| sazensaren
LAZARO CARDENAS
LNG RECEIVING TERMINAL
IMATED AVAILABILITY
CALCULATION
October 10", 2002
Rev 0
SOFREGAZsa 7 | LAZARO CARDENAS LNG
1
|
RECEIVING TERMINAL |
L - J
BM METHODOLOGY ecco snd
32 OVERALL AVAILABILITY coor
33. INDIVIDUAL EQUIPMENT OVERALLUNPLANNED AVAILABILITY 8
ESFIMATED AVAILABILITY BOR 480,000 NMI SEN i sd
441 EQUIPMENT INVOLVED AND SPARE CAPACITY =~ ae
42. AVAILABILITY FOR 480,000 9308 SEND OUT oon. re)
43.1 AVAILABILITY DI IN-TANK PUMP 7 9
422 AVAILABILITY D2: HP PUMPS. 9
422 _AVAICABILITY DI: VAPORISATION SYSTEM 0
AVAILABILITY D4: OTHER 0
OVERALL AVAILABILITY: 0
OVERALL LIABILITY 0
43° AVAILABILITY FOR 320000090311 SEND OUT ooo enced
33.4. AVAILABILITY Di: IN-TANK PUMPS. 0
432 AVAILABILITY D2: HP PUMPS, i
433 AVAILABILITY D3: VAPORISATION SYSTEM i
434 AVAILABILITY D4: OTHER. u
435° OVERALL AVAILABILITY 1
436 OVERALL LIABILITY. ul
4A AVAILABILITY FOR 160,000 1301 SEND OUT soccecenncnncccnoned
$3.1. AVAILABILITY DL:IN-TANK PUMPS, iy
442, AVAILABILITY D2: HIP PUMPS, 2
vagedaer rereLAZARO CARDENAS LN
RECEIVING TERMINAL
443 AVALABILITY D3: VAPORISATIONSYSTEM 1
444° AVALABILITY D4: OTHER, : a
S43 OVERALLAVAILABILITY
4460 OVERALLLIABILITY.
43 EXPECTED VALUE FOR GUARANTEED FIGURE AT 40,000 NMI
Ds 09703, : ad .
WAIL AB
BOR 640,000 NMI SEND Ov
51 EQUIPMENT INVOLVED AND SPARE CAPACITY.
S20 AVAILABILITY AT 640,000 NM 1.
S21 AVAILABILITY DL: IN-TANK PUMPS...
522. AVAILABILITY D2: HP PUMPS.
52}. AVAILABILITY D3: VAPORISATIONS
524 AVAILABILITY Di: OTHER. iu
525. OVERALL AVAILABILITY
526 AVAILABILITY AT 640,00 NMI cs
53. AVAILABILITY AT 80,000 N11
S34 AVAILABILITY DI: IN-TANK PUMPS
532 AVAILABILITY D2: HP PUMPS,
533 AVAILABILITY D3: VAPORISATIONSYSIEM ..
S34 AVAILABILITY Ds. OTHER
535 OVERALL AVAILABILITY
S36 AVAILABILITY AT380.000NNH.
Sa. AVAILABILITY AT 320000 XMM on :
S41 AVAILABILITY DI:IN-TANK PUMPS.
582 AVAILABILITY D2: HP PUMPS
343 AVAILABILITY D3: VAPORISATION SYSTEM
Sa AVAILABILITY D1: OTHER.
545 OVERALL AVAILABILITY.
S46 AVAILABILITY AT 20,000 NM 7
35. AVAILAAILITY AT 160,000 NMVH oc
531 AVAILABILITY DI: IN-TANK PUMPS
532. AVAILABILITY D2: HP PUMPS,
553 AVAILABILITY D3. VAPORISATIONSYSIEME '
S54 AVAILABILITY D4: OTHER on
535 OVERALL AVAILABILITY 7
556 AVAILABILITY AT 160,000 NM
55 EXPECTED VALUE FOR GUARANTEED FIGURE AT 640000 NMI
D = 094395
ESTIMATED AVAILABILITY
| ‘CALCULATIONZARO CARDENAS LNG.
