Schedule Plan AB4 Steel Structure (Civil Works)

No

Description of Works

Preparation Works after Bidding process ( Detail


Drawing, Re-Calc & Shop Drawing etc.)

Foundation AB4
a
b
c
d
e
a
b
c
d

Foundation
Concrete Floor Dismantling & Soil Excavation
Lean Concrete
Formwork installation
Rebar Installation
Concrete Fc'25Mpa
Pedestal Column
Formwork installation
Rebar Installation
Anchor Bolt M24 Installation
Concrete Fc'25Mpa

QTY Unit
1 Ls

Month 1
2 3 4

Month 2
2 3 4

Month 3
2 3 4

Month 4
2 3

Month 5
2 3

Remarks

14 days

9 days
sq.m
cu.m
sq.m
Kg
cu.m
sq.m
Kg
Pcs
cu.m

2 days
7 days
7 days
1 day
5 days
5 days
2 days
1 day

Steel Structure AB4 ( including Staircase )

a Fabrication Steel Structure in Jakarta


b Sand Blasting & Painting Steel Structure
c Delivery Steel Structure from Jakarta to Tayan Site

Kg
Kg
Kg

Installation & Erection Steel Structure

4
a
b
c
d
e

Column WF300x300 Erection


Main Beam Erection
Branch Beam and Joist Erection
Chequered Plate Floor Installation
Staircase Erection

5 Weeks
1 weeks
2 weeks
Install & Erection 5-6 weeks

Kg
Kg
Kg
Kg
Kg

No
5

Description of Works
Finishing & Commisioning

QTY Unit
1 Ls

Electrical Work
1

Panel Installation
a Install SCP Panel
- Foundation Work
- Install Panel
b Install LCP Panel (Panel Hoist, MK, VS)
Cabling
a Install Power Cable from LVD - SCP Panel
b Install Power Cable from SCP Panel - LCP Panel
c Install Power Cable from LCP Panel - Motor

1 Unit

4 Unit

150 m

Hoist Installation
a Install rail cable hoist
b Install panel hoist
c Install cable hoist

1 Lot
1 Lot
1 Lot

Conduit Installation

1 Lot

Lighting Installation

1 Lot

Month 1
1 2 3 4

Month 2
1 2 3 4

Month 3
1 2 3 4

Month 4
2 3

Month 5
2 3

Remarks