Beruflich Dokumente
Kultur Dokumente
Upstrea
m Flow
Depth
dg
(m)
d0
(m)
Flow
Depth
Above
Jump
d1
(m)
0.020
0.025
0.030
0.035
0.040
0.045
0.336
0.244
0.217
0.138
0.105
0.088
0.014
0.024
0.021
0.027
0.032
0.036
Flow
Depth
Below
Jump
d3
(m)
0.069
0.065
0.073
0.081
0.083
0.083
Flow
Rate
V1
H
d1
0.043
0.011
0.023
0.018
0.012
0.009
2.00
1.60
1.33
1.14
1.00
0.89
3.071
0.458
1.095
0.667
0.375
0.250
Q
(m3/s)
0.012
0.012
0.012
0.012
0.012
0.012
Q = AV
V = Q/A
A = dg
2. Calculate
H
d1
H
d1
and plot
dc
against
d3
d1
d3
d1
dc
d3
0.014
0.055
0.069
0.024
0.055
0.065
25
30
d3
d1
4.929
2.708
3.476
3.000
2.594
2.306
35
40
0.021
0.055
0.073
0.027
0.055
0.081
0.032
0.055
0.083
0.036
0.055
0.083
45
CASE 2
Weir breadth = 0.3mm
Weir
Opening
dg (m)
0.020
Upstream
Flow
Depth d0
(m)
0.237
Downstre
am Flow
Depth d1
(m)
0.018
Flow rate
q
Gate
Thrust
(m3/s)
0.012
Fg (N)
-1.678
0.025
0.194
0.022
0.012
0.030
0.138
0.025
0.012
0.035
0.120
0.027
0.012
0.040
0.112
0.031
0.012
0.045
0.100
0.034
0.012
0.084
140.09
-9.41
0.129
57.21
-18.72
0.217
35.44
-26.50
0.292
25.43
-30.00
0.357
14.84
-42.79
0.450
106
-0.635
-7.27
106
-0.763
230.97
106
-0.939
dg
d0
106
-1.071
Fg
Fh
106
-1.318
Hydrostat
ic Thrust
FH (N)
106