RECEIVING TERMINAL
ANNEX = EXCEL CALCU
Date October, 2008
Reo
ESTIMATED AVAILABILITY, = |The purpose of this note isto estimate the availabilty of the Lazaro Cardenas
LNG receiving terminal based on two send out capacties
1 ~ 480,000 nngin
2 640,000 nna
This availabilty is not the overall availabilty that normally include planned
interruption and unplanned interruptions but only unplanned interruption
Uncertainty ofthis kid of calculation isto obtain reliable figures for unplanned
availablity of individual equipment
Dae Detter, 2008 LV 4ae | tazanocanmenasine | tte
The availabilty of @ system is equal to the multiplication of availabilty of
elements in series composing the chain necessary for iis operation,
‘Availabilty of an element is based on the individual availablity, taking into
‘account the available capacity and spare, for example (3 x 50% capacity)
Slo" a"-ay]
Element availed
Where
NIST NUMBEs OF ComoNeNTs STALLED
NIS THE MINIMUM NUMBER OF COMPONENTS IN OPERATION To COMPLY TE 100% PLOW RATT
[AIS THE AVAILABILITY OF ONE COMPONENT
(C.*15 THE NUMBER OF COMBINATIONS OF R COMPONENTS NOT AVAILABLE CHOSEN FOM N
1 M
G
FN
32. OVERALL AVAILABILITY
‘The send out chain is composed of several sections in series. The main ones
involved inthe send out of vaporised LNG ate the following
> A1~Intank LNG pumping Availabilty 01
> A2~ Secordary LNG pumping ‘Availabilty D2
> A3~LNG saporisation ‘Availabilty 03
> 4 Otherinterfacing sections & utliies [Nota]: Availabilty D&
OVERALL SEND OUT AVAILABILITY D = D1 x02 D3 x D4
ESTIMATED AVAILABILITY
‘CALCULATION| LAZARO CARDENAS LNG
Nota : Ail other units and equipment necessary forthe send out (control system,
piping interconnecting, electrical power switchgears and distribution
Instrument air, ..)
33. INDIVIDUAL EQUIPMENT OVERALL UNPLANNED AVAILABILITY,
f [Rounded [Rounded [Number | Total
wTeF | MTTR | in | Operating
Sample | Hours
In Tank Pump 6 100 90 54] 676810
ISend Gut Pump | 4300] 120] 120] 1 246 650
Iscv 2000) 70) 18) 198 546
lov 12) 100] 40] 703.379) a4=99.2%"
000
| Seawatereunp | | |__| 4990.6" _}
Other units for
send out 60990 %
| 480 000 nmain (d6b=987 %""*
| 640 000 nn3m
‘Source: "Improving LNG Importation Reviabilt
Realistic assumption
"Assumption : This last parameter that include all other involved system ( control
system, ubities, elocrical, 18 very Important and the figures above seems fo be
conservative,
‘Stephen Colin, etal
‘CALCULATION
ratoESTIMATED AVAILABILITY FOR 480,00
4.1 EQUIPMENT INVOLVED AND SPARE CAPACITY
The set up of equipment is summarised below.
