ALFAHAD- 1

FIRE FIGHTING REMAINING WORKS


BASEMENT 3
1. 10 PIPE CONNECTION TO RISER
2. BREECHING INLET WRP LINE 6 PIPE
3. PAINTING
4. FIRE HOSE CABINET NOT FIXED & CONNECTION WITH WRP LINE NOT DONE
5. 6 GATE VALVE NOT FIXED (6PCS) FOR FHCR
6. PRESSURE TEST
7. SPRINKLER FIXING
8. PUMP ROOM CONNECTION INCLUDING PANEL INSTALLTION
BASEMENT 2
1. BREECHING INLET LINE WRP & SPRK LINE 6 PIPE TO GROUND FLOOR
2. FIRE HOSE CABINET NOT FIXED & CONNECTION WITH WRP LINE NOT DONE
3. PRESSURE TEST
4. SPRINKLER FIXING
BASEMENT -1
1. FIRE HOSE CABINET NOT FIXED & CONNECTION WITH WRP LINE NOT DONE
2. LEAKAGE TEST
3. SPRINKLER FIXING
GROUND FLOOR
1. DROPING FIRE FIGHTING PIPE
2. PRESSURE TEST
3. SPRINKLER FIXING
4. FOAM SPRINKLER SYSTEM
5. FM200
1ST FLOOR
1. DROPING FIRE FIGHTING PIPE
2. SPRINKLER FIXING
2ND FLOOR
1. DROPPING FIRE FIGHTING PIPE
1. PRESSURE TEST BALANCE
2. SPRINKLER FIXING
3RD FLOOR
1. DROPPING FIRE FIGHTING PIPE
2. PRESSURE TEST FIXING
3. SPRINKLER FIXING
4TH FLOOR
1. SPRINKLER FIXING
5TH FLOOR
1. SPRINKLER FIXING
6TH FLOOR
1. SPRINKLER FIXING
7TH FLOOR
1. SPRINKLER FIXING
8TH FLOOR
1. SPRINKLER FIXING
9TH FLOOR
1. SPRINKLER FIXING
2. 8 GATE VALVE FIXING
10TH FLOOR
1. SPRINKLER FIXING
11TH FLOOR
1. SPRINKLER FIXING

12TH FLOOR
1. SPRINKLER FIXING
13TH FLOOR
1. SPRINKLER FIXING
14TH FLOOR
1. FINAL PRESSURE TEST
2. SPRINKLER FIXING
15TH FLOOR
1. FINAL PRESSURE TEST
2. SPRINKLER FIXING
16TH FLOOR
1. FINAL PRESSURE TEST
2. SPRINKLER FIXING
17TH FLOOR
1. FINAL PRESSURE TEST
2. SPRINKLER FIXING
18TH FLOOR
1. FINAL PRESSURE TEST
2. SPRINKLER FIXING
19TH FLOOR
1. DROPPING IN KITCHEN & CORRIDOR
2. FINAL PRESSURE TEST
3. ZCV CONNECTION
4. SPRINKLER FIXING

20TH FLOOR
1. DROPPING IN KITCHEN & CORRIDOR
2. FINAL PRESSURE TEST
3. ZCV CONNECTION
3. SPRINKLER FIXING
21ST FLOOR
1. DROPPING IN KITCHEN & CORRIDOR
2. FINAL PRESSURE TEST
3. ZCV CONNECTION
3. SPRINKLER FIXING
22TH FLOOR
1. DROPPING IN KITCHEN & CORRIDOR
2. FINAL PRESSURE TEST
3. ZCV CONNECTION
4. SPRINKLER FIXING
23RD FLOOR
1. DROPPING
2. PRESSURE TEST
3. SPRINKLER FIXING
24TH FLOOR
1. DROPPING
2. PRESSURE TEST
3. SPRINKLER FIXING
ROOF FLOOR
1. FHCS CABINET FIXING AND CONNECTION TO RISER PIPE

SHAFT
1. FHCS CABINET CONNECTION TO RISER PIPE

2.

