Reference List

LOGO

On-Going and Recently


Completed Projects

Bauer International Philippines


Regalia Park Tower Cubao, Q.C.
Philippines 1109
P.O. Box 10154 Q.C.

wps.cn/moban

On-Going Project
CLARK WATER DEEP WELL 39
Clark Freeport Zone, Pampanga
1. Introduction
Water Concessionaire
Design and Build of
Deepwell 39
Water Treatment Plant
For Iron and Manganese
Ultimate Capacity: 2160
m3/day

wps.cn/moban

On-Going Project
LAGUNA WATER MARKET AREA
Supply of Labor and Materials
Sta. Rosa, Laguna
For Fabrication, Supply and
Water Concessionaire
Introduction
Installation
of Iron and Manganese
Ultimate1.Capacity:
4
Using DMI-65
MLD

wps.cn/moban

On-Going Project
LAGUNA WATER- PULONG
1.

Sta. Rosa, Laguna


Water Concessionaire
Introduction

Supply of Labor and Materials


For Fabrication, Supply and
Installation of Iron and Manganese
Using DMI-65
Ultimate Capacity: 4 MLD

wps.cn/moban

Recently Completed Project


RC COLA ISABELA
Cauyan, Isabela
1. Introduction
Beverage Plant
Supply and Installation of
Wastewater Treatment Plant
Using Dynamic SBR System
Ultimate Capacity:
912m3/day

wps.cn/moban

Recently Completed Project


RC COLA CANLUBANG
1. Introduction

Canlubang, Laguna
Beverage Plant
Design, Supply and
Installation
Of Reverse Osmosis
System
Ultimate Capacity: 490
m3/day

wps.cn/moban

Recently Completed Project


MAYNILAD PALTOK PROJECT
Brgy. Paltok, Quezon City
Water and Wastewater
1. Introduction
Concessionaire
Design, Supply and
Installation
And Construction of
Sewage Treatment Plant
Using MBRR

Ultimate Capacity: 4900 m3/day

wps.cn/moban

Recently Completed Project


MAYNILAD LEGAL PROJECT
1. Introduction

Legal St., Brgy. Sangandaan Quezon


City
Water and Wastewater
Concessionaire
Design, Supply, Installation,
Testing, and Comissioning
of the SBR Electro
Mechanical Works System
for the Upgrading of Legal
Communal Septic Tank
Ultimate Capacity: 409
m3/day

wps.cn/moban

Recently Completed Project


MAYNILAD GRANT PROJECT
Design, Supply, Installation,
Grant St., Brgy. Sangandaan Quezon City
Testing, and Comissioning of the
1. Introduction SBR Electro Mechanical Works
Water and Wastewater
System for the Upgrading of
Concessionaire
Grant Communal Septic Tank
Ultimate Capacity: 621 m3/day

wps.cn/moban

Recently Completed Project


PHILIP MORRIS PHILS., INC.
Fortune Ave, Brgy. Fortune,
Marikina, Philippines
Cigarette Manufacturing
Plant
Domestic and Industrial
Interconnection to
Centralized WWTP
Ultimate Capacity: 40
m3/day