Sie sind auf Seite 1von 12
oS SAMKG (Q07-14-MEP-ME-0162-09 23 June 2009 MIDMAC CONTRACTING Co. W.L.L P.O BOX 1758 DOHA QATAR Attn.: Mr. JACK GHANTOUS: PROJECT DIRECTOR — Ee} LAA ray | ‘Subj. : AL SADD DEVELOPMENT COMPLEX -528 PROJECT (CoO [PY ELECTROMECHANICAL WORKS SONS \ HYDRAULIC CALCULATION FOR WET RISER SYSTEM COMMON BASEMENT Dear Sir, Please find attached herewith Hydraulic Calculation for Wet Riser System Common Basement for your ‘approval as prepared by the Chil Defense approved specialist fire fighting company, NAFFCO. SAMIKO INTERNATIONAL CO. VEL. | ep atti to 3) oto 457 ana ie a Garay abs wea Hs 506 elise Sie Se BARWA ‘ Barwa Real Estate Co. DA \ SrA Fa Nr HA, el No 8 NT eechernpamcenend BLAS INVEA Gage HVELEYAYA ae AVE LEVY gpd Telephone +974 4477960 Fax 4974 4A77E4E 0, 80x 1148 Bcha Qatar | INSULTANT: Pree aera —— _ | CONTRA\ MIDMAG MIDMAC CONTRACTING CO. WLL | | P.O. Box 1758 Doha, Qatar Tel. No. 452 9452 Fax. No. 444 0864. TECTION BY A’ NAFFCO QATAR FIRE PROTECTION & SAFETY DIVISION Liget] WORLD LEADERS IN FIRE PROTECTION SYSTEMS P.O. BOX 22428, DOHA-OATAR, TEL+ (0974) - 4584168 FAX: (0974) - 4095174 PROJECT AL SAAD DEVELOPMENT COMPLEX TITLE COMMON BASEMENT. | HYDRAULIC CALCULATION FOR WET RISER SYSTEM | DRAWN | RAGHU | CHECKED | WK | APPROVED | OR | DATE 21.06.09! REF No _RFC“011~FF-ASDCMHOAL=02 | @ataR NAFFCO QATAR IRL PROTECTION & SAPETY DIVISION THt9co IE FCONtH AOI Ena lemons Wee unainse ——, I [ Project: I ‘Al Saad Development Complex faces DP sune 2000 | 4 | Main Contractor: | Mis, MIDMAC Contracting co. —— = 2009 | \ | MEP Contractor | WIE SAMRO THerratonal Rev 2 | (Consultant: [Mis 2EB HYDRAULIC CALCULATION FOR WET RISER SYSTEM a 2_| 21 "JUNE ‘G9 |" REVAS PER COMMENTS DATED 06.06.09 | RAGHU | Hu GP“Enor DR 1 | 26" May 09 | REVAS PER COMMENTS DATED 16.05.09” | PKs HuK | Engr DR 0 | 9 May 09 ISSUED FOR APPROVAL PKS HK Engr. OR Rev Date Description Prepared by | Checked by | Approved by kag s¥sTEms, Ine 4792 LAVISTA ROAD TUCKER, GA 30084 HYDRAULIC CALCULATIONS FOR AL SAAD DEVELOPMENT COMPLEX = APARTMENT -2,B,¢ WITH COMMON BASEMENT NAFFCO QATAR-FIRE PROTECTION & SAFETY DrvistoN SRINA STREET ~ P.O. BOX 22428 DORA OATAR DRAWING NUMBER:RFC-011-FF-ASOC-HCAL+02 Dare: 21-06-09 DESIGN DATA SYSTEM 2 STANDPIPE sySTEM DESIGN STANDARD 1 NEPA - 14 REMOTE AREA LOCATION OCCUPANCY CLASSIFICATION OCCUPANCY AREA NOS. OF LANDING VALVE CONSIDERED NOS. OF RISER CONSTDERED : FLOW AND PRESSURE @ REMOTE LY FLOW AND PRESSURE REQD. @ SOURCE : AS PER CALCULATION PUNE PROPOSED : CALCULATION REFERENCE : AUTHORITY HAVING JURISDICTION + noves: : APARTMENT - A chass-2 1 APARTMENT - A,B,C = COMMON BASEMENT 4 Nos. (BASED ON SPRINKLER SYSTEM PROPOSED FOR ENTIRE BUILDING) 3 Nos 2NOS LV IN REMOTE RISER (Aprnt A) INO LV IN RISER {Aprat B) 1NO LV IN RISER (Apemt ¢) 246nEM 0 6. 