CONNECTION TO FHCR FROM 6 WRP LINE FROM 2ND FLOOR TO 24TH

FLOOR
3. WATER SPRAY SYSTEM
4. PRE ACTION SYSTEM
5. FIRE HOSE REEL CABINET INSTALLATION

ALFAHAD- 1
PLUMBING REMAINING WORKS
BASEMENT 3
1.
2.
3.
4.
5.
6.

WATER TRANSFER PUMP PIPE LINE IS PENDING


TRANSFER PUMP INSTALLATION
CATCH BASIN COVER INSTALLATION
PAINTING
PRESSURE TEST OF TRANSFER LINE
PRESSURE PIPE INSTALLATION

BASEMENT 2
1. CATCH BASIN COVER INSTALLATION
2. TRANSFER LINE FIXING
3. PRESSURE TEST OF TRANSFER LINE
BASEMENT -1
1. CATCH BASIN COVER INSTALLATION
2. TRANSFER LINE FIXING
3. PRESSURE TEST OF TRANSFER LINE
4. DUBAI MUNICIPALITY DRAINAGE CONNECTION
GROUND FLOOR
1. SWIMMING POOL PIPING WORK AND FIXING OF EQUIPMENTS
2. PRESSURE TEST
3. DRAINAGE SHAFT CONNECTION
4. BALCONY DRAIN PIPE CONNECTION HIGHLEVEL
5. GROUND FLOOR HIGHLEVEL DRAINAGE PIPE LEAK TESTING
6. FIXING OF MANHOLE GRATING.
7. INSTALLATION OF TRANSFER LINE

1ST FLOOR
1. SWIMMING POOL PIPING WORK
2. LEAK TEST OF HIGHLEVEL DRAINAGE LINE
3. DRAINAGE PIPE SHAFT CONNECTION
4. SANITARY FIXING IN BATHROOM(SHOWER MIXITURE AND SHOWER TRAY)
5. INSTALLATION OF TRANSFER LINE
2ND FLOOR
1. SANITARY FIXING INCLUDE SHOWER TRAY,SHOWER HEAD,WC,BIDET,KITCHEN
ZINC .
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
3RD FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINC .
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
4TH FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINC .
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
5TH FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINCAND SHOWER MIXTURE.
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE

6TH FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINC ,SHOWER MIXTURE
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
7TH FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINC ,SHOWER MIXTURE.
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
8TH FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINC , SHOWER MIXTURE.
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
9TH FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINC , SHOWER MIXTURE.
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
10TH FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINC ,SHOWER MIXTURE
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
11TH FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINC ,COUNTER WASHBASIN AND
SHOWER MIXTURE..
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
12TH FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINC ,COUNTER WASHBASIN AND
SHOWER MIXTURE.
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
13TH FLOOR

1. SANITARY FIXING INCLUDE KITCHEN ZINC , COUNTER WASHBASIN AND

WATERMIXTURE .
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
14TH FLOOR
1. SANITARY FIXING INCLUDE KITCHEN ZINC ANDCOUNTER WASHBASIN .
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE

15TH FLOOR
1. FINAL SANITARY FIXING INCLUDE KITCHEN ZINC ,WC& SHOWER HEAD .
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
16TH FLOOR
1. FINAL SANITARY FIXING INCLUDE KITCHEN ZINC ,WC,SHOWER HEAD
&COUNTER WASHBASIN .
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE

17TH FLOOR
1. FINAL SANITARY FIXING INCLUDE KITCHEN ZINC ,,SHOWER MIXTURE
&COUNTER WASHBASIN .
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE

18TH FLOOR
1. FINAL SANITARY FIXING INCLUDE KITCHEN ZINC ,WC,BIDET,SHOWER MIXTURE
.
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
19TH FLOOR
1. FINAL SANITARY FIXING INCLUDE KITCHEN ZINC ,WC,SHOWER MIXTURE .
2. WATER METER CABINET
3. INSTALLATION OF TRANSFER LINE
20TH FLOOR
1. BATH TUB FIXING
2. FINAL SANITARY FIXING INCLUDE KITCHEN ZINC ,,SHOWER MIXTURE
&COUNTER WASHBASIN .
3. WATER METER CABINET
4. INSTALLATION OF TRANSFER LINE
21ST FLOOR
1. BATH TUB FIXING
2. FINAL SANITARY FIXING INCLUDE KITCHEN ZINC ,SHOWER MIXTURE
&COUNTER WASHBASIN .
3. WATER METER CABINET
4. INSTALLATION OF TRANSFER LINE
22TH FLOOR
1. BATH TUB FIXING