Capacity isin percentage of nominal capacity for 480,000 rma send out
[Tipe of equipment [Number of | Total | Number | Capacity
Componen number of | of spare | por
‘| Componen [equipmen| component
necessary | t t
LNG pumps Flee jee F;
InTankpumes | 3 6 | 3 23%
wepumps | 3 | 4 3%_|
Vaporisaton system eee
| ORV Bie lees ° 23%
‘Sea water | 4 1
3 23%
pumps eoetele eciasrin i
The cial tems are ORV
42 AVAILABILITY FOR 480,000 mih SEND OUT +
42.1 AVAILABILITY D1: IN-TANK PUMPS
Based on the avaiablity of 3 in-tank LNG pumps among 6
Diz at +6 xdt(t-at)+ 15x a1%(1-61)4)+20x d1%(1-41)*
422. AVAILABILITY D2: HP PUMPS
Based cn the availabilly of 3 HP.LNG pumps among 4
be
2 + 4 x a2" x (1-42)
estinaTE
De Octber 2008arte rene
42.3. AVAILABILITY D3: VAPORISATION S)
D3axD3b where
DBAs THE AVAILABILITY OF THE Sea wareR SySTENE
Dig iit AVAILABILITY OF THE VaponIsER SYSTEM
13a is based on the availabilty of 3 sea water pumps among 4
D3a = a5* + 4x d5%x(1-d5)
Dab is based on the availabilty of 3 ORV vaporisers among 3
Dab = as?
424 AVAILABILITY D4: OTHER
a= 063
425 OVERALL AVAILABILITY
D=D1 02x 03a x03 x D4
42.6 OVERALL LIABILITY
Dago = 0.96148
43 AVAILABILITY FOR320.000 mam SEND OUT of
431 AVAILABLATY DI N-TANK PUMPS
Based en the availabilty of 2in-tank LNG pumps among 6
DI= dt + 6x g1°(t-d1) + 15 x d1°(1-d41)?) +20 x d1°1-41)9 +15 x
at'qrat)*
vegan | UY
| Rev 0
| ge ae 22 SOrrEGAt
l432. AVAILABILITY D2: HP PUMPS
Based on the availabilty of 2 HP LNG pumps among 4
02 = da! + 4 x2" (1-42) + 6 x 2x (1-€2)?
433. AVAILABILITY D3: VAPORISATION SYSTEM
D3=Dtax 03d where
[Da 1S THE AVAILARILITY oF THE SEA Wate SySTEN
D385 THE AVAILABILITY OF THE VAPORISER SYSTEM
3a is based on the availabilty of 2 sea water pumps among 4
Daa = 5! + ax d5%«(1-05) + 6 x aS*x(1-45)?
Dab is based on the avallabily of 2 ORV vaporisers among 3
Dab = c4 + 3 x d8x( 1-48)
434 AVAILABILITY D4: OTHER
4 = d6a
435. OVERALL AVAILABILITY
D=D1x 02x D3ax Dap x D4
436. OVERALL LIABILITY
44
.98972
Dazo
AVAILABILITY FOR 160,000 mi/h SEND OUT +| tazano canoerasine
RECEIVING TERMINAL,
aol
44.1 AVAILABILITY DI : IN-TANK PUMPS
Based on the avallabilily of 1 in-tank LNG pumps among 6
br
g°8 + 8x G1%(1-d1) + 15 x d1"(1-d1)?) 420 x 191-01) +15 x
8°%(1-43) "46 x d1(1-61)?
442 AVAILABILITY D2: HP PUMPS
Based on the avalibiliy of 1 HP LNG pumps among 4
0:
02° + 4 x dx (1-02) + 6x 62" x (1-62) 4x ax (1-62)?
4.43 AVAILABILITY DS: VAPORISATION SYSTEM
D3 = 0% x D3» where
5a 8 TE AVATLARILTY OF THE SEA WATER SYSTEM
(D}e 6 TE AVAILABILITY OFTHE VAPORISER SYSTEM
3a is based on the avaitabilty of 1 sea water pumps among 4
03a = 05 + 4x d5%K( 1-45) + 6 x dStx( 1-05) 4 x dx( 1-05)?
1D3b is based on the availabilly of 1 ORV vaporisers among 3
bab
1 6 Bx aMx( tea} 3 x dan 1-04)?