9BAR 1074,0GPM @ 10.647BAR 1250GEM @ 14, 5BAR REC-011-HCALL-ND-02 QATAR CIVIL DEFENCE Calculations performed by HASS 7.9 under license # 011081930, granted by ERS SYSTEMS, INC. TUCKER, GA 30084 USA. (Notes continue after pipe calculations results.) SPRINKLER SYSTEM BYDRAULIC ANALYSIS Page 2 DRIE: 6/22/2009TED ON 18.06.09\COMMON BASEMENT\RO\AL SAAD (CMM BSWNT) .SDF JOB TITLE: COMMON BASEMENT ATER SUPPLY DATA SOURCE STATIC. RESID. «= FLOW = AVAL, © TOTAL = REQ'D NODE, PRESS. PRESS. @ PRESS. @ DEMAND PRESS. TAS (AR) (DAR) (nem) AR) cory) (BRR) SOURCE cay 0.00 ai/ay 0.000 4065.1 10.847 AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 4065.1 LEM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 0.0 LPH OTHER ROSE STREAM ALLOWANCES 0.0 Py TOPAL DISCHARGE FROM ACTIVE SPRINKLERS 4065.1 LPM NODE ANALYSIS DATA NODE TAG ELEVATION «NODE TYPE PRESSURE DISCHARGE on (BRR) «L/MIN 1 W155 =360.00 6.900 vas.6 2 n188 7.103 aoe 3 W5.18 Vara 98a. a “5.15 tee 7.499 +e 5 6.95 ---- 7.940 --- 6 “1.55 2360.00 8.352 2040.4 1 1.58 wees 8.503 aches 8 6,98 nae 8am 7 2 6.95 nee 9.268 oa 10 6.95 ---- 10.232 --- a 1.55 9.253 1095.1 12 1.55 9.549 See 13 6.95 See eee eer a4 6.95 oe - 20.380 --- as 6.95 soo 1.403 nee 18 6.95 2 10.420 oe 7 8.05 wees 10.556 --- 18 8.08 nee 10.594 --- 13 3.95 ---- 10.787 --- SOURCE = -10.55 SOURCE, 10.847 4965.1 SPRINKLER SYSTEM AYDRAULIG ANALYSIS Fage 3 PATE: 6/22/20097ED OM 18.06.09\COMMON BASEMENT\RO\AL SAAD (CMN BSMNP) SDF JOB TITLE: COMMON BASEMENT PIPE DATA PIPE TAS QULPM) DIAQe) LENGTH PRESS. END -ELEV. NOZ. PT DISC. VEL (MPS) HNC) ant) suM. NODES (mM) (RY (BAR) (LPM) FL/M (BARI Pipe: 1 “945.6 62.71 PE 0.80 PF 0.202 1 “1:55 360.0 6.900 945.6 5.19 120 FIG 7 PE 0.000 2 1,550.0 7.1030 0.0987 12 4.16 BV -945.6 102.26 PL 3.60 PE 0.044 2 7.103 0.0 1.92 120 FIG ‘7 PE 0.353 4 7.499 0.0 0.0045 TL 8.70 BV -984.1 62.71 EL PF 0.026 3 7.473 98¢.1 5,31 120 PIG FE 4.000 4 7.499 0.0 0.0524 TL Pv Pipe: 4 ~1929.7 102.26 FL 12.10 BF 0.265 4 “5.15 0.0 7.499 0.0 3.82 120 FIG. «EG PE 0.176 “6.95 0.0 3.340 0.0 D.0168 TL 15.76 BV Pipe: 8 1929.7 102.26 PL 60.60 FF 1,327 5 “6.95 0.0 7.940 0,0 3.92 20 PTS ET PE 0.900 e “6.95 0.0 9.268 0.0 O.0le@ TL 78.50 Pv Pipe: & -1040.4 62,72 PL 0,50. PR 0.242 6 “1.85 260.0 8.352 1040.4 5.61 120 FIG 1 FE 0,000 7 “1.55 0.0 8.593 0.0 0.0581 TL «4.16 EV Pipe: 7 1040.4 102.26 FE 5.40 PF 0.049 “1.55 6.0 8.593 0.0 2.11 120 PIG) EG PE 0.529 8 “6.95 0.0 9.171 0.6 0.0054 TL 9.06 BV Pipe: @ 1040.4 102.26 PL «8.90 BF 0.097 8 “6.95 0.0 9.171 0.0 2.13 120 FTG) ET PE 0.000, 8 “5.95 0.0 9.268 0.0 0.0054 TL 18.08 ev Pipe: 9 2970.1 102.26 PL 19.70 FF 0.564 8 “6.95 0.0 9.268 0.0 6.03 120 FIG 1 FE 0.000 10 ~6.95 0.0 10.232 0.0 0.0374 TL 25.80 Pv Pipe: 10 2970.1 202.72 PL 79.40 PF 0.171 10 “6.95 0.010.232 9.0 1.53 120 FTG SE2T_PE 0.000 1s “6.95 0.0 10.403 0.0 0.0013 TL 128.19 ev Pipe: 11 1035.1 62,71 PL 0.98 PF 0.296 a 360.0 9.253 1095.1 5.91 120 FTG T PE 0.000 22 “LSS 0.0 9.549 0.0 0.0638 1 4.64 By Pipe: 12 ~1095.1 102.26 PL «8.40. PF 0.053 12 v1.85 0.0 9.549 0,0 2.22120 PTS_-—G PE 0.523 a “6.95 0.0 10.131 9.0 0.0059 TZ = 9,06 Pv SPRINKLER SYSTEM HYDRAULIC ANALYSIS. Page 4 DATE: 6/22/2009TED ON 19.06.09\COMMON BASEMENT\RO\AL SAAD (CMN BSMNT) .SDF JOB TITLE: COMMON BASEMENT PIPE TAG Q(LPM) DIAM) LENGTH PRESS. END ELEV, MOz. PT DISC. VEL (MPS) HMICI im sun. NODES (M)— (X)— (BAR) (LPM) FL/M (BAR) Pipe: 13 -1095.2 102.26 PL 31.70 PF 0.259 13 “6.95 0.010.131 0.0 2.22 120 FTG 2ET FE 4.000 4 6.95 0.019.390 0.0 0.0089 7 43.90 Pv Pipe: 14 202.72 PL 43.10 BF 0.013 14 =6.95 0.0 10.390 120 FTS «3B PE 0.000 35, “6.95 0.0 10.403, 0.0002 TL 59.57 BV Pipa: 15 4065.2 202.72 PL 1.75 BE 0.017 as “6.95 0.010.403 0.0 2.10120 FTG B FE 0.000 16 “6.95 0.019.420. 