
32.36
71.40
1
1
18.00
67.00
10.45
2.85
188.10
190.95
3
3
1
1
6.00
7.00
7.00
6.00
1.71
1.39
1.54
1.74
30.78
29.19
10.78
10.44
1/4"
0.00
0.25
3/8"
564.00
0.56
1/2"
0.00
0.99
5/8"
0.00
1.55
TOTAL Kg
0.00
315.84
0.00
0.00
TOTAL Kg
315.84
ACERO CUPULA
ACERO CUPULA
HORIZONTAL PAREDES
VERTICAL PAREDES
CASETA
DIAMETRO
LONG TOTAL
PESO Kg/ml
PARTIDA
GRAFICO
LONG/PZA
1/4"
N VECES LARGO(m)
1
1
1
1
ANCHO(m)
9.42
10.68
ALTO(m)
2.60
2.60
7.85
9.68
3/8"
1/2"
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
24.50
27.77
7.85
9.68
69.81
PARTIDA
GRAFICO
N VECES LARGO(m)
1
1
1
1
1
ANCHO(m)
9.42
10.68
ALTO(m)
2.60
2.60
7.85
3.60
4.20
1.30
1.30
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
24.50
27.77
7.85
4.68
5.46
70.27
PARTIDA
GRAFICO
UND
M3
METRADO
TOTAL M3
ESPECIFICACIONES
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
METRADO
PARCIAL M3
PAREDES RESERVORIO
CUPULA
CASETA
CASETA
LOSA SUPERIOR CASETA
1
1
2
1
1
9.90
0.08
2.60
0.08
1.30
1.30
0.15
2.06
0.70
0.53
0.29
0.25
8.77
1.35
1.50
0.15
0.15
1.67
3.83
05.05
REVOQUES
PARTIDA
GRAFICO
UND
M2
ALTO(m)
METRADO
PARCIAL M2
METRADO
TOTAL M2
2.60
7.85
24.50
N VECES
LARGO(m)
1
1
9.42
ANCHO(m)
7.85
32.36
PARTIDA
GRAFICO
UND
M2
ALTO(m)
METRADO
PARCIAL M2
METRADO
TOTAL M2
2.60
1.30
1.30
9.68
27.77
4.68
5.46
N VECES
LARGO(m)
1
1
1
1
10.68
3.60
4.20
ANCHO(m)
9.68
47.60
PARTIDA
GRAFICO
N VECES
LOSA DE FONDO
LARGO(m)
ANCHO(m)
ALTO(m)
7.07
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
7.07
7.07
05.06
N VECES
LARGO(m)
3.80
ANCHO(m)
ALTO(m)
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
3.80
3.80
PARTIDA
GRAFICO
N VECES
LARGO(m)
6.52
ANCHO(m)
ALTO(m)
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
6.52
6.52
PARTIDA
GRAFICO
N VECES
LARGO(m)
2.35
ANCHO(m)
ALTO(m)
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
2.35
2.35
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
3.00
3.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
4.00
4.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
05.07
CARPINTERIA METALICA
PARTIDA
05.07.01 ESCALERA DE GATO
GRAFICO
ESPECIFICACIONES
N VECES
1
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
1.00
ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
SUSTENTACION DE METRADOS
PROYECTO :
" MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA UBS, EN LA LOCALIDAD
DE LLUCANAYACU, DISTRITO DE CHAZUTA-SAN MARTIN-SAN MARTIN"
06
06.01
ALTO(m)
1,356.45
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
1,356.45
1,356.45
PARTIDA
GRAFICO
1,356.45
ALTO(m)
1.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
1,356.45
1,356.45
06.02
MOVIMIENTO DE TIERRAS
PARTIDA
06.02.01 EXCAVACION DE ZANJA MANUAL
GRAFICO
ESPECIFICACIONES
N VECES LARGO(m) ANCHO(m)
1
ALTO(m)
1,356.45
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
1,356.45
1,356.45
PARTIDA
GRAFICO
06.02.02
ESPECIFICACIONES
1,356.45
ALTO(m)
1.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
1,356.45
1,356.45
PARTIDA
GRAFICO
ALTO(m)
1,356.45
UND
M3
METRADO
PARCIAL M3
METRADO
TOTAL M3
1,356.45
1,356.45
PARTIDA
GRAFICO
ALTO(m)
1,356.45
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
1,356.45
1,356.45
06.03
ALTO(m)
77.56
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
77.56
77.56
PARTIDA
GRAFICO
ALTO(m)
240.60
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
240.60
240.60
PARTIDA
GRAFICO
ALTO(m)
227.26
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
227.26
227.26
PARTIDA
GRAFICO
811.03
ALTO(m)
