Sie sind auf Seite 1von 1

4 x 210 MW : CSTPS : CHANDRAPUR

EVENT

ANALYSIS

1. Event No. 7

REPORT

Time 01:00 hrs.

UNIT NO. 2
Date 17.04.08

2. Operating conditions at the time of Event :


Load

Coal Cycles in service

Oil Support

179 MW

A,B,C,E,F

NIL

3. Nature of Event: Unit tripped on Bus differential protection due to system problem.
4. Observations: Nil

5. Analysis As per Grid control room (400 KV), during control cable laying work At GCR end ,set
tripped on Bus differential protection. Due to system problem.
6. Works carried out by maintenance section: Nil

7. Works carried out for the restoration by operation :


Boiler lighted up

Time - 16:55 hrs.

Date 17.04.2008

T-A Set Synchronised

Time - 22:26 hrs.

Date 17.04.2008

8. Recommendations to avoid reoccurrence :


a) Short term Nil
b) Long term Nil

9. Remarks

Nil