0.0024 ™% 7,24 BV Pipe: 4065.2 202.92 PL PF 0.028 16 0.9 10.420 0.0 2,10 120 FTG 7 PE O.1D8 7 0.0 10.856 0.0 0.0024 TE 2.77 ev Pipe: 17 4065.2 254.51 PL 3.00 PF 0.038 vv “8.05 0.010.556 0.0 1,33 120 FTG -37_PE 0.000 16 “8.05 «0.0 10.594 0.8 0.0008 TL 48.72 Fv Pipe: 18 4065.2 254.91 PL 1.90 BE 0.007 ae “8.05 0.0 10.594 0.0 «1.33120 FIG E PE 0.186 1 “9.95 0.0 10.787 9.0 O.on08 TL 8.61 BY Pipe: 19 4065.1 254,51 PL PF 0.001 19 9.95 0.010.787 0.0 4.33120 FIG PE 0.059 SOURCE -10.55 SRCE 10.847 (N/A) D.o008 TL Pv NOTES (RASS): (2) Calculations were performed by the HASS 7.9 computer program under license no. 5011061930 granted by HRS Systens, Inc 4792 LaVista Road Tucker, GA 30084 (2) Tho systom has been calculated to provide an averaue imbalance at each node of 0.0258 lpm and @ maximum imbalance at any node of 0.4905 1pm. (3) Total pressure at each node is used in balancing the system. Maximo water velocity is 5.03 m/sec at pipe 9. (4) PIEE FITTINGS TABLE Pipe Table Name: STANDARD. PTF SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page DATE: 6/22/20097ED ON 18.96.08\CONMON BASEMENT\RO\AL SAAD (CMM BSMIT) .SDF SOR TITLE: COMMON BASEMENT PAGE: A © MATERIAL: $40 BWC: 120 Diameter Equivalent Fitting Lengths in Meters (onm) = T L c 5 G a B Nn Ell Tee LngEl1 ChkVly BEyVlv GatVly Almchk DeVlv NPTee 62.71 1.83 3.66 1.22 4.27 2.13 0.30 3.08 3.08 3.66 102.26 3.05 6.10 2.83 6.71 3.66 0.61 6.10 6.10 6.10 202.72 5.49 10.67 3.96 13.72 3.66 1.22 9.45 9.45 10.67 254.51, 6.71 15.24 4.88 16.76 5.79 1.52 11.28 11.28 18.24 Page 6 BSHND) SYSTEM HYDRAULIC AW -08\cOMAON SDF SAAD (com NT \ROVAL a 6/22/2009T8D ON SOMHON. BA: TITLE 308 oop: saang pueueg earnp Atddng. uTW/T 1°990F @ eansserd pextabou Tesgor 8 seq o0"o wpa/t poze oop: isasks “8 somes “YA neq Se0T panssoxd atqeTreay BOTT pags ogy oy ooze oop oot zeq 00° reineseig eornog pexta SISMIWNY ATadns ¥SEYH veonn agmnanaa SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 7 DATE: 6/22/2009TED OW 18.06. 09\COMMON BASEMENT\RO\AL SAAD (CHN BSMNT) .SDF SOB TITLE: COMMON BASEMENT WATER SUPPLY CURVE 32.04 2.0 LEGEND . X = Required water supply * 10.85 bar @ 4065 L/min * 0. OVA ANAANV AMAL ULA LALLA BALLAD ORLY AAA AVL LALA LLY 16002400 3200 4000 4800 «= 5600400 7200 8000 FLOW (LEM) QATAR Project: NAFFCO QATAR FIRE PROTECTION & SATETY DIVISION Teton ates Fo nn aqui Wes: yin Al Saad Development Complex Main Contractor: ‘Mis, MIDMAC Contracting co. Date 21" JUNE 2009 WEP Contractor: ‘Mis. SAMKO International Consultant: Ws AEB Rev 2 HYDRAULIC NODE DIAGRAM Zo-GN= FWOH=110-9i8 [On BRINE

Das könnte Ihnen auch gefallen