Sie sind auf Seite 1von 2

IADC Well Intervention (Coil

Tubing)
Course Duration
05 Days

Location
GTSC

Theoretical/ Practical
100% / 0%

COURSE OBJECTIVES
Providing candidates with an understanding of pressure control methods
relating to the various well servicing operations.
Leads to IADC Certification
DESIGNED FOR
Supervisors & Superintendenmts involved with Coil Tubing Operations

COURSE Contents
Principles & Procedures
Barrier Theory
Barrier Classification
Testing
Valve Operation In Flowing Wells
Problems
Management of Operations
Kick

Summary
Determining the Nature of Intruding Fluid
Gas in the Well Bore Water Based Mud
The General Gas Low
Pressure Basics
Formation Characteristics
Dictionary

Completion

GTSC

IADC Well Intervention for Coil Tubing

IADC Well Intervention (Coil


Tubing)

Introduction
Classification of Completions
Classification-By Reservoir/Wellbore Interface
Classification-By Mode of Production
Classification by Number Of Zones Completed
Horizontal Completions
Subsea Completions

Coil Tubing

Coiled Tubing Description


Description of Fatigue
Running Feet Method
Trip or Empirical Method
Theoretical Method
Tubing Injector
Tubing Guide Arch
Prime Mover
PRIME MOVER
PROBLEM SOLVING
Accessories and Support Equipment
Coiled Tuping Operations
General Pre Jop Information
Nitrogen Care and Handling

GTSC

IADC Well Intervention for Coil Tubing

Das könnte Ihnen auch gefallen