LIST OF COMPLETED PROJECTS UNDER GOV. ROBERTO Y.

UYs ADMINISTRATION
January 1 to August 31, 2015

NAME OF PROJECT

Length

Location

Appropriation

Source of Funds

Mode of
implementat
ion

Date
Started

Date
Complete
d

%
Accomp
.

Remarks

15-Feb15

100.00%

Completed

22-Jan-15 100.00%

Completed

DISTRICT II - A
KATIPUNAN

1 Construction of Water Supply System at Brgy. Dabiak


2

Road Concreting of JRMSU (Main Road)- katipunan


Campus

0.24

km.

3 Proposed Perimeter Fence @ Sitog Elem School, Sitog


4 Construction of Water Supply System @ Brgy Singatong
5 Single Phase Lateral Line Construction at Brgy. Singatong
6

0.431

km.

Construction of Two Rooms Community Toilet at Purok 9,


Brgy. San Antonio, Katipunan, Z.N.

7 Rehabilitation of Seroan - Mahayahay Brgy. Road


Proposed Mini Multi-purpose Hall @ Patik Elementary
School, Patik, Katipunan, Zamboanga del Norte
Electrification Project (Service Drop wire) at Sitio
9
Nangcaan, Matam, Katipunan, ZN
Const'n of 3m x 3m x 5m Double Barrel Reinf. Conc. Box
10 Culvert & 25.40 l.m. Conc. Pavement, Approach Road at
San Antonio

3.0

km.

Concreting of Provincial Road of 1,000 meters @ Brgy


11
Sinuyak, Mun. of Katipunan, ZN

5.0

1.0

ln.m

km

Dabiak

625,000.00

9999(1)874

Takay
Labor

12-Jan-15

JRMSU

800,000.00

20%Df/8918(1)

Admin.

7-Jul-14

Sitog

710,000.00

9999(1)871

Takay
Labor &
Lumber

15-Dec14

24-Apr15

100.00%

Completed

Singatong

1,259,612.13

416-(DOFMDFO)-01(A)PBGS-CG)

Admin.

9-Feb-15

13-Apr15

100.00%

Completed

Singatong

193,034.68

8918(3)874

Admin.

100.00%

Completed

San Antonio

20,000.00

9999(1)874

Admin.

100.00%

Completed

Katipunan

300,000.00

56-00-01-08
8918(Cont.)

Admin.

100.00%

Completed

Patik

610,000.00

8918(1)871

Takay
Labor

16-Feb15
16-Apr15
26-Feb13
15-Sep14

8-Jun-15

100.00%

Completed

Matam

38,520.00

Admin.

28-Jul-14

12-May15

100.00%

Completed

San Antonio

1,700,000.00

8999(6)874

Admin.

24-Nov14

15-Jul-15

100.00%

Completed

3,870,000.00

FY 2015;GF(01)
9999(1) 250 AIP
Ref#8000-1-3

Takay
Labor,
Lumber &
Aggregates

14-May15

48.00%

On-Going

Sinuyak

18-Feb15
31-May15
30-Jun15

12 Construction of Barangay Hall @ Brgy Daanglungsod


13

Construction of Water Supply System @ Bulawan,


Katipunan

14 Concreting of Brgy Road of 1,000m @ Brgy Dos

1.0

km

15 Rehab of Sinuyak National High School Ground, Sinuyak


Concreting of Brgy Road of 1,000 mtrs @ Brgy
16
Daanglungsod
17

Construction of Water Supply System @ Brgy Sitog, New


Dapitan

18

Construction of 1-Unit 2-Classroom School Building @


Carupay, Katipunan, ZN

19

Single Phase Lateral Line Const of Purok Centro-Purok


Tanggulang going to Morias Falls, Brgy Miatan

20

Furnishing & Installation of 1.5 HP Submersible Water


Pump for Brgy. Dos Water System Project

21 Rehabilitation of Barangay Road at Brgy. Carupay


22

Purchase of Materials for Public School Purposes at the ff.


Brgy. Seres, Brgy. Carupay & Brgy. Sitog

1.0

3.566

km

km

Takay
Labor &
Lumber
Takay
Labor &
Aggregates

10-Mar15

60.00%

On-going

30-Jun-15

60.00%

On-going

Takay
Lumber &
Aggregates

13-Apr15

28.00%

On-going

8918(1)871

Admin.

21-Jul-15

60.00%

On-going

4,475,000.00

8918(8)cont.
Reprog: SP
Res#109, s. 2015

Takay
Labor,
Lumber &
Aggregates

28-Jul-15

10.00%

On-going

Sitog, New
Dapitan

1,990,000.00

416-(DOFMDFO)-01(A)PBGS-CG)

Admin.

20-Jul-15

60.00%

On-Going

Carupay

850,000.00

3999-969(6)

Takay Labor,
Lumber &
Aggregates

10-Aug15

10.00%

On-Going

Miatan

2,105,848.00

FY 2015 20%
AIP Ref# 80001-97

Admin.