2. FINAL SANITARY FIXING INCLUDE KITCHEN ZINC ,WC,BIDET,SHOWER


MIXTURE ,SHOWER TRAY,PEDSTRIAN WASH BASIN &COUNTER WASHBASIN .
3. WATER METER CABINET
4. INSTALLATION OF TRANSFER LINE
5. ACCOUSTIC LINING FOR HIGHLEVEL DRAINAGE LINE INSIDE ROOM AND
CORRIDOR

23RD FLOOR
1. BATH TUB FIXING
2. FINAL SANITARY FIXING INCLUDE KITCHEN ZINC ,WC,BIDET,SHOWER HEAD
&COUNTER WASHBASIN .
3. WATER METER CABINET
4. INSTALLATION OF TRANSFER LINE
5. ACCOUSTIC LINING FOR HIGHLEVEL DRAINAGE LINE INSIDE ROOM AND
CORRIDOR
6. HIGHLEVEL DRAINAGE LEAK TEST
7. PPR PIPE INSTALLATION AND LEAK TEST
24TH FLOOR
1. BATH TUB FIXING
2. FINAL SANITARY FIXING INCLUDE KITCHEN ZINC ,WC,BIDET,SHOWER
&COUNTER WASHBASIN .
3. WATER METER CABINET
4. INSTALLATION OF TRANSFER LINE
5. ACCOUSTIC LINING FOR HIGHLEVEL DRAINAGE LINE INSIDE ROOM AND
CORRIDOR
6. HIGHLEVEL DRAINAGE PIPE INSTALLATION AND LEAK TEST
7. PPR PIPE INSTALLATION AND LEAK TES
ROOF FLOOR
1. GRP TANK INSTALLATION,CONNECTION AND TESTING
2. BOOSTER PUMP INSTALLATION AND CONNECTION

SHAFT
1. INSTALLATION AND LEAK TEST OF WATER TRANSFER LINE FROM BASEMENT
3 TO ROOF FLOOR.
2. INSTALLATION OF WATER SUPPLY LINE FROM ROOF .

AIR CONDITIONING REMAINING WORKS


BASEMENT 3
1. PLENUM BOX,MOUTH CONNECTION ,,FLEXIBLE DUCT ,MOUTH CONNECTION
ACESS DOOR AND GRILLS ,DIFFUSER INSTALLATION.
2. A/C DRAIN CONNECTION
3. THERMOSTAT WIRE CONNECTION AND FIXING
4. CO SENSOR INSTALLATION
BASEMENT 2
1. PLENUM BOX,MOUTH CONNECTION ,,FLEXIBLE DUCT ,MOUTH CONNECTION
ACESS DOOR AND GRILLS ,DIFFUSER INSTALLATION.
2. A/C DRAIN CONNECTION
3. THERMOSTAT WIRE CONNECTION AND FIXING
4. CO SENSOR INSTALLATION
BASEMENT -1
1. PLENUM BOX,MOUTH CONNECTION ,,FLEXIBLE DUCT ,MOUTH CONNECTION
ACESS DOOR AND GRILLS ,DIFFUSER INSTALLATION.
2. A/C DRAIN CONNECTION
3. THERMOSTAT WIRE CONNECTION AND FIXING
4. CO SENSOR INSTALLATION
5. CONTROL PANEL INSTALLATION
6. VALVE FIXING IN ETS ROOM AND PUMP ROOM
GROUND FLOOR
1. SUPPLY DUCT,RETURN DUCT ,PLENUM BOX,MOUTH CONNECTION ,FRESH
AIR ,,EXHAUST ,FLEXIBLE DUCT ,MOUTH CONNECTION ACESS DOOR AND

1ST

GRILLS ,DIFFUSER INSTALLATION.


