Sie sind auf Seite 1von 12

DISEO DE MUR

PROYECTO :

CONSTRUCCION M
INGRESAR DATOS: para =0
b

30
0.5
2.4
1.9
20.00

0.5 Radianes
Ton/m3
Ton/m3
Ton/m2

Desnivel H

=
=
c=
m=
qs=

6.00 m

Df

0.4000
1.2

0.72

P=h/10min

b''=0.1@0.12h
4

2.74

T=B-(pie+b'')

B=0.4h @ 0.6h

4.32 m
1. RESULTADOS TEORICOS Y CRITERIO DE ASUMIR
h BASE (B) PIE (h/10)min
b''=.1h@.12h
TALON
7.20
4.32
0.720
0.8640 2.736
RESULTADOS ASUMIDOS SOLO EN d:
h BASE (B)
7.20
4.32

PIE (B/3)
0.720

b''=0.1hTALON
0.86
2.736

2. COMPONENTES DE GRAVEDAD:
N Elemento
(Ton/m3)
Vol y L W (Ton)
1Triang. Mur
2.4
1.80
4.33
2Frotal Muro
2.4
1.92
4.61
3Relleno Tal
1.9
17.51
33.27
4Losa Cimen
2.4
3.46
8.29
5Relleno Pie
1.9
0.29
0.55
6Relleno Pie
1.9
0.01
0.01
7s/c
2 Ton/m2
2.74 m
4.10
w 55.17
3. RESULTADOS TEORICOS:
Ka=

0.333

Pa=

4.56

Ton/m2/m

Kp=

3.00

Pp=

6.84

Ton/m2/m

/=(/)/""

hs/c=0.79 m

El empuje activo hor

Ps/c= 0.500

Ton/m2/m

al area del trapecio d

=((+/))/"2"

=+/

Pat= 5.06

=((2+3

Ton/m2/m

Eah=
###
y=
2.62 m
4.(
UBICACION
DE LA RESULTANTE DE FUERZA VERT
=(
))/("" )
nota: si Eha=o "a" cae casi en el centro
B/3
Si a=B/3Si a < B/
a= 1.59 m
1.44
0
0
5. VERIFICACION POR VOLTEO
=

Mv= 52.36
=(())/
(() ) > 2

FSv=

2.67
Cumple

6. VERIFICACION P
friccion
= suelo-hormig
fsh=

###

=((+))/
> 1.5

FSd=

###
Cumple

8. CONSIDERANDO DENTELLON

=*h'

Peso del dentellon trapeziodal


ancho
1.5
angul
45
0.8 Radianes

Kp=
=(^)/2

Eph=

Profun

0.5

Vdet= 0.50 m3

y=
Wdet=
w

1.20 Ton
###

DE MURO EN VOLADIZO

CION MURO EN VOLADIZO

h1=h-0.1h

INGRESAR DATOS:
H=
Df=
b=

6
1.2
0.3

m
m
m

S/C=

1.50

Ton/m2

h=H+Df

6.400
0.035
7.20

6
5

0.40
0.72
Pie=h/10 min

0.564
m

d=0.1h

0.80
B=0.4h @ 0.6h

ASUMIR :
d=0.1h
0.72

h1
Talud()
6.480
###

m
0.56

b
0.30

d=0.1h
0.80

h1
Talud()
6.400
85.03

m
0.56

b
0.30
0.500

*/=
hs/c *hs/c

Eph

h1

Eah
1

h'

/m2/m

Xi Mr=W*Xi
1.10
4.75
1.43
6.61
2.95
98.21
2.16
17.92
0.36
0.20
0.73
0.01
2.95
12.12
Mr 139.81
1.2

/m2/m
=*h'

*h=*h

5.06
ctivo horizontal total serEl empuje pasivo horizontal total sera

rapecio de presiones
=((2+3/))/3(+2/)

al area del triangulo de presiones


=(^)/2

Eph=
y=

4.10 Ton/m
0.40 m

ZA VERTICAL
el centro de la B/6=
0.72 condicion si e <= B/6 reparti
Si a > B/xentr. e= 0.57 m uniforme a lo largo de la zap
Resultante fuera del tercio repartir carga rectangular

=/2
ACION POR D7. VERIFICACION PRESIONES SUELO
1=2=/
o-hormigon Caso si a=B/3
1=((46))/^2

2=((62))/^2

22.97

2.57

1=(2)/
Caso si a<
B/3

1=(2)/(3)

Caso si a > B/3

3.00

h'=
Pp=

2=0

q1=

2=0

q1=
Presion

1.7
9.69

Ton/m2/m

=(^)/2

###

VERIFICACION POR DESLIZAMIENTO

0.57 m friccion
= suelo-hormigon
fsh=

###

=((+))/
> 1.5

FSd=

###
Cumple

Ingresar
Asumir
Resultad
os

0.30
b

*hs/c

Eah

20.02
y

2.62 m

al total sera:

esiones

B/6 repartir carga


go de la zapata
tangular
=/2
1=2=/

12.77
Cumple
###
###
Corregir Burrazo

Das könnte Ihnen auch gefallen