Sie sind auf Seite 1von 2

RULES FOR BUILDING AND CLASSING

STEEL VESSELS
2006
NOTICE NO. 1 January 2006
The following Rule Changes become EFFECTIVE AS OF 1 JANUARY 2006.
(See http://www.eagle.org/rules/downloads.html for the consolidated version of the 2006 Steel Vessel
Rules, with all Notices and Corrigenda incorporated.)
Notes -

The date in the parentheses means the date that the Rule becomes effective for new construction
based on the contract date for construction, unless otherwise noted. (See 1-1-4/3.3.)
COMMENTARY

For the 2006 edition, the ABS Rules for Building and Classing Steel Vessels Part 4: Vessel Systems and
Machinery were revised to facilitate the requirements of IACS Unified Requirements (UR) M66 and M67,
amongst other revisions.
The following relevant new ABS requirements were to be implemented on 1 January 2006 based on the above
IACS Unified Requirements:
1)

4-2-1/A3

Type Testing Procedure for Crankcase Explosion Relief Valves

2)

4-2-1/A4

Type Testing Procedure for Crankcase Oil Mist Detection/Monitoring and Alarm
Arrangements

However, IACS has withdrawn the UR M66 and M67 for further revisions and it is expected that uniform
implementation date for the updated URs will be now 1 January 2007 (instead of original implementation
date of 1 January 2006).
Accordingly, the above requirements (4-2-1/A3 and 4-2-1/A4) are withdrawn from the 2006 Rules edition by
this Rule Change Notice.
Furthermore, the additional new requirements 4-2-1/7.1.2vii) and 4-2-1/7.2.1 of the 2006 Rules edition, which
make references to the withdrawn 4-2-1/A3 and 4-2-1/A4 respectively, are also withdrawn.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2006

Notice No. 1 January 2006

PART 4

VESSEL SYSTEMS AND MACHINERY

CHAPTER 2

PRIME MOVERS

SECTION 1

DIESEL ENGINES

Engine Appurtenances

7.1

Explosion Relief Valves


7.1.2

7.2

Valve Construction and Sizing (2006)


(Delete text of Item 4-2-1/7.2.1vii) and replace with <No Text>.)

Oil Mist Detection/Monitoring Arrangements (2006)


(Revise 4-2-1/7.2.1 as follows.)
7.2.1

General (1 January 2006)


Where crankcase oil mist detection/monitoring arrangements are fitted to engines, they are to
be of an approved type.

PART 4

VESSEL SYSTEMS AND MACHINERY

CHAPTER 2

PRIME MOVERS

SECTION 1

APPENDIX 3 TYPE TESTING PROCEDURE FOR CRANKCASE


EXPLOSION RELIEF VALVES (2006)
(Delete entire Appendix 4-2-1A3.)

PART 4

VESSEL SYSTEMS AND MACHINERY

CHAPTER 2

PRIME MOVERS

SECTION 1

APPENDIX 4 TYPE TESTING PROCEDURE FOR CRANKCASE OIL


MIST DETECTION/MONITORING AND ALARM ARRANGEMENTS
(2006)
(Delete entire Appendix 4-2-1A4.)

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS . 2006

Das könnte Ihnen auch gefallen