Beruflich Dokumente
Kultur Dokumente
PROYECTO :
CONSTRUCCION MUR
INGRESAR DATOS: para =0
b
30
0.5
2.4
1.9
20.00
0.5 Radianes
Ton/m3
Ton/m3
Ton/m2
4
1
Desnivel H
=
=
c=
m=
qs=
6.00 m
1.2
Df
0.4000
0.72
P=h/10min
m
b''=0.1@0.12h
2.74
T=B-(pie+b'')
B=0.4h @ 0.6h
4.32 m
1. RESULTADOS TEORICOS Y CRITERIO DE ASUMIR
3.00
Pp=
6.84
Ton/m2/m
/=(/)/""
hs/c=0.79 m
Ps/c= 0.500
=((+/))/"2"
=+/
Pat= 5.06
=((2+3/
Ton/m2/m
Eah=
y=
###
2.62 m
=(())/("" )
fsh=
=((+))/
> 1.5
=(())/
(() ) > 2
FSv=
###
2.67
Cumple
FSd=
###
Cumple
8. CONSIDERANDO DENTELLON
=*h'
Peso del
ancho
angul
Profun
Kp=
dentellon trapeziodal
1.5
45
0.8 Radianes
0.5
Vdet=0.50 m3
Wdet=
w
=(^)/2
Eph=
y=
1.20 Ton
###
DE MURO EN VOLADIZO
INGRESAR DATOS:
H=
6
Df=
1.2
b=
0.3
h1=h-0.1h
S/C=
m
m
m
1.50
Ton/m2
h=H+Df
6.400
0.035
7.20
6
5
0.40
0.72
Pie=h/10 min
0.564
m
d=0.1h
0.80
DE ASUMIR :
B=0.4h @ 0.6h
d=0.1h
0.72
h1
Talud()
6.480
###
m
0.56
b
0.30
d=0.1h
0.80
h1
Talud()
6.400
85.03
m
0.56
b
0.30
0.500
*/=
hs/c *hs/c
Xi Mr=W*Xi
1.10
4.75
1.43
6.61
2.95
98.21
2.16
17.92
0.36
0.20
0.73
0.01
2.95
12.12
Mr 139.81
h1
Eah
1
1.2
Eph
h'
/m /m
2
/m2/m
*h=*h
=*h'
5.06
ctivo horizontal total serEl empuje pasivo horizontal total sera
rapecio de presiones
=((2+3/))/3(+2/)
Eph=
y=
4.10 Ton/m
0.40 m
UERZA VERTICAL
en el centro de B/6=
0.72 condicion si e <= B/6 reparti
Si a > B/xentr. e= 0.57 m uniforme a lo largo de la zap
Resultante fuera del tercio repartir carga rectangular
=/2
ACION POR D7. VERIFICACION PRESIONES SUELO
1=2=/
o-hormigon Caso si a=B/3
1=((46))/^2
2=((62))/^2
22.97
3.00
2.57
1=(2)/
Caso si a<
B/3
2=0
q1=
)/(3)
Caso si a1=(2
> B/3
2=0
q1=
Presion
h'=
Pp=
1.7
9.69
Ton/m2/m
=(^)/2
###
=((+))/
> 1.5
FSd=
###
Cumple
Ingresar
Asumir
Resultad
os
0.30
b
=*hs/c
Eah
20.02
y
2.62 m
presiones
=/2
UELO
1=2=/
12.77
Cumple
###
###
Corregir Burrazo
ENTO