444 AVAILABILITY D4: OTHER
04 = d6a
445 OVERALL AVAILABILITY
D=01 «2x D3ax 030 x D4
=
ESTIMATED AVAILABILITY
CALCULATION
bate Octaner 2008
ee[| raereseercace
446. OVERALL LIABILITY
Dye’ = 0.99000
48
EXPECTED VALUE FOR GUARANT
D= (480 Dew (1 Dag) x (Dsspx 320) + (1- Dy) x (Duos 160 ))/ 480
D = 0.98703 9% A
CALCULATION WZ
Page 1322LAZARO CARDENAS LNG.
RECEIVING TERMINAL
ESTIMATED AVAILABILITY FOR 640,000 nm3/h SEND OUT
51 QUIPNENT INVOLVED AND SPARE CAPACITY
‘The set up of equipment is summarised below.
Capacity isin gercentage of nominal capacity for 640,000 nma/ send out
‘Type of equipment [Number of | Total Number | Capacity
Tareas menpored| sticks | owe
rt Canin |cautenor ober
imaccemry | °
iotinapul |e || | ae
wept | gg tog Le
cev > | o | om
sev + | 4 0 | Som
Seawater pumps al 4 0 33%
‘The critical items are HP pumps, Vaporizers and Sea water pumps.
82. AVAILABILITY AT 640,000 NM3/H.
5.21 AVAILABILITY DI :IN-TANK PUMPS
Based cn the availabilly of 4in-tank LNG pumps among 6
Di= ai? +Gxdnraty+ 18 xar(1-01)*
AVAILABILITY D2: HP_PUMPS
Based on the availabilty of 4 HP LNG pumps among 4
b2=az
] smeateuenion. | 7523. AVAILABILITY D3 : VAPORISATION SYSTEM
D3= Dia x D3b x D3c where
3a s Tie AVaLAnILETY oF THe Sea WATER SYSTEM
[Da is Ti AVAILABILITY OFTHE ORV VAPORISER SYSTEM
DSc Is AVAIEABILITY OF THE SCV VaPORISEx SYSTENE
13a is tased on the availabilty of 4 sea water pumps among 4
3a = a5"
1030 is tased on the avatiabilly of 3 ORV vaporisers among 3.and one
SCV among 1
D3 = ot?
3c is based on the availabilty of 1 SCV among 4
se.
524 AVAILABILITY D4: OTHER
8
Dé = a6
525. OVERALL AVAILABILITY
D=01«D2xD3axD3b x D3ex D4
5.26 AVAILABILITY AT 640,000 NMS/I
Dewo = 0.79718
53. AVAILABILITY AT 480,000 NMA
53.1 AVAILABILITY DI : IN-TANK PUMPS
Based cn the availabilty of 3 in-tank LNG pumps among 6
CALCULA
Date Oster, 2008LAZARO CARDENAS ING
Die att + 6x at%(t-dt)+ 15x A1%(1-81)%)+20 x 61%(1-a1)?
AVAILABILITY D2: HP PUMPS:
Based cn the availabilty of 3 HP LNG pumps among 4
D2 = a2 + 4 x d2x (1-42)
AVAILABILITY D3 : VAPORISATION SYSTEM
D3 = Dia x D3b x D3¢ where
3a ST AVAMLAGILTY oF THE Sea WATER SYSTISE
Da IST AVAILABILITY OF THE WAPORSSERS¥STEM
1D3a is based on the availabilty of 3 sea water pumps among 4
Daa = o5* + 4x d5%x(1-d5)
1D3b is tased on the availabilty of 3 vaporisers among 4 (3 ORV and
‘one SCY )
Dab = o' +4 x?x (1-4)
with a (63 x 03 x 08 x d4)°
AVAILABILITY D4: OTHER
D4 =e
OVERALL AVAILABILITY
D=1«02xD3ax03bxD4
AVAILABILITY AT 480,000 NM3/HL
Digo = 0.98068
SOFREGAZ. a ey :
S40 AVAILABILITY AT-320,000 NMBVH
SA. AVAILABILITY DI: IN-TANK PUMPS
Based on the availabilty of 2 intank LNG pumps among 6
DI= ot + 6x dt%(t-d) 15 xat4(1-41)?) 120 x d1"(1-41)° +18 x
or%(1-a1)
542 AVAILABILITY D2: HP PUMPS
Based on the avaiiabilly of 2 HP LNG pumps among 4
D2= dz! + 4 xd2?x (1-42) + 6x d2? x (1-42)?
