Sie sind auf Seite 1von 17

ANNEX I: Photographs

Project information of CK-2 package

Road section at Tumlingtar needs delineation measures

Hairpin bend down at Sabhakhola needs barriers

Road Section at Tumlingtar

Photographs of CK Road/July 2015

1|Pa g e

Gabion barriers at Sabhakhola

Sabha Khola Bridge

Sabha Khola Bridge section

Chevron sign at Bridge approach

Photographs of CK Road/July 2015

2|Pa g e

Sharp Bend without delineation

Building inside the RoW

Delineator post at the curved section

small cutting may ease the driving

Photographs of CK Road/July 2015

3|Pa g e

Insufficient delineation

Building at the center of the hairpin bend

Talking with local regarding road safety

Describing the safety by local

Photographs of CK Road/July 2015

4|Pa g e

Delineation at Causeway

Insufficient delineation

Causeway delineation

A typical bus-bay

Photographs of CK Road/July 2015

5|Pa g e

Delineation

Existing parapet blocks at curves

Curve Section visibility

Chainpur

Photographs of CK Road/July 2015

6|Pa g e

CH 50+550 Causeway

Hair pin bend

narrow road at 52+000

Gabion at 53+000

Photographs of CK Road/July 2015

7|Pa g e

CH 53+800

CH 54+500

Public interaction at Kharang

Kharang Police Post

Photographs of CK Road/July 2015

8|Pa g e

Causeway delineation CH 58+000

Damaged causeway at CH 62+000

CH 62+800

CH 63+000 Causeway

Photographs of CK Road/July 2015

9|Pa g e

CH 64+400 Hairpin Bend

CH 65+350

CH 0+900 (CK-2)

Tumlingtar

Photographs of CK Road/July 2015

10 | P a g e

Lay Byes Tumlingtar

Tumingtar airport chowk

S- Curve sign

Hairpin bend at CH 9+000

Photographs of CK Road/July 2015

11 | P a g e

End point of CK-2

Chainpur Bazar

Interaction with Traffic Police at Chainpur

Chainpur Bazar Gate

Photographs of CK Road/July 2015

12 | P a g e

Chainpur with ARE Ravi Panta

Photographs of CK Road/July 2015

Kharang Bazar

13 | P a g e

Interaction on RS at Kharang bazar

At Kharang

Delineation for Culvert

CK 1 road Hairpin bend

Photographs of CK Road/July 2015

14 | P a g e

Kingring (Hairpin bend) CH 62+200 CK-1

Hair pin bend

Hairpin bend

Sabha Khola Bridge

Photographs of CK Road/July 2015

15 | P a g e

Bend at Sabhakhola

Delineation at Hairpin bend

CK 2 Road (with RE, ARE and contractor's representative)

End point of CK-2 Road

Interaction with Drivers of Land-Rover Jeep

Land Rover (Taxi) at Tumlingtar

Photographs of CK Road/July 2015

16 | P a g e

Photographs of CK Road/July 2015

17 | P a g e

Das könnte Ihnen auch gefallen