1-Sep-15

5.00%

On-going

Dos

110,000.00

8918(4)874

Admin.

Daanglungsod

1,380,000.00

9999(1)874

Bulawan

1,900,000.00

8919(8)cont AIP
Res# 109, s. 2015

Brgy. Dos

5,960,000.00

20% DF-2015 AIP


ref# 8000-1-5

Sinuyak

180,000.00

Daanglungsod

NYS/Mat'ls on
process
NYS - Waiting for
Equipment
NYS/Mat'ls on
process

4.0

km.

Carupay

110,000.00

8918(2D) Cont.
-874

Admin.

4.0

km.

Katipunan

16,000.00

8918(1)871

Admin.

9999(1)874

Takay
Labor,
Lumber &
Aggregates

NYS-Mat'ls on
Process

Admin.

NYS/Mat'ls on
process

Takay
Labor,
Lumber

NYS/Mat'ls on
process

Construction of Outdoor Stage @ Fimagas Elementary


23
School, Brgy. Fimagas, Katipunan, Z.N.

Fimagas

200,000.00

24 Impvt of Elevated Reservoir @ Brgy Dos, Katipunan, ZN

Dos

48,000.00

Malugas

500,000.00

CY-2015
25

Construction of Concrete Perimeter Fence @ Malugas


Elem School, Malugas, Katipunan, ZN

121.63

FY 2015, GF(01)
9999(1) 874 AIP
Ref#8000-1-3

Single Phase Lateral Line Const @ Sitio Kunawon-Sitio


26
Labob, Brgy Sitog, Katipunan, ZN

5.086

km

Sitog

2,319,449.00

FY 2015 20%DF
AIP Ref#80001-97
GF(01)-FY 2015
9999(1) 874 AIP
Ref#8000-1-3

27

Repair of Asphalt Pavement along Brgy San Antonio,


Katipunan, ZN

1.2

km

San Antonio

270,000.00

28

Proposed Construction of Covered Court Gym @ Brgy


Basagan

12 x
20

Basagan

950,000.00

29

Prop Const of Reinforced Concrete Covered Ditch


(46 ln.m.) @ Brgy Tambo, Katipunan, ZN

46.0

Tambo

340,000.00

30

Const of 1-Unit 2-Classroom School Building @ Brgy


Miatan

7 x 18

Miatan

875,000.00

31

Concreting of Provincial Road of 500 mtrs Critical Section


along Brgy Sto. Nio

0.5

km

Sto. Nio

2,240,000.00

9999(1) SB#1Appro Ord.#1501, s.2015

32

Concreting of Brgy Road of 200 mtrs Critical Section along


Brgy Biniray, Katipunan, ZN

0.2

km

Biniray

935,000.00

9999(1) SB#1Appro Ord.#1501, s.2015

33

Concreting of Brgy Road of 1,000 mtrs @ Brgy Luyoran,


Katipunan

1.0

km

Luyoran

2,625,000.00

9999(1)874 AIP
Ref#8000-13/FY2105

34

Concreting of Brgy Road of 1,000mtrs from existing


Concrete Brgy Road to Purok 2, New Tambo, Katipunan, ZN

1.0

km

New Tambo

2,885,000.00

35

Completion of Concrete Stairs with Railings @ Brgy


Carupay

Carupay

15,475.00

36

Const of 1-Unit 3mx2.10mx5m Single Barrel Reinforced


Conc Box Culvert @ Brgy Patik

Patik

690,000.00

37 Const of 1-Unit 2-Classroom School Building @ Brgy Dabiak

Dabiak

875,000.00

Construction of Covered Court @ Sinuyak Elementary


38
School

Sinuyak

2,100,000.00

9999(1) SB#1Appro Ord.#1501, s.2015


9999(1) SB#1Appro Ord.#1501, s.2015
9999(1) SB#1Appro Ord.#1501, s.2015

999(1)874 AIP Ref#


8000-1-3/FY 2015
Small Infra
GF(01), FY 2015
8999(4) 874 AIP
Ref# 8000-1-4
FY 2015; GF(01)
8918(2B) 874 AIP
Ref#8000-13/Small Infra
9999(1)874 AIP
Ref#8000-13/FY2105 GF(01)
GF(01)/PDRRMCFY2015 AIP
Ref#9000-6-1

Admin.

NYS/Waiting for
Materials

Takay Labor
&
Aggregates
Takay
Lumber &
Aggregates

NYS/Mat'ls on
process

Takay
Lumber &
Aggregates

NYS/Mat'ls on
process

Takay
Labor,
Lumber
Takay
Labor,
Lumber &
Aggregates
Takay
Labor,
Lumber &
Aggregates

NYS/Mat'ls on
process

Admin

PR on process

Admin

PR on process

Admin

NYS/Mat'ls on
process

Admin

Newly Approved
POW

Admin

Newly Approved
POW

Takay
Labor,
Lumber &
Aggregates

Newly Approved
POW

POW For
Revision

PR on process

PR on process