QUANTITY
SURVEYING

Initial Stage

Skills

Scope Limit

1. Study the drawings


/Understanding Structural
elements

1. Doors and Windows

2. Visulasize / imagingation
the buildings in 3
dimensional veiw

3. Countertop/Vanity tops

2. Signages

4. Hand rails

Second Stage

Skills

1. To know all creteria


mentioned in the intial stage
2.Assist to intial stage persons
3. Study & Understand the
Scope of works / Specifications

Scope Limit

1.Concrete elements take of


2.Masonary items
3.Finish items
4.Excavation

1. Study the drawings


/Understanding Structural
elements

1. Doors and Windows

2. Visulasize / imagingation
the buildings in 3
dimensional veiw

3. Countertop/Vanity tops

3. Studying & Understand


the method of
measurements
4. Study and
understanding the
BOQ description
5. Identify the BOQ with

reference to spec/ general


notes/ drawings before
commencing the take of
6. Prepare/understand the Take
of Format
7.Doubt clarify if any
8.Commencing the take of.

2. Signages

1. To know all creteria


mentioned in the intial stage
2.Assist to intial stage persons

1.Concrete elements take of


2.Masonary items
3.Finish items

4. Hand rails

3. Study & Understand the


Scope of works / Specifications

5.Furniture

4. Raising RFI's

5.Partitions wall

6. Curtain / Blinds

5. Double clarifications if any

7. Masonry structure for small


structure

6. Checking their take of


before link with final BOQ

6. External finishes for small


structures

7. Understanding Preambles

4.Excavation

ONSTRUCTION SERVICES PVT.LTD

Third Stage

Skills

1.Concrete elements take of

1. BOQ Preparation

2.Masonary items

2. Checking the take of

3.Finish items

3. Identifying additional items


which is not mentioned the
BOQ

4.Excavation

Scope Limit

1. Excavation for complicate


structures
2. Structrual steel
quantifications
3. External finishes

1.Concrete elements take of

1. BOQ Preparation

2.Masonary items

2. Checking the take of

3.Finish items

3. Identifying additional items


which is not mentioned the
BOQ

4.Excavation
5.Partitions wall
6. External finishes for small
structures

4. Linking the qunatities with


BOQ
5. Format Creating / Checking

1. Excavation for complicate


structures
2. Structrual steel
quantifications
3. External finishes
4. External works
5 Landscape work
6 ID Finishes