S43 AVAILABILITY Dd: VAPORISATION SYSTEM
03 = Dia x Dab x D3e where
Danis me AVAILABILITY OF HE Varo STEN
1a is tased on the avaiabillyof2 sea water pumps among 4
D3a = d5* + 4x d5°x(1-d5) + 6 x d5*x(1-d5)?
030 tase on he aalbilty of 2 vaporizer ORV or SCV vaponsers
among:
4 xox (1-0) #6 xx (1-0)?
{3 x43 x43 x4)"
S44 AVAILABILITY D4: OTHER
Dé = dé
OVERALL AVAILABILITY
D=01 xD2xD3ax 030 x D4
ESTIMATED AVAILABILITY
SOFREGAZIAZARO CARDENAS LNG.
54.6. AVAILABILITY AT 320,000 NMI
Dray = 0.98690
55. AVAILAB
-Y AT 160,000 NMI.
5.5.1 AVAILABILITY DI : IN-TANK PUMPS
Based onthe availably of 1 in-tank LNG pumps among 6
D
18 + 6x 4151-41) + 15 x 614(1-41)*) #20 x d2°(1-61) 2415 x
AP(1-d1) 6 x d1(1-d1)?
552. AVAIL
ILITY D2: HP PUMPS
Based onthe availabilty of 1 HP LNG pumps among 4
b:
2! +4 x d2 x (1-42) # 6 x 62" x (1-62) 24 4 x 42x (1-42)?
55.3 AVAILABILITY D3 : VAPORISATION SYSTEM
D3 = Dea x Dab xD3e where
[DAIS THY AVAILAMILETY OF DHE Sea WATER SYSTIME
D308 TH AVAILABILITY OF THE WAPORISER SYSTEM
1D3ais tased on the avaliabilty of | sea water pumps among 4
3a = dt + 4x d5(1-05) + 6 x d5%x( 1-45) 4 x d5x(1-45)°
1D3b is tased on the availablity of 1 vaporizer (ORV or SCV) among 4
Dab =o + 4 x dx (1-d) + 6x0" x (1-4) 4x dx (1-8)?
with a (63 x a3 x 3 x 64)
SOFREGAZ
melRECEIVING TERMINAT
S54 AVAILABILITY D4: OTHER
4 = a6
555. OVERALL AVAILABILITY
Dix 02x D3axD3b x 04
556 AVAILABILITY AT 160,000 NMI
Daze = 0.98690
SS EXPECTED VALUE FOR GUARANTEED FIGURE AT 640,000 NMVHL
D = (640 Bun (1- Das) x (Dayo 480) + (1-Day) x (Day 320) + (1+ Day)
Dywx 160 9) 640
D = 0.94895
[meee | WZ: sai [ seman | ia 7
7 CONCLUSION
Based on the hereabove calculations the unplanned expected availablity is
For the base load send out of 480,000 nmaih the expected
availabilty is 98.7% to be compared with the 97.5% Fequired by
REPSOL forthe frst year and 89% required by REPSOL for the
second year (average required is 98.25%) - Thooratical margin is
e less than 0.5%
For the peak send out of 640,000 nm3ih the expected availability is
94.9% to be compared with the 94% required by REPSOL for the first
year and 95% required by REPSOL for the second year (average
Foquiredis. 94.5%) ~ Theoretical margin is less than 0.5%,
Taking into account the uncertainty of the basic input data there is
‘some risk to accept a big amount of liquidated damages on the
figures required by REPSOL,SOPREGAL