Sie sind auf Seite 1von 1

31050202001

02

CB-031749

C58

PLANT NO.

INDEX

NOTES:

of

00

02

JOB ORDER NO.

DRAWING NUMBER

SHEET NO. REV. NO.

1.

ALL DIMESNIONS ARE IN MILLIMETERS AND ELEVATIONS ARE IN

11674

(POWER TRANSFORMER ROOM NO. 1)

2. ALL PIPES ABOVE GROUND LEVEL ARE RSC.

12550

(POWER TRANSFORMER ROOM NO. 2)

3. ALL PIPES BELOW GROUND LEVEL uPVC CLASS 3.

(POWER TRANSFORMER ROOM NO. 3)

132KV GIS ROOM


CONTROL/RELAY ROOM
406.94
TO POWER TRANSFORMER
600

CONTROL BOX

CABLE
SPARES

2525

1450

FOR PILOT WIRE

OPENING
FOR

CLASS 3

FROM S/S 8828

SPARE
1200

CABLE
-2.95

1450

SPARES

TUNNEL

-2.95

-3.15

-2.95

SECTION

S.1

132KV U/G FEEDERS

WALL

11550

12600

7550

REPRODUCTI
ON I
N FULL OR I
N PART SHALL BE OBTAI
NED FROM

250

TUNNEL
-2.95

FOR 3-1Cx1200 sq.mm CABLE

1450mm

1200

FOR PILOT WIRE

FROM S/S 9010

250

FOR

400

OPENING

1200

1200mmx

132KV GIS ROOM BASEMENT

WALL
1450

2650

2085

132KV U/G FEEDERS

1450mm

13.8KV SWITCHGEAR ROOM

132KV GIS ROOM

BATTERY ROOM

(SECTION "C)

SPARES

132KV GIS ROOM BASEMENT

13.8KV SWGR ROOM


SECTION "C"
BASEMENT

400
3200

400 400 400

1600

6400
520 350 350 350 350

FOR 10-3Cx300 sq.mm CABLE


300

400

SPARES

-2.95

-3.15

5400

1000

[1 no. SPARE]

FOR 12-1Cx630 sq.mm MV CABLES

FOR 8-3Cx300 sq.mm CABLE

TO 13.8KV SGWR. ROOM BASEMENT

EXISTING 8M WIDE ASPHALT ROAD

VACANT
LOT

TO TURFIYAH ROAD

EXISTING 15M WIDE ASPHALT ROAD


TANK

WORKSHOP

WORKSHOP

SECTION

GASOLINE
STATION

S.1

WATER

13.8KV U/G FEEDERS

SACO

ROAD
SHAHERA

300

13.8KV U/G FEEDERS

D
TROA
L
SPHA
DEA
NG8M WI
STI
XI
E

CLASS 3

NG AREA
SACO PARKI

-2.95

S/S 8826

[1 no. SPARE]

400

300

400

KEY PLAN:

WI
DE LANE

FOR PILOT WIRE

FROM S/S 8828

ROAD I
NSI
DE SUBSTATI
ON

7
12600

PANDA
MARKET

7550

13.8KV SWITCHGEAR ROOM

132KV GIS ROOM

ROOM NO. 2

BATTERY ROOM

(SECTION "B)

132KV GIS ROOM BASEMENT

ROAD I
NSI
DE SUBSTATI
ON

60MVA POWER TRANSFORMER

REFERENCE DRAWINGS
DRAWING TITLE

EDGE OF ASPHALT

SUBSTATI
ON BOUNDARY

LI
NE

11550

CO.NO

WORKSHOP

ELECTRI
CI
TY

SUBSTATI
ON BOUNDARY

132KV U/G FEEDERS

ROOM NO. 1

FUTURE 8M

LI
NE

FOR 3-1Cx1200 sq.mm CABLE

60MVA POWER TRANSFORMER

EDGE OF ASPHALT

SPARE

1200

FOR 3-1Cx1200 sq.mm CABLE

1200mmx

CLASS 3

1259.45

1250

3150

1450

1200

250

1250

2085

1250

LEGEND:
-0.80

13.8KV SWGR ROOM


SECTION "B"
BASEMENT

DRAWING NO.

DRAWING CONTROL SHEET

CE-031495

SUBSTATION EQUIPMENT LAYOUT

CB-031646

[1 no. SPARE]
FOR 10-3Cx300 sq.mm CABLE

Contractor:

13.8KV U/G FEEDERS


-2.95

-2.95

KADITrading & Contracting Company Limited

-3.15

P.O. Box 3111 Riyadh 11471

5400

1000

Tel. 463 1224 / 217 2005

FOR 12-1Cx630 sq.mm MV CABLES

FOR 3-1Cx1200 sq.mm CABLE

SECTION

TO 13.8KV SGWR. ROOM BASEMENT

132KV U/G FEEDERS

AS-BUILT

S.1

BY

THOMAS VARGEESE

DATE

12/09/2012

FOR PILOT WIRE

FROM S/S 9010

AS-BUILT

SPARES

12600

7550

60MVA POWER TRANSFOMER

13.8KV SWITCHGEAR ROOM

132KV GIS ROOM

SECTION "A"

ROOM NO. 1
DRAWN BY

ACKATIGBAK

CHECKED BY

AFTAB ALAM

SCALE

1 : 80

FOR 1-3Cx300 sq.mm CABLE


FROM RMU-2 TO 13.8KV SWGR. ROOM

DATE STARTED

22.06.08

22.06.08

DATE COMPLETED

SECTION "C" BASEMENT


OPRG. DEPT.

13.8KV SWGR ROOM

2210

SECTION "A"

ENG. DEPT.

CABLE TUNNEL

132KV GIS ROOM BASEMENT

APPROVAL/CERTIFICATION INFORMATION
CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED

480 350 350 350


400 400 400

CLASS 3

CLASS 3

SPARES

SPARES

-3.15

-3.15

400 400 400

1850

DDC NO.

REV. NO.

1200x1450 WALL OPENING

132KV CABLES
300

1500

1280

300

300

1240

THI
S DRAW I
NG

THIS DRAWING IS NOT TO BE USED FOR

BASEMENT

ELEV. VARIES

SECTIONS
132/13.8kV SUBSTATION 8826

AL QASSIM

SECTION
JOB ORDER NO.

INDEX

PLANT NO.

SAUDI ARABIA
DRAWING NUMBER

S.1

SHEET NO. REV. NO.


02

31050202001 R

C58

CB-031749

of
02

00

SEC-B (2004/10)

EDMS

DGN_262

OF SAUDI

13326

AND THE I
NFORMATI
ON CONTAI
NED HEREI
N ARE THE SOLE PROPERTY

THI
S DOCUMENT W I
THOUT THE W RI
TTEN CONSENT OF I
TS OW NER.

METERS UNLESS OTHERWISE NOTED.

SECB00