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
811.03
811.03
PARTIDA
GRAFICO
ALTO(m)
1,356.45
UND
ML
METRADO
PARCIAL ML
METRADO
TOTAL ML
1,356.45
1,356.45
06.04
ACCESORIOS DE PVC
PARTIDA
06.04.01 TEE DE PVC SAP 1 1/2"
GRAFICO
ESPECIFICACIONES
N VECES LARGO(m) ANCHO(m)
ALTO(m)
1.00
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
ALTO(m)
1.00
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
ALTO(m)
3.00
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
3.00
3.00
PARTIDA
GRAFICO
ALTO(m)
1.00
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
ALTO(m)
2.00
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
2.00
2.00
PARTIDA
GRAFICO
ALTO(m)
1.00
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
ALTO(m)
1.00
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
ALTO(m)
1.00
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
ALTO(m)
1.00
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
06.05
VALVULA DE CONTROL
PARTIDA
06.05.01 CAJA PARA VALVULA COMPUERTA
GRAFICO
ESPECIFICACIONES
N VECES LARGO(m) ANCHO(m)
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
SUSTENTACION DE METRADOS
PROYECTO :
" MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA UBS, EN LA LOCALIDAD DE
LLUCANAYACU, DISTRITO DE CHAZUTA-SAN MARTIN-SAN MARTIN"
07
07.01
UND
LARGO(m)
ANCHO(m)
METRADO
ALTO(m) PARCIAL ML
482.66
ML
METRADO
TOTAL ML
482.66
482.66
PARTIDA
GRAFICO
UND
N VECES
1
LARGO(m)
482.66
ANCHO(m)
METRADO
ALTO(m) PARCIAL M2
1.00
M2
METRADO
TOTAL M2
482.66
482.66
07.02
MOVIMIENTO DE TIERRAS
PARTIDA
07.02.01 EXCAVACION DE ZANJA MANUAL HASTA 1.20M DE PROF.
GRAFICO
ESPECIFICACIONES
N VECES
LARGO(m)
ANCHO(m)
1
UND
METRADO
ALTO(m) PARCIAL ML
482.66
ML
METRADO
TOTAL ML
482.66
482.66
PARTIDA
GRAFICO
07.02.02
UND
ESPECIFICACIONES
N VECES
1
LARGO(m)
482.66
ANCHO(m)
METRADO
ALTO(m) PARCIAL M2
1.00
M2
METRADO
TOTAL M2
482.66
482.66
PARTIDA
GRAFICO
UND
N VECES
1
LARGO(m)
ANCHO(m)
METRADO
ALTO(m) PARCIAL M3
482.66
M3
METRADO
TOTAL M3
482.66
482.66
PARTIDA
GRAFICO
N VECES
1
LARGO(m)
ANCHO(m)
482.66
UND
METRADO
ALTO(m) PARCIAL ML
ML
METRADO
TOTAL ML
482.66
482.66
PARTIDA
GRAFICO
N VECES
LARGO(m)
1.2
ANCHO(m)
28.97
UND
METRADO
ALTO(m) PARCIAL M3
M3
METRADO
TOTAL M3
34.77
34.77
07.03
UND
ANCHO(m)
METRADO
ALTO(m) PARCIAL UND
UND
METRADO
TOTAL UND
80.00
80.00
SUSTENTACION DE METRADOS
PROYECTO : " MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALCION DEL SISTEMA UBS, EN LA LOCALIDAD DE LLUCANAYACU, DISTRITO
GESTION AMBIENTAL
08
08.01
GESTIN AMBIENTAL
CONSIDERACIONES GENERALES
PARTIDA
08.01.01 APLICACIN DE NORMAL AMBIENTALES
GRAFICO
ESPECIFICACIONES
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
UND
GLB
METRADO
PARCIAL GLB
METRADO
TOTAL GLB
1.00
1.00
08.02
PLAN DE REFORESTACIN
PARTIDA
08.02.01 PROTECCIN DE AREA SENSIBLES
GRAFICO
ESPECIFICACIONES
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
213.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
213.00
213.00
08.03
MANEJO DE BOTADEROS
PARTIDA
08.03.01 MANEJO DE BOTADEROS
GRAFICO
ESPECIFICACIONES
N VECES
LARGO(m)
ANCHO(m) ALTO(m)
213.00
UND
M2
METRADO
PARCIAL M2
METRADO
TOTAL M2
213.00
213.00
08.04
MANEJO DE CAMPAMENTOS
PARTIDA
08.04.01 INSTALACIN DE LETRINAS PROVISIONALES
GRAFICO
ESPECIFICACIONES
N VECES
3
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
3.00
3.00
PARTIDA
GRAFICO
N VECES
1
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00
PARTIDA
GRAFICO
N VECES
1
LARGO(m)
ANCHO(m) ALTO(m)
UND
UND
METRADO
PARCIAL UND
METRADO
TOTAL UND
1.00
1.00