2. A/C DRAIN CONNECTION
3. THERMOSTAT WIRE CONNECTION AND FIXING
FLOOR
1. SUPPLY DUCT,RETURN DUCT ,PLENUM BOX,MOUTH CONNECTION ,FRESH
AIR ,,EXHAUST ,FLEXIBLE DUCT ,MOUTH CONNECTION ACESS DOOR AND
GRILLS ,DIFFUSER INSTALLATION.
2. A/C DRAIN CONNECTION
3. THERMOSTAT WIRE CONNECTION AND FIXING

4. BTU METER INSTALLATION.


2ND FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
3RD FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
4TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
5TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
6TH FLOOR
1.
2.
3.
4.

FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.


THERMOSTAT WIRE CONNECTION AND FIXING
BTU METER INSTALLATION
MOTORIZED FIRE DAMPER INSTALLATION

7TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
8TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
9TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
10TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
11TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION

12TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
13TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
14TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
15TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
16TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
17TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
18TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
19TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
5. WIRE MESH INSTALLATION
20TH FLOOR
1.
2.
3.
4.
5.

FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.


THERMOSTAT WIRE CONNECTION AND FIXING
BTU METER INSTALLATION
MOTORIZED FIRE DAMPER INSTALLATION
WIRE MESH INSTALLATION

21ST FLOOR
1.
2.
3.
4.

FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.


THERMOSTAT WIRE CONNECTION AND FIXING
BTU METER INSTALLATION
MOTORIZED FIRE DAMPER INSTALLATION

5. WIRE MESH INSTALLATION


22TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
5. AC DRAIN CONNECTION
6. SUPPLY DUCT,RETURN DUCT ,PLENUM BOX,MOUTH CONNECTION ,FRESH
AIR ,,EXHAUST ,FLEXIBLE DUCT ,MOUTH CONNECTION ACESS DOOR AND
GRILLS ,DIFFUSER INSTALLATION.
7. WIRE MESH INSTALLATION
8. VCD&FD INSTALLATION

23RD FLOOR
1.
2.
3.
4.
5.
6.

FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.


THERMOSTAT WIRE CONNECTION AND FIXING
BTU METER INSTALLATION
MOTORIZED FIRE DAMPER INSTALLATION
AC DRAIN CONNECTION
SUPPLY DUCT,RETURN DUCT ,PLENUM BOX,MOUTH CONNECTION ,FRESH
AIR ,,EXHAUST ,FLEXIBLE DUCT ,MOUTH CONNECTION ACESS DOOR AND

GRILLS ,DIFFUSER INSTALLATION.


7. WIRE MESH INSTALLATION
8. PRESSURE TEST
9. VCD&FD INSTALLATION
10. CHILLED WATER PIPE& VALVE INSTALLATION AND INSULATION
11. FCU INSTALLATION

24TH FLOOR
1. FLEXIBLE DUCT GRILLS &DIFFUSER INSTALLATION.
2. THERMOSTAT WIRE CONNECTION AND FIXING
3. BTU METER INSTALLATION
4. MOTORIZED FIRE DAMPER INSTALLATION
5. AC DRAIN CONNECTION
6. SUPPLY DUCT,RETURN DUCT ,PLENUM BOX,MOUTH CONNECTION ,FRESH
AIR ,,EXHAUST ,FLEXIBLE DUCT ,MOUTH CONNECTION ACESS DOOR AND
GRILLS ,DIFFUSER INSTALLATION.
7. WIRE MESH INSTALLATION
8. PRESSURE TEST
9. VCD&FD INSTALLATION
10. CHILLED WATER PIPE& VALVE INSTALLATION AND INSULATION
11. FCU INSTALLATION
ROOF FLOOR
1. FAN FIXING IN ROOF AND TOP ROOF
2. FRESH AIR AND EXHAUST AIR DUCT ON ROOF
3. VALVE FIXING OF FAHU
4. INSTALLATION OF SOUND ATTENUATOR
SHAFT
1. PRESSURISATION RISER STAIR CASE ONE FROM 14TH FLOOR TO ROOF

2. NECK CONNECTION FOR PRESSURISATION LOBBY DUCT,STAIR CASE DUCT


3. FRESH AIR AND EXHAUST DUCT BRANCH CONNECTION